参考文献/References:
References
[ 1] 杨耀红, 汪应洛, 王能民.工程项目工期成本质量模糊均衡优化研究[ J] .系统工程理论与实践, 2006(7):112-117.
YANG Yao-ho ng ,WANG Ying-luo , WANG Neng-min.Fuzzy Tradeoff Optimization of Time-Cost-Quality in Co nstruction
Project [ J] .Sy stems Enginee ring-theo ry & Practice , 2006(7):112-117 .
[ 2] 王 健, 刘尔烈, 骆 刚.工程项目管理中工期-成本-质量综合均衡优化[ J] .系统工程学报, 2004 , 19(2):148-153 .
WANG Jia n, L1U E-r lie , LUO Gan .Analy sis o f time-co st-quantity tradeo ff o ptimiza tion in Co nst ruction pro ject
management[ J] .JOURNAL OF S YSTEMS ENGINEERING , 2004, 19(2):148-153.
[ 3] 高兴夫, 胡程顺.工程项目管理的工期-费用-质量综合优化研究[ J] .系统工程理论与实践, 2007, 10 :112-117 .
GAO Xing-fu , H U Cheng shun, ZHONG Denghua .Study Sy nthesis Optimiza tion of Time-Co st-Quality in Pro ject
Management[ J] .Systems Eng ineering-theo ry & Practice , 2007, 10 :112-117 .
[ 4] 张连营, 张金平, 王 亮.工程项目资源均衡的遗传算法及其MA TLAB 实现[ J] .管理工程学报:2004, 1:52-55 .
ZH ANG Lian-y ing , ZH ANG Jin-ping , WANG Liang .Genetic Alg orithms Based on MATLAB of Co nst ruc tion
Project Reso urce Leve ling [ J] .Jo urna l of I ndust rial Enginee ring and Enginee ring M anag ement :2004 , 1 :52-55 .
[ 5] 骆 刚, 刘尔烈, 王 健.遗传算法在网络计划资源优化中的应用[ J] .天津大学学报, 2004 , 37(2):179-183 .
LUO Gang , LIU Er-lie , WANG Jian.Reso urce Planning Optimizatio n in Ne two rk Schedule Using Ge netic Alg orithm
s[ J] .Jour nal of Tianjin Univer sity :2004 , 37(2):179-183 .
[ 6] CH EN Po-Ha n, WENG Hai-jie .A tw o-pha se GA model for resour ce-constrained pro ject scheduling[ J] .Automatio
n in Constructio n:2009 , 18 :485-498.
[ 7] ZH ENG Daisy X M , TH OMAS S Ng , KUMARASWAMY Mo han M .Applying a Genetic Alg orithm-Based Multio
bjec tiveAppr oach fo r Time-Co st Optimization[ J] .Jo urnal of Construction Eng ineering and Management , 2004, 4:
168-176 .
[ 8] 赵志鹏, 董红斌.一种新的基于遗传操作的改进型遗传算法[ J] .计算机应用与软件, 2008, 1 :235-237.
ZH AO Zhi-peng , Dong Ho ng-bin .A NEW IMPROVED GENETIC ALGORITH M BASED ON GENETIC OPERATION[
J] .Computer Applications and So ftwa re , 2008, 1:235-237.
[ 9] Khaled El-Ray es .Time-Cost-Qua lity trade-o ff analy sis fo r hig hway constructio n[ J] .Jo ur nal o f Constructio n Eng ineering
and M anag eme nt :2005 , 131(4):477-486 .
[ 10] 周树发, 刘 莉.工程网络计划中的多目标优化问题[ J] .华东交通大学学报:2004, 21(2):11-13 .
ZHOU Shu-fa , ZHOU Li .Pro blems o f Multi-objectives in Netwo rk project[ J] .Jo urnal of East China Jiao tong Unive
rsity :2004 , 21(2):11-13 .
[ 11] 陈砚祥, 刘晓君.既有居住建筑节能改造筹资问题探讨[ J] .西安建筑科技大学学报:自然科学版, 2010 , 42(6):
841-845.
CH EN Yan-xiang , LIU Xiao-jun .S tudy o n the financing fo r the ene rgy saving r eco nstr uction of residential building
s[ J] .J.Xi′an Univ .of Ar ch .& Tech .:Na tur al Science Editio n , 2010 , 42(6):841-845 .
相似文献/References:
[1]杨秋侠,杜 娴,杜 珊.场地平土和雨水管网的综合优化设计[J].西安建筑科技大学学报:自然科学版,2012,44(02):238.[doi:10.15986/j.1006-7930.2012.02.015]
YANG Qiu-xia,DU Xian,DU Shan.The integrated optimal design for ground leveling and layout of rainwater pipe[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2012,44(03):238.[doi:10.15986/j.1006-7930.2012.02.015]