参考文献/References:
[1] 陈 平,吴 清,张卫喜.开封玉皇阁整体顶升保护技术[J].西安建筑科技大学学报:自然科学版,2011,43(4):470-473.
CHEN Ping,WU Qing,ZHANG Wei-xi.Lifting Yuhuang Pavilion intrgrally[J].J.Xi′an Univ.of Arch. & Tech:Natural Science Edition,2011,43(4):470-473.
[2] 刘宝琛,张家生.近地表开挖引起的地表沉降的随机介质方法[J].岩石力学与工程学报,1995,14(4):289-296.
LIU Bao-chen,ZHANG Jia-sheng.Stochastic method for ground subsidence due to near surface excavation[J].Chinese Journal of Rock Mechanics and Engineering,1995,14(4): 289-296.
[3] 阳军生,刘宝琛.挤压式盾构隧道施工引起的地表移动及变形[J].岩土力学,1998,19(3):10-13.
YANG Jun-sheng,LIU Bao-chen.Ground surface movement and deformation due to tunnel construction by squeezing shield[J].Rock and Soil Mechanics,1998,19(3):10-13.
[4] 韩 煊.隧道施工引起地层位移计建筑物变形预测的实用方法研究[D].西安:西安理工大学,2006.
HAN Xuan. The analysis and prediction of tunneling-induced building deformations[D], Xi′an: Xi′an University of Technology,2006.
[5] BURLAND J B,STANDING J R,JARDINE F M.Building response to tunneling.Case studies from construction of the Jubilee Line Extension.Volume 1:Projects and methods[M]. London: Thomas Telford Publishing, 2001.
[6] 中华人民共和国住房和城乡建设部.GB 50007-2011建筑地基基础设计规范[S].北京:中国建筑工业出版社,2011.
Ministry of Housing and Urban-Rural Development of the Peoples Republic of China.GB 50007-2011Code for design of building foundation[S].Beijing: China Architecture & Building Press,2011.