[1] 张亚梅,秦鸿根.再生混凝土配合比设计初探[J].混凝土与水泥制品,2002(1):7-9.
ZHANG Ya-yin,QIN Hong-gen.Primary proportion design of recycled concrete[J].China Concrete and Cement Products,2002(1):7-9.
[2] 刘佩玺,徐永清,刘福胜.钢筋混凝土结构粘结滑移分析在ANSYS中的实现[J].山东农业大学学报:自然科学版,2007,38(1):125-130.
LIU Pei-xi,XU Yong-qing,LIU Fu-sheng. Realization of RC structure Bond-Slip Analysis with ANSYS[J].Journal of Shandong Agriculture University: Natural Science,2007, 38(1): 125-130.
[3] 刘云平,包华,洪俊青等.ANSYS的接触分析在钢筋混凝土滑移中的应用[J].南通大学学报:自然科学版,2009,8(2):70-73.
LIU Yun-ping,BAO Hua,HONG Jun-qing et al.Application of ANSYS-Based Contact Analysis in Reinforced Concrete Sliding[J].Journal of Nantong University:Natural Science Edition, 2009,8(2): 70-73.
[4] 宋锦虎,贺瑞霞,马 欢.纵向非均匀锈蚀钢筋拉拔过程的有限元分析[J].四川建筑科学研究,2011,37(1):70-74.
SONG Jin-hu,HE Rui-xia,MA Huan.Finite element analysis of pull-out tests on longitudinally and non-uniformly corroded steel bar[J].Sichuan Building Science, 2011, 37(1): 70-74.
[5] NILSSON A H.Internal measurement of bond-ship[J].ACI Journal,1972(7):242-245.
[6] MIRZA S M,Houde J.Study of bond stress-slip relationships in reinforced concrete[J]. ACI Journal,1979(1):462-466.
[7] 宋玉普,赵国落.钢筋与混凝土之间的粘结滑移性能研究[J].大连工学院学报,1987(2):93-100.
SONG Yu-pu,ZHAO Guo-fan.Study of Bond-Slip Property between Steel Bars and the Concrete[J]. Journal of Dalian Institute of Technology,1987(2):93-100.
[8] 徐有邻.变形钢筋-混凝土粘结锚固性能的试验研究[D].北京:清华大学,1990.
XU You-lin.Experimental study on deformation of bond anchorage performance of reinforced-concrete[D]. Beijing:Tsinghua University,1990.
[9] LUTZ L A.Analysis of stresses in concrete near a reinforcing bar due to bond and transverse cracking[J].ACI Journal,1970(10):276-287.
[10] REINHARDT H W,BLAAUWENDRAAD,J Vos E.Prediction of bond between steel and concrete by numerical analysis[J].Materials and Structures,1984(7/8):1245-1256.
[11] RABCZUK T.AKKERMANN J.EIBL J.A numerical model for reinforced concrete structures[J]. International Journal of Solids and Structures,2005(42):1327-1354.
[12] 王艺霖.钢筋与混凝土粘结性能的若干问题研究[D].武汉:华中科技大学,2005.
WANG Yi-lin. Research on Some Issues of Bond Performance between Steel bar and Concrete.[D]. Wuhan:Huazhong University of Science and Technology,2005.
[13] 沈聚敏,王传志,江见鲸.钢筋混凝土有限元与板壳极限分析[M].北京:清华大学出版社,1993.
SHEN Ju-min,WANG Chuan-zhi,JIANG Jian-qiong.Theanalysis of reinforced concrete finite element and Shell limit[M]. Beijing: Tsinghua University Press,1993.
[14] 张伟平,张 誉.锈胀开裂后钢筋混凝土粘结滑移本构关系研究[J].土木工程学报,2001,34(5):40-44.
ZHANG Wei-ing,ZHANG Yu.Bond-slip Constitutive Relations Research of Corrosive Reinforced Concrete after Cracking[J].China Civil Engineering Journal,2001,34(5): 40-44.
[15] 向 伟.钢筋混凝土梁锈蚀主筋与混凝土粘结性能退化规律与预计模型研究[D].徐州:中国矿业大学,2007.
XIANG Wei.Corrosion of reinforced concrete beam main reinforcement and concrete bonding property degradation rules and prediction model research[D].Xuzhou:China University of Mining and Technology,2007.
[16] 洪小健,张 誉.粘结滑移试验中的粘结应力的拟合方法[J].实验研究,2000(3):44-48.
HONG Xiao-jian,ZHANG Yu.The Fitting Method of the SmoothBond stress in the Bond-Slip Test[J]. Structural Engineers,2000(3):44-48.
[17] 卫 军,王艺霖,罗晓辉.钢筋拉拔试验中粘结应力分布的曲线拟合[J].铁道科学与工程学报,2005,2(2):22-24.
WEI Jun,WANGYi-lin,LUO Xiao-hui.Curve fitting method of bond stress distribution in steel bar pullout test[J].Journal of Rail Way Science and Engineering,2005,2(2): 22-24.