[1] 张生瑞, 周伟. 高速公路建设项目的神经网络综合评价方法研究[J]. 中国公路学报, 2001, 14(4):91-95.
ZHANG Shengrui, ZHOU Wei. Research on the comprehensive evaluation method of highway construction by neural network[J]. China Journal of Highway and Transport, 2001,14(4):91-95.
[2] 张志霞, 陈永锋, 邵必林. 层次模糊决策模型在公路交通网综合评价中的应用[J]. 西安建筑科技大学学报: 自然科学版, 2004,36(1):75-78.
ZHANG Zhixia, CHEN Yongfeng, SHAO Bilin. The use of level fuzzy decision model for the general evaluation of road traffic web[J]. J. Xi’an Univ. of Arch. &Tech.: Natural Science Edition, 2004, 36(1):75-78.
[3] 朱辉, 李沛才, 陈绍莹. 公路网现状综合评价[J]. 长安大学学报: 自然科学版, 2005, 25(5): 79-82.
ZHU Hui, LI Peicai, CHEN Shaoying. Synthetic evaluation of highway network actuality[J]. Journal of Chang’an University: Natural Science Edition, 2005, 25(5): 79-82.
[4] 许宏科, 王维敏, 王世伟. 高速公路隧道运营管理模糊综合评价[J]. 西安建筑科技大学学报: 自然科学版, 2005, 37(3): 381-385.
XU Hongke, WANG Weimin, WANG Shiwei. Fuzzy evaluation on the operation management of highway tunnel [J]. J. Xi’an Univ. of Arch. &Tech: Natural Science Edition, 2005, 37(3):381-385.
[5] 丛卓红, 郑南翔, 闫红光. 半刚性基层材料路用性能综合评价方法[J]. 交通运输工程学报, 2011, 11(4):23-28.
CONG Zhuohong, ZHENG Nanxiang, YAN Hongguang. Comprehensive evaluation method of semi rigid base mixture’s pavement performance[J]. Journal of Traffic and Transportation Engineering, 2011, 11(4):23-28.
[6] 武同乐, 徐岳. 公路旧桥加固效果综合评价方法[J]. 交通运输工程学报, 2005,5(1):28-32.
WU Tongle, XU Yue. Comprehensive evaluation method of bridge strengthening effectiveness[J]. Journal of Traffic and Transportation Engineering, 2005, 5(1): 28-32.
[7] 巩航军, 李百川. 模糊综合评价法在道路运输企业安全评价中的应用[J]. 安全与环境学报, 2006,6(3):54-57.
GONG Hangjun, LI Baichuan. Application of fuzzy comprehensive evaluation method in road transportation enterprises safety evaluation[J]. Journal of Safety and Environment, 2006, 6(3):54-57.
[8] 马祥辉. 复合式路面反射裂缝处置措施研究[D]. 济南:山东大学, 2008.
MA Xianghui. Research on the Reflection Crack’s Control Measures of Composite Road[D].Jinan: Shandong University, 2008.
[9] 孙涛. 复合式路面反射裂缝机理与防治措施研究[D].重庆:重庆交通大学, 2009.
SUN Tao. Research on mechanism and anti-crack measure of reflection crack of composite pavement[D]. Chongqing: Chongqing Jiaotong University, 2009.
[10] 杜栋,庞庆华,吴炎. 现代综合评价方法与案例精选[M].北京:清华大学出版社, 2008.
DU Dong, Pang Qinghua, Wu Yan. Modern comprehensive assessment method and case selection [M]. Beijing: Tsinghua University Publishing House, 2008.
[11] PRAKASH Prachee, YELLABOINA Sailu, RANJAN Aash, et al. Computational prediction and experimental verification of novel IdeR binding sites in the upstream of Mycobacterium tuberculosis open reading frames[J].Bioinformatics, 2005, 21(10): 2161-2166.
[12] 陕西省交通运输厅. 陕西省公路养护工程预算定额[M]. 北京:人民交通出版社, 2012.
Shaanxi Provincial Transport Department. Shaanxi highway maintenance engineering quota and budget[M]. Beijing: China Communications Press.
[13] JTJ075.2-2001.公路沥青路面养护技术规范[S]. 北京:人民交通出版社, 2001.
JTJ075.2-2001. Technical Specifications for Maintenance of Highway Asphalt Pavement[S]. Beijing: China Communications Press, 2001.
[14] JTG H20-2007. 公路技术状况评定标准[S]. 北京:人民交通出版社, 2007.
JTGH20-2007. Highway Performance Assessment Standards[S]. Beijing: China Communications Press, 2007.