[1]李辉,杜莎芳,李恒,等.奔龙坪偏压连拱隧道施工方案比选及监测分析[J].西安建筑科技大学学报(自然科学版),2017,49(04):485-491.[doi:10.15986/j.1006-7930.2017.04.004]
 LI HuiDU ShafangLI HengSONG ZhanpingSHI Botai.Construction sequence comparison and numerical analysis of Benlongping shallow and unsymmetrical pressure multi arch tunnel[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2017,49(04):485-491.[doi:10.15986/j.1006-7930.2017.04.004]
点击复制

奔龙坪偏压连拱隧道施工方案比选及监测分析()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
49
期数:
2017年04期
页码:
485-491
栏目:
出版日期:
2017-09-10

文章信息/Info

Title:
Construction sequence comparison and numerical analysis of Benlongping shallow and unsymmetrical pressure multi arch tunnel
文章编号:
1006-7930(2017)04-0485-07
作者:
李辉1杜莎芳1李恒1宋战平1师伯泰2
(1. 西安建筑科技大学 土木工程学院,陕西 西安 710055 ;2. 中铁九局集团有限公司,辽宁 沈阳 110013)
Author(s):
LI Hui1DU Shafang1LI Heng1SONG Zhanping1SHI Botai2
(1. School of Civil Engineering, Xian Univ . of arch . & Tech ., Xian 710055, China; 2. China Railway No .9 Group Co, Ltd, Shenyang 110013, China)
关键词:
双连拱隧道浅埋偏压数值试验施工方案现场监测
Keywords:
double-arch tunnel shallow and unsymmetrical pressure numerical simulation construction sequence monitoring data
分类号:
U452
DOI:
10.15986/j.1006-7930.2017.04.004
文献标志码:
A
摘要:
针对在建龙瑞高速公路奔龙坪浅埋傍山大断面双连拱隧道施工稳定性问题,基于数值仿真模拟试验,分析了大断面双连拱隧道不同施工方案引起的隧道-支护结构位移及应力的变化,研究了不同施工步序参数条件下的隧道拱顶沉降、净空收敛位移及连拱隧道中隔墙水平位移的变化特性;分析了不同施工步序参数条件下的隧道支护结构应力状况的变化.基于隧道-支护结构位移及应力的变化特点,推荐了隧道最优的施工方案及施工步序参数.跟踪隧道施工进行的现场监测表明:奔龙坪隧道采用“先浅埋侧而后深埋侧隧道,先、后行隧道开挖距离相差2倍隧道跨度”的施工方案合理、可行,保证了隧道的施工的安全
Abstract:
In the tunnel and underground engineering construction, different construction sequence will cause a huge difference in the tunnel distortion and stress characteristics . For the construction stability problems of Long Rui Highway under construction, Benlongping shallow hillside large cross section double arch tunnel, based on numerical simulation testing, the changes of the support structure displacement and stress of the large span of double -arch tunnel in different construction program are analyzed,the crown settlement, convergence clearance displacement and changing characteristics of the level of the middle partition wall with construction step sequence under different conditions of construction step sequence parameters are analyzed. The variation of tunnel support structure under different conditions of construction step sequence parameters is studied . Based on the variation characteristics of the displacement and stress of the tunnel support structure, the optimal construction scheme of the Ben Long Ping shallow double -arch tunnels under unsymmetrical pressure is recommended, and the construction step sequence parameters are determined. The monitoring of the displacement and stress of the track tunnel construction show that the construction scheme of the shallow double -arch tunnels under unsymmetrical pressure with “first shallow buried tunnel side after the deep side of the tunnel, the excavation distance of the former tunnel and later tunnel difference of 2 times the span of the tunnel ” is reasonable and feasible, so the safety of the construction of shallow buried and unsymmetrical large section arch tunnel is guaranteed

参考文献/References:

References

[1]刘涛,沈明荣,袁勇. 偏压连拱隧道围岩稳定性模型试验与数值分析[J]. 同济大学学报(自然科学版), 2008(4): 460-465.

LIU Tao, SHEN Mingrong, YUAN Yong. Model test and 3D numerical simulation study on wall rock mass stability of double -arch tunnel subject to partial press[J]. Journal of Tongji University (Natural Science Edition), 2008(4): 460 -465.

[2]段海澎,徐干成,刘保国. 富溪偏压连拱隧道围岩与支护结构变形和受力特征分析[J]. 岩石力学与工程学报, 2006(S2): 3763-3768.

DUAN Haipeng, XU Gancheng, LIU Baoguo. Analysis of deformation of surrounding rock and stress characteristics of supporting structure of FuXi twin tunnel [J]. Chinese Journal of Rock Mechanics and Engineering, 2006(S2): 3763 -3768.

[3]季毛伟,吴顺川,高永涛,等. 双连拱隧道施工监测及数值模拟研究[J]. 岩土力学, 2011,32(12): 3787-3795.

JI Maowei, WU Shunchuan, GAO Yongtao, et al. Construction monitoring and numerical simulation of multi -arch tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2011 ,32(12): 3787-3795.

[4]赵阳,王伟笔,杨昌能. 偏压浅埋连拱隧道施工过程的三维数值模拟[J]. 中南公路工程, 2005,30(2): 181-184.

ZHAO Yang, WANG Weibi, YANG Changneng. 3D numerical simulation for construction of shallow double arched tunnel under bias pressure [J]. Central South Highway Engineering, 2005 ,30(2): 181-184.

[5]李术才,王书法,朱维申,等. 台湾软弱岩盘隧道变形预估系统数值模拟研究[J]. 岩土工程学报, 2001(5): 540-543.

LI Shucai, WANG Shufa, ZHU Weishen, et al. Research on numerical simulation of deformation of soft rockmass tunnels in Taiwan [J]. Chinese Journal of Geotechnical Engineering, 2001(5): 540 -543.

[6]朱正国,乔春生,高保彬. 浅埋偏压连拱隧道的施工优化及支护受力特征分析[J]. 岩土力学, 2008(10): 2747-2752,2758.

ZHU Zhengguo, QIAO Chunsheng, GAO Baobin. Analysis of construction optimization and supporting structure under load of shallow multi -arch tunnel under unsymmetrical pressure[J]. Rock and Soil Mechanics, 2008(10): 2747 -2752,2758.

[7]周玉宏,赵燕明,程崇国. 偏压连拱隧道施工过程的优化研究[J]. 岩石力学与工程学报, 2002,21(5): 679-683.

ZHOU Yuhong, ZHAO Yanming, CHENG Chongguo. Optimum analysis on the construction pressure for joint arch tunnels in partial pressure [J]. Chinese Journal of Rock Mechanics and Engineering, 2002 ,21(5): 679-683.

[8]邓少军,阳军生,张学民,等. 浅埋偏压连拱隧道施工数值模拟及方案比选[J]. 地下空间与工程学报, 2005,1(6): 940-943.

DENG Shaojun, YANG Junsheng, ZHANG Xuemin, et al. Numerical simulation of construction and excavating scheme for shallow multi -arch tunnel under unsymmetrical pressure[J]. Chinese Journal of Underground Space and Engineering, 2005 ,1(6): 940-943.

[9]胡学兵,乔玉英. 偏压连拱隧道施工方法数值模拟研究[J]. 地下空间与工程学报, 2005,1(3): 374-378.

HU Xuebing, QIAO Yuying. Numerical analysis of construction method for partial press double -arch tunnel[J]. Chinese Journal of Underground Space and Engineering, 2005 ,1(3): 374-378.

[10]王胜辉,杜小平,袁勇,等. 不同开挖工序对连拱隧道中墙的影响[J]. 岩土力学, 2004(7): 1102-1106.

WANG Shenghui, DU Xiaoping, YUAN Yong, et al. Effects of different excavating sequences on mid -partition of double-arched tunnel[J]. Rock and Soil Mechanics, 2004(7): 1102 -1106.

[11]刘元雪,蒋树屏,赵尚毅. 浅埋黄土连拱隧道施工方案优化研究[J]. 地下空间与工程学报, 2005,1(6): 944-947.

LIU Yuanxue, JIANG Shuping, ZHAO Shangyi. Optimizing analysis for construction schemes of shallow multi -arch loess tunnel[J]. Chinese Journal of Underground Space and Engineering, 2005 ,1(6): 944-947.

[12]胡庆安,夏永旭,王文正. 双连拱隧道施工过程的三维数值模拟[J].长安大学学报(自然科学版), 2005(1): 48-50,76.

HU Qingan, XIA Yongxu, WANG Wenzheng. 3D numerical simulation on double -arch tunnel′s construction process[J]. Journal of Chang′an University(Natural Science Edition), 2005(1): 48 -50,76.

[13]申玉生,高波. 双连拱隧道施工偏压力学特性的监测与分析研究[J]. 岩土力学, 2006(11): 2061-2065.

SHEN Yusheng, GAO Bo. Site monitoring and analytical research on mechanical characteristics under construction partial press in double -arch tunnel[J]. Rock and Soil Mechanics, 2006(11): 2061 -2065.

[14]李辉,刘可,宋战平,等. 偏压连拱隧道结构荷载计算及监测分析[J]. 地下空间与工程学报, 2017(2): 422-427.

LI Hui, LIU Ke, SONG Zhanping,et al . Calculation of biased arch tunnel structure load and analysis of field monitoringl[J]. Chinese Journal of Underground Space and Engineering, 2017(2): 422 -427.

[15]张志强,何川. 偏压连拱隧道优化施工的研究[J]. 岩土力学, 2007(4): 723-727,732.

ZHANG Zhiqiang, HE Chuan. Research on optimized construction procedure for double -arched tunnel in unsymmetrical pressure[J]. Rock and Soil Mechanics, 2007(4): 723 -727,732.

[16]丁文其,王晓形,李志刚,等. 龙山浅埋大跨度连拱隧道施工方案优化分析[J]. 岩石力学与工程学报, 2005(22): 4042-4047.

DING Wenqi, WANG Xiaoxing, LI Zhigang, et al . Optimal analysis of construction schemes for shallow large span longshan twin tunnel [J]. Chinese Journal of Rock Mechanics and Engineering, 2005(22): 4042 -4047.

[17]王述红. 大跨度浅埋隧道工程地质特征及自稳能力分析[J]. 东北大学学报, 2005(11): 94-97.

WANG Shuhong. Analysis of engineering geological characteristics and self stability of shallow and unsymmetrical pressure tunnel [J]. Journal of Northeastern Uniwersity, 2005(11):94-97.

[18]许研,王述红,朱浮声. 大跨度岩体隧道工程块体滑落的概率分析[J]. 东北大学学报, 2003(6): 593-596.

相似文献/References:

[1]张成良,张金瑞,曹孟潇,等.不同侧覆土厚度条件下连拱隧道的偏压特性研究[J].西安建筑科技大学学报(自然科学版),2019,51(06):839.[doi:10.15986/j.1006-7930.2019.06.010]
 ZHANG Chengliang,ZHANG Jinrui,CAO Mengxiao,et al.Study on bias characteristics of multi arch tunnel under different side overburden thickness[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(04):839.[doi:10.15986/j.1006-7930.2019.06.010]

备注/Memo

备注/Memo:
收稿日期:2016-08-06修改稿日期:2017-07-15
基金项目:国家自然科学基金(51578447)
第一作者:李辉(1963-),女,学士,副教授,主要从事岩土工程领域的教学与科研工作. E -mail:lihyt@xauat.edu.cn
通讯作者:宋战平(1974-),男,博士,教授,主要从事岩土工程领域的教学和科研工作.E-mail:songzhpyt@xauat.edu.cn
更新日期/Last Update: 2017-09-11