参考文献/References:
[1] 中华人民共和国铁道部.铁运函[2004]120 号. 铁路桥梁检定规范[S]. 北京: 中国铁道出版社, 2004.
The ministry of railways of the People’s Republic of China. Trains letter [2004] No. 120. Railway bridge verification code [S]. Beijing:China Railway Press, 2004.
[2] 高晓燕, 张浩, 张晓炜, 等. 蒲山特大桥静动载试验及质量评定[J]. 中外公路, 2010, 30(4): 360-364.
GAO Xiaoyan, ZHANG Hao, ZHANG Xiaowei, et al. PuShan bridge on static and dynamic load test and quality evaluation [J]. Journal of China and Foreign Highway, 2010 ,30(4):360-364.
[3] 孙建平. 大跨度铁路系杆拱桥静动载试验研究[J]. 铁道建筑, 2012(9): 29-32.
SUN Jianping. Long-span railway arc bridge static and dynamic load test research [J]. Railway Engineering, 2012(9): 29-32.
[4] 陈昀明, 韦建刚, 陈宝春. 泉州百崎湖大桥静动载试验分析研究[J]. 公路工程, 2009, 34(5): 104-108.
CHEN Yunming, WEI Jiangang, CHEN Baochun. Static and dynamic tests and analysis of baiji lake bridge [J]. Highway Engineering, 2009, 34(5): 104-108.
[5] 丘弋. 下承式系杆拱桥的荷载试验分析[J]. 中国勘察设计, 2012(8): 84-89.
QIU Yi. The load test analysis of a tied arch bridge [J]. China survey and design, 2012(8): 84-89.
[6] 中华人民共和国交通部.YC4-4/1982 大跨径混凝土桥梁的试验方法[S].北京: 人民交通出版社, 1982.
The ministry of communications of the People’s Republic of China.YC4-4/1982The test method of long-span concrete bridge [S]. Beijing: People’s Traffic Press, 1982.
[7] 中华人民共和国铁道部.铁建设函[2005]285 号. 新建时速200 公里客货共线铁路设计暂行规定[S]. 北京:中国铁道出版社, 2005.
The ministry of railways of the People’s Republic of China. Railwayconstruction letter [2005] No.285. New 200 km/h mixed collinear railway design regulations [S]. Beijing: China Railway Press, 2005.