[1] 杨明, 胡厚田 , 卢才金, 等. 路堑土质边坡加固中预应力锚索框架的内力计算[J]. 岩石力学与工程学报, 2002, 21(9): 1383-1386.
YANG Ming, HU Houtian, LU Caijin, et al. Internal force calculation of pretested anchor-rope frame for highway slope [J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(9): 1383-1386.
[2] 曹兴松, 周德培. 软岩高边坡预应力锚索框架梁的一种新型设计方法[J]. 公路交通科技, 2004, 21(8): 25-28.
CAO Xingsong, ZHOU Depei. A new design method of prestressed anchor rope framework for high slope in weak rockmass[J]. Journal of Highway and Transportation Research and Development, 2004, 21(8): 25-28.
[3] 王全才, 李传株, 赵肃菖, 等. 黄土滑坡锚固技术研究[J]. 铁道工程学报, 1996, 50(2): 206-210.
WANG Quancai, LI Chuanzhu, ZHAO Shuehang, et al. Research on technique against landslide of loess mass[J]. Journal of Rail Way Engineering Society, 1996, 50(2): 206-210.
[4] 李德芳, 张友良, 陈从新. 边坡加固中预应力锚索地梁内力计算[J]. 岩土力学, 2000, 21(6):170-172.
LI Defang, ZHANG Youliang, CHEN Congxin. Design of prestressed-cable sommer for slope-reinforcing engineering[J]. Rock and Soil Mechanics, 2000, 21(6):170-172.
[5] 吴荣燕, 吕小平.框架锚索中框架内力计算的差分法[J].四川建筑, 2003, 23(4):55-56.
WU Rongyan, LÜ Xiaoping. Internal force calculation of cable frame by difference method [J]. Sichuan Construction, 2003, 23(4):55-56.
[6] 王育锋, 樊凤利. 弹性连续介质上变截面梁的分析[J]. 天津城建学院学报, 2002, 8(2): 107-111.
WANG Yufeng, FAN Fengli. Analysis of non-uniform beam on elastic continuous medium[J]. Journal of Tianjin Institute of Urban Construction, 8(2): 107-111.
[7] 廖理扬. 弹性地基梁两种内力计算方法比较[J]. 武汉水利电力大学学报, 1997, 30(2):45-48.
LIAO Liyang. Two methods’ comparison of computing internal forces for beam on elastic foundation[J]. J. Wuhan Univ. of Hydr & Elec. Eng, 1997, 30(2):45-48.
[8] 肖世国, 周德培. 岩石高边坡一种预应力锚索框架型地梁的内力计算[J]. 岩土工程学报, 2002, 22(4): 479-482.
XIAO Shiguo, ZHOU Depei. A calculation method for internal force of pre-stressed anchor-rope frame beam on foundation on high rock slope[J]. Chinese Journal of Geotechnical Engineering, 2002, 24(9):479-482.
[9] 宋从军, 周德培. 预应力锚索框架地梁的内力计算[J]. 公路, 2004(7): 76-80.
SONG Congjun, ZHOU Depei. A calculation method of internal force for frame foundation beams with prestressed a anchor cable[J]. High Way, 2004(7): 76-80.
[10] 王志俭, 宁万辉, 赵家成. 锚杆格构梁系统格构梁内力计算方法分析[J]. 三峡大学学报:自然科学版, 2010, 32(6): 47-50.
WANG Zhijian, NING Wanhui, ZHAO Jiacheng. Analysis of calculation methods for internal force of lattice beam[J]. J. of China Three Gorges Univ.: Natural Sciences, 2010, 32(6):47-50.
[11] 朱大鹏, 晏鄂川 , 宋琨. 格构梁与边坡岩体相互作用机制与现场试验研究[J]. 岩石力学与工程学报, 2009, 28(1): 2947-2953.
ZHU Dapeng, YAN Echuan, SONG Kun. Research on interaction mechanism between lattice beam and slope rock mass and field test[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(1): 2947-2953.
[12] 刘晶晶, 赵其华, 彭社琴, 等. 预应力锚索格构梁作用下边坡土中应力分布的室内模型试验研究[J]. 水文地质工程地质, 2006, 33(4): 9-12.
LIU Jingjing, ZHAO Qihua, PENG Sheqin, et al. On indoor model experiment of the action of prestressed anchor-rope and lattice beam on slope soil stress distribution[J]. Hydrogeology and Engineering Geology, 2006, 33(4): 9-12.
[13] 秦新义, 朱大鹏, 施忠然. 预应力锚索格构梁的设计及试验研究[J]. 长江科学院院报, 2008, 25(5): 148-152.
QIN Xinyi, ZHU Dapeng, SHI Zhongran. Design and experimental investigation on prestressed anchor-cable lattice beam[J]. Journal of Yangtze River Scientific Research Institute, 2008, 25(5): 148-152.
[14] 彭社琴, 赵其华. 预应力锚索格构模型试验加载系统设计[J]. 岩土力学, 2005, 26(2): 151-154.
PENG Sheqin, ZHAO Qihua. Design of loading system of model test for prestressed anchor enable frame structure[J]. Rock and soil Mechanics, 2005, 26(2): 151-154.
[15] 王娟娟. 预应力锚杆格构梁模型试验及计算方法研究[D]. 西安: 长安大学, 2006.
WANG Juanjuan, Study on the model test and calculation of the priestess lattice beam anchor[D]. Xi’an: Chang’an university, 2006.