[1]顾清华,卢才武,冯治东,等. 地下矿井巷施工及采矿生产过程的4D时空变化动态模拟技术[J].西安建筑科技大学学报(自然科学版),2016,48(04):610-616.[doi:10.15986/j.1006-7930.2016.04. 025]
 GU Qinghua,LU Caiwu,FENG Zhidong,et al. The dynamic simulation technology of underground mine construction and mining production based on 4D spatial and temporal data[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2016,48(04):610-616.[doi:10.15986/j.1006-7930.2016.04. 025]
点击复制

 地下矿井巷施工及采矿生产过程的4D时空变化动态模拟技术()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
48
期数:
2016年04期
页码:
610-616
栏目:
出版日期:
2016-08-31

文章信息/Info

Title:
 The dynamic simulation technology of underground mine construction and mining production based on 4D spatial and temporal data
文章编号:
1006-7930(2016)04-0610-07
作者:
 顾清华1卢才武1冯治东2白春妮1
 (1. 西安建筑科技大学管理学院,陕西 西安 710055;2. 榆林学院信息工程学院,陕西 榆林 719000)
Author(s):
 GU Qinghua1 LU Caiwu1 FENG Zhidong2 Bai Chunni1
 (1. School of Management, Xi′an University of Architecture and Technology, Xi′an 710055, China;
2.School of Information Engineering, Yulin University, Yulin 719000,China)
关键词:
 井巷施工采矿生产4D时空动态模拟
Keywords:
 roadway construction mining production 4D spatio-temporaldynamic simulation
分类号:
TU459.9
DOI:
10.15986/j.1006-7930.2016.04. 025
文献标志码:
A
摘要:
 井巷施工及采矿生产的4D时空动态过程模拟建模是重现施工及采矿活动历史状态、跟踪当前采矿活动状态变化、预测未来施工及开采进度的关键技术.本文首先根据井巷施工及采矿生产数据对象特点的不同,将研究对象划分为点、线、面、体四类,利用Oracle Spatial提供的对象-关系模型,构建了适用于描述地下矿施工及采矿4D时空变化的动态数据模型,然后分别设计了四类对象的时空变化数据结构,并对4D时空数据的动态查询进行了对比优化,最后通过实例提出了进行地下矿井巷施工及采矿生产过程4D时空变化动态模拟的具体步骤和方法.实例表明:本文提出的地下矿井巷施工及采矿生产过程的时空变化动态模拟技术,具有空间数据格式统一、查询分析效率高、实用性强的优点,为井巷施工及采矿生产的4D可视化奠定了基础.
Abstract:
Simulation of 4D spatio-temporal dynamic model of roadway construction and mining production is very important in 4D. It is a key technique to show the history of construction and mining, track mining production activities and predict future construction and mining schedule. In this paper, according to different characteristics of mining data, four different data objects are performed, i.e points, lines, surfaces and bodies. Using the Object-Relation model of Oracle Spatial, the 4D spatio-temporal data object model is designed. There are four different spatio-temporal data structures from four objects. The query of 4D spatio-temporal data is studied and optimized. Finally, an example is put forward to give the steps and methods to realize the simulation of roadway construction and mining production in underground mine. Examples show that the dynamic simulation technology of underground construction and mining production based on 4D spatial and temporal data has advantages of unified spatial data format, high query and analytical efficiency and practicability

参考文献/References:

 参考文献 References
[1] BUCKLEY J. Monitoring the vibration response of a tunnel boring machine:application to real time boulder detection[J]. Dissertations & Theses Gradworks, 2015, 34-37.
[2] Han K K, Golparvar-Fard M. Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs[J]. Automation in Construction, 2015, 53:44-57..
[3] 熊书敏,王李管,陈忠强等. 地下矿可视化管控系统空间数据模型[J]. 计算机应用. 2012,32(2):581-584
XIONG shumin,WANG liguan,CHEN zhongqiang et al,Patial data model for underground mine 3D visual reduction management and control system[J],Journal of Computer Applications,2012,32(2):581-584
[4] 侯运炳,魏书祥,胡乃联. 地下矿井巷工程 CAD 及造型系统 3DMS 的研究与开发[J]. 北京科技大学学报. 1998(3):205-210
HOU yunbing, WEI shuxiang, Hu nailian. Research and development of computer aided underground mining
design and solid modeling system 3DMGS[J], Journal of
University of Science and Technology Beijing, 1998(3):205-210
[5] 郭达志,杨维平,韩国建.矿山地理信息系统中的空间和时间四维数据模型[J].测绘学报.1993,22(1):33-40
GUO dazhi, YANG weiPing, HAN guojian. A spatial and temporal 4D data model for mine GIS[J], Acta Geodaetica Et Cartographic Sinica, 1993,22(1):33-40
[6] 王云帆.Oracle Spatial 空间数据存储管理技术的应用研究[J].测绘通报, 2011( 6) : 76-79.
WANG yunfan. On the application of oracle spatial spatial data memory management technique[J], Bulletin of Surveying and Mapping, 2011( 6) : 76-79
[7] 宋伟东,陈虎维,李兰勇. 露天矿采场时空数据模型的构建与应用[J].测绘工程. 2009,18(5):1-5
SONG weidong, CHEN huwei, LI lanyong. Establishment and application for spatio-temporal data models of an open-pit stope[J]. Engineering of Surveying and Mapping, 2009,18(5):1-5
[8] 胡长明, 熊焕军, 龙辉元,等. 基于BIM的建筑施工项目进度-成本联合控制研究[J]. 西安建筑科技大学学报(自然科学版), 2014, 46(4):474-478
HU Changming, XIONG Huanjun, LONG Huiyuan et al. Study on cost and schedule combined control of 4D model based on building information modeling(BIM)[J], Xi’an Univ. of Arch. &Tech: Natural Science Edition, 2014, 46(4):474-478

相似文献/References:

[1]白成军、,吴 葱,狄亚静.基于材份制的文物建筑测绘精度分析[J].西安建筑科技大学学报(自然科学版),2015,47(04):560.[doi:10.15986/j.1006-7930.2015.04.017]
 BAI Chengjun,WU Cong,DI Yajing.Surveying and mapping of cultural relic building based on the material system accuracy analysis[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2015,47(04):560.[doi:10.15986/j.1006-7930.2015.04.017]
[2]郝 玲,李子萍,李志民.安全视野下中小学校校园入口交通组织规划研究[J].西安建筑科技大学学报(自然科学版),2015,47(04):587.[doi:10.15986/j.1006-7930.2015.04.022]
 HAO Ling,LI Ziping,LI Zhimin.Research on the traffic organization planning of urban primary and middle school campus in the perspective of security[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2015,47(04):587.[doi:10.15986/j.1006-7930.2015.04.022]
[3]陈延信1,2,施寿芬1,等.外循环式高固气比分解炉气相流场的数值模拟[J].西安建筑科技大学学报(自然科学版),2011,43(01):48.[doi:DOI:10.15986/j.1006-7930.2011.01.004]
 ,,et al.The numerical simulation of flow-fieldin high solid to gas ration external circulating precalciner[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2011,43(04):48.[doi:DOI:10.15986/j.1006-7930.2011.01.004]
[4]王 琰1,2,李志民1,等.大学整体化教学楼群的概念及建构研究[J].西安建筑科技大学学报(自然科学版),2011,43(01):85.[doi:DOI:10.15986/j.1006-7930.2011.01.023]
 ,,et al.Conception analysis and construction mode studyon holistic classroom building group on university campus[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2011,43(04):85.[doi:DOI:10.15986/j.1006-7930.2011.01.023]
[5]方永恒,许 晶.产业集群系统协同演化动力模型研究[J].西安建筑科技大学学报(自然科学版),2011,43(01):113.[doi:DOI:10.15986/j.1006-7930.2011.01.010]
 .Dynamic model of collaborative evolution of industrial cluster[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2011,43(04):113.[doi:DOI:10.15986/j.1006-7930.2011.01.010]
[6]徐 捷.大型振动台基础大体积混凝土防止裂缝产生的质量控制措施[J].西安建筑科技大学学报(自然科学版),2011,43(01):131.[doi:DOI:10.15986/j.1006-7930.2011.01.027]
 Quality control measures preventing cracks in mass concretefoundation of large scale shaking tabl[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2011,43(04):131.[doi:DOI:10.15986/j.1006-7930.2011.01.027]
[7]宋 宏,刘晓君,胡 振.地铁对沿线住宅户型面积影响的实证分析[J].西安建筑科技大学学报(自然科学版),2011,43(02):237.[doi:DOI :10.15986/j .1006-7930.2011.02.023]
 SONG Hong,L IU X iao-jun,HU Zhen.The substantial evidence analysis of the influence of Xi′an of metro on the distribution of flat design[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2011,43(04):237.[doi:DOI :10.15986/j .1006-7930.2011.02.023]
[8]黄 义,等.刚体位移的补充方法及对壳单元有限元解的影响分析[J].西安建筑科技大学学报(自然科学版),2011,43(03):305.[doi:DOI :10.15986/j .1006-7930.2011.03.001]
 HUANG Yi,DAN Yong,et al.A method of adding rigid body displacements and the analysisof convergence in shell element[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2011,43(04):305.[doi:DOI :10.15986/j .1006-7930.2011.03.001]
[9]崔晓玲,等.带端柱高性能混凝土剪力墙承载力分析[J].西安建筑科技大学学报(自然科学版),2011,43(03):367.[doi:DOI :10.15986/j .1006-7930.2011.03.020]
 CUI X iao-l ing,LIA NG Xing-wen,et al.Loading capacity of high performance concrete shear wall with end columns[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2011,43(04):367.[doi:DOI :10.15986/j .1006-7930.2011.03.020]
[10]张 雄,鲁 辉,张永娟,等.矿渣活性激发方式的研究进展[J].西安建筑科技大学学报(自然科学版),2011,43(03):379.[doi:DOI :10.15986/j .1006-7930.2011.03.003]
 Z HANG X iong,LU Hui,Z H AN GYong-juan,et al.Research progress of slag activation[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2011,43(04):379.[doi:DOI :10.15986/j .1006-7930.2011.03.003]

备注/Memo

备注/Memo:
收稿日期:2015-08-05 修改稿日期:2016-07-25
基金项目:国家自然科学基金资助项目(51404182);陕西省重点学科建设专项资金资助项目(E0801)
作者简介:顾清华(1981?),男,副教授,博士,主要研究方向为信息应用技术、BIM及数字矿山、系统建模等.Email:qinghuagu@126.com
更新日期/Last Update: 2016-10-30