参考文献/References:
[1]RICO M, BENITO G, SALGUEIRO A R, et al. Reported tailings dam failures:a review of the European incidents in the worldwide context[J]. Journal of Hazardous Materials, 2008, 152(2):846-852.
[2]SEED H B. Evaluation of soil liquefation effects on level ground during earthquake[C]//Liquefaction Problems in Geotechnical engineering. Philadelphia: PA ASCE National Convention, 1976.
[3]FOURIE A B, BLIGHT G E, PAPAGEORGIOUS G. Static liquefaction as a possible explanation the merrispruit tailings dam failure[J].Canadian Geotechnical Journal, 2001, 38:707-719.
[4]ZANDARIN M T, OLDECOP L A, RODRIGUEZ R, et al. The role of capillary water in the stability of tailing dams [J]. Engineering, Geology, 2009,105(1):108-118.
[5]VAEZI G F, Sanders R S, Masliyah J H. Flocculation kinetics and aggregate structure of kaolinite mixtures in laminar tube flow[J].Journal of Colloid and Interface Science, 2011, 355(1):96-105.
[6]何学秋,王云海,梅国栋. 基于流变-突变理论的尾矿坝溃坝机理及预警准则研究[J]. 中国安全科学学报, 2012, 22(9): 74-77.
HE Xueqiu, WANG Yunhai, MEI Guodong. Study on mechanism and forecasting criterion of tailings dam-break based on the theory of rheology mutation[J]. China Safety Science Journal, 2012, 22(9): 74-77.
[7]郑欣,许开立,魏勇. 尾矿坝溃坝致灾机理研究[J]. 中国安全生产科学技术, 2008, 4(5): 8-11.
ZHENG Xin, XU Kaili, WEI Yong. Study on the disaster causing mechanism of the tailings dam falling [J]. Journal of safety Science and technology, 2008, 4(5): 8-11.
[8]李全明,张兴凯,王云海,等. 尾矿库溃坝风险指标体系及风险评价模型研究[J]. 水利学报, 2009, 40(8): 989-991.
LI Quanming, ZHANG Xingkai, WANG Yunhai, et al. Risk index system and evaluation model for failure of tailings dams [J]. Journal of Hydraulic Engineering, 2009, 40(8):989-991.
[9]林树彬. 白石嶂3#尾矿库库坝设计技术研究[D]. 广州:华南理工大学, 2011.
LIN Shubin. Critical technical problems research in the design of the Baishizhang No.3 tailings dam[D]. Guangzhou: South China University of Technology,2011.
[10]肖慧. 金山店锡冶山尾矿坝稳定性及加固研究[D]. 武汉:武汉科技大学, 2010
XIAO Hui. The stability analysis and reinforcement of Xi Ye Shan tailings dam in Jin Shan Dian[D]. Wuhan: Wuhan University of Science and Technology, 2010.
[11]黄伟. 吴坑里尾矿库坝体加高扩容稳定性分析[D]. 长沙:中南大学,2014.
HUANG Wei. The stability analysis on elevated and expanded Wukengli tailings dam[D]. Changsha: Central South University, 2014.
[12]柴军瑞, 李守义, 李康宏, 等. 米箭沟尾矿坝加高方案渗流场数值分析[J]. 岩土力学, 2015, 26(6):973-977.
CHAI Junrui, LI Shouyi, LI Kanghong, et al. Numerical analysis of seepage field in Mijiangou tailings dam to be designed to increase the dam height[J]. Rock and Soil Mechanics, 2015, 26(6):973-977.
[13]宋传旺,于广明. 基于应力场与渗流场耦合的尾矿坝稳定性[J]. 辽宁工程技术大学学报(自然科学版),2013,32(5):602-605.
SONG Chuanwang, YU Guangming. Stability of tailings dam under coupled stress and seepage field[J]. Journal of Liaoning Technical University (Natural Science), 2013,32(5):602-605.
[14]陈承, 程三建,张亮. 降雨对良山太平尾矿坝稳定性影响分析[J]. 有色金属科学与工程, 2015,6(2):94-94.
CHEN Cheng, CHENG Sanjian, ZHANG Liang. Stability analysis of tailings dam in view of rainfall[J]. Nonferrous Metals Science and Engineering, 2015, 6(2):94-94.
[15]冉小小,万玲,魏作安. 采用ABAQUS对鱼祖乍尾矿坝数值模拟及稳定性分析[J]. 固体力学学报, 2013, 33(S): 306-312.
RAN Xiaoxiao, WAN Ling, WEI Zuoan. Numerical Simulation and stability analysis of Yuzuzha tailings dam by ABAQUS[J]. Chinese Journal of Solid Mechanics, 2013, 33(S): 306-312.
[16]李亮, 褚雪松. 浸润线深度对尾矿坝稳定性分析的影响研究[J]. 中国安全生产科学技术, 2011,7(11):20-23.
LI Liang, CHU Xuesong. Study on the effect of phreatic line depth on the evaluation of slope stability for tailing dam[J]. Journal of Safety Science and Technology, 2011,7(11):20-23.
[17]刘洋, 赵学同, 吴顺川. 快速冲填尾矿库静力液化分析与数值模拟[J]. 岩石力学与工程学报, 2014, 33(6): 1158-1167.
LIU Yang, ZHAO Xuetong, WU Shunchuan. Analysis of static liquefaction and numerical simulation for tailings pond under high deposting rates[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(6): 1158-1167.
[18]张铎,刘洋,吴顺川,等. 基于离散–连续耦合的尾矿坝边坡破坏机理分析[J]. 岩土工程学报, 2014, 36(8): 1473-1476.
ZHANG Duo, LIU Yang, WU Shunchuan. Failure mechanism analysis of tailing dams based on coupled discrete and continuous method[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(8): 1473-1476.
[19]霍紫玮, 尾矿坝溃决的数值模拟及应用研究[D]. 石家庄: 石家庄铁道学院, 2012.
HUO Ziwei. Study on numerical simulation of the tailings dam failure and its application[D]. Shijiazhuang: Shi Jiazhuang Railway University, 2012.
[20]吴龙梁,黄崧,经晶, 等. 尾矿坝特殊工况动力稳定性分析[J]. 广东工业大学学报, 2015, 32(2): 28-31.
WU Longliang, HUANG Song, JING Jing,et al. Dynamic stability analysis of the tailings dam under special working condition[J]. Journal of Guangdong University of Technology, 2015, 32(2): 28-31.
[21]尹光志,李愿,魏作安, 等. 洪水工况下尾矿库浸润线变化规律及稳定性分析[J]. 重庆大学学报, 2010, 33(3): 72-75.
YIN Guangzhi, LI Yuan, WEI Zuoan, et al. Regularity of the saturation lines′ change and stability analysis of tailings dam in the condition of flood[J]. Journal of Chongqing University, 2010, 33(3): 72-75.
[22]张超, 杨春和, 徐卫亚. 尾矿坝稳定性的可靠度分析[J]. 岩土力学, 2004, 25(11):1706-1710.
ZHANG Chao, YANG Chunhe, XU Yawei. Reliability analysis of tailings dam stability[J]. Rock and soil mechanics, 2004, 25(11):1706-1710.
[23]黄英华,徐必根,刘小林. 尾矿坝抗滑稳定性及影响因素敏感度分析研究[J]. 有色金属(矿山部分), 2009,61(4): 41-43.
HUANG Yinghua, XU Bigen, LIU Xiaolin. Study on the slide stability of tailings dam and sensitivity analysis of influencing factors[J]. Nonferrous Metals(Mining Section), 2009,61(4):41-43.
[24]张岳安, 周科平. 浸润线埋深对尾矿坝稳定性的指标满意度敏感性分析[J]. 中国安全科学学报, 2013, 23(10): 93-97.
ZHANG Yuean, ZHOU Keping. Sensibility analysis of saturation line depth to tailings dam stability with Index satisfaction degree[J]. China Safety Science Journal, 2013, 23(10):93-97.
[25]董陇军, 赵国彦, 宫凤强, 等. 尾矿坝地震稳定性分析的区间模型及应用[J]. 中南大学学报(自然科学版), 2011, 42(1): 164-167.
DONG Longjun, ZHAO Guoyan, GONG Fengqiang, et al. Interval analysis model of tailings dam seismic stability and its application[J]. Journal of Central South University (Science and Technology), 2011, 42(1): 164-167.
[26]王肖霞. 尾矿坝安全监测不确定性信息的处理及风险评估技术研究[D]. 太原: 中北大学, 2014.
WANG Xiaoxia. Research on uncertainty information processing and risk assessment in safety monitoring of tailings dam[D]. Taiyuan: North University of China, 2014.
[27]陈建宏,张涛,曾向农,等. 尾矿坝边坡稳定性仿真建模与安全分析[J]. 中南大学学报(自然科学版), 2008,39(4):635-639.
CHEN Jianhong, ZHANG Tao, ZENG Xiangnong, et al. Slope stability simulation modeling and safety analysis of tailings dam[J]. Journal of Central South University (Science and Technology), 2008, 39(4):635-639.
[28]张津嘉. 基于神经网络的尾矿坝稳定性可靠度分析及影响因素研究[D]. 昆明:昆明理工大学, 2011.
ZHANG Jinjia. Reliability analysis and influence factors of tailings dam stability based on Neural Network[D]. Kunming: Kunming University of Science and Technology, 2011.
[29]王飞跃. 基于不确定性理论的尾矿坝稳定性分析及综合评价研究[D].长沙:中南大学, 2009.
WANG Feiyue. Research on stability analysis and comprehensive assessment of the tailing dam based on the uncertainty theory[D]. Changsha: Central South University, 2009.
[30]YU G M,SONG C W. Applications of online monitoring technology for tailings dam of digital mine[J]. Transactions of Nonferrous Metals Society of China, 2011,21(3):604-609.
[31]李青石, 李庶林, 陈际经. 试论尾矿库安全监测的现状及前景[J]. 中国地质灾害与防治学报, 2011,22(1):99-103.
LI Qingshi, LI Shulin, CHEN Jijing. Discussion on the situation and prospect of safeguard for tailing pond[J]. The Chinese Journal of Geological Hazard and Control, 2011, 22(1): 99-103.
[32]于广明,宋传旺,吴艳霞, 等. 尾矿坝的工程特性和安全监测信息化关键问题研究[J]. 岩土工程学报, 2011,33(S1):49-52.
YU Guangming, SONG Chuanwang, WU Yanxia, et al. Engineering characteristics and key problems of security monitoring informatization for tailings dams[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(S1):49-52.
[33]王姝, 柴建设. 基于社会科学统计程序(SPSS)回归性分析的尾矿库事故预测模型[J]. 中国安全科学学报, 2008,18(12): 35-39.
WANG Shu, CHAI Jianshe. Accident prediction model for tailings reservoir eased on regression analysis of SPSS[J]. China Safety Science Journal, 2008, 18(12): 35-39.
[34]王云海,李娟,李春民. 尾矿坝浸润线数据挖掘预测模型的样本选取研究[J]. 中国安全生产科学技术,2009,5(5): 9-13.
WANG Yunhai, LI Juan, LI Chunming. Research of selecting the training samples for the infiltration route prediction model in tailing[J]. Journal of Safety Science and Technology, 2009, 5(5): 9-13.
[35]王飞跃,杨铠腾,徐志胜, 等. 基于浸润线矩阵的尾矿坝稳定性分析[J]. 岩土力学, 2009,30(3):840-844.
WANG Feiyue, YANG Kaiteng, XU Zhisheng, et al. Stability analysis of tailings dam based on saturation line matrix[J]. Rock and Soil Mechanics, 2009,30(3):840-844.
[36]王永强,张继春. 基于相似试验的尾矿库溃坝泥石流预测分析[J]. 中国安全科学学报, 2012,22(12):70-75.
WANG Yongqiang, ZHANG Jichun. Tailings dam-break debris flow prediction analysis based on similar tests[J]. China Safety Science Journal, 2012,22(12):70-75.
[37]邓静,盛建龙,黎矩宏. 基于GM(1,1)模型的尾矿坝坝体垂直位移预测[J]. 安全与环境工程, 2013,20(1): 143-146.
DENG Jing, SHENG Jianlong, LI Juhong. Vertical displacement prediction of tailings dam based on GM(1,1)[J]. Safety and Environmental Engineering, 2013,20(1): 143-146.
[38]聂志丹,刘剑,陈平,等. 尾矿库溃坝环境风险预测方法实例研究[J]. 环境科学与技术, 2014,37(120):550-554.
NIE Zhidan, LIU Jian, CHEN Ping,et al. A case study on environmental risk assessment method of mine tailings collapse[J].Environmental Science & Technology,2014,37(120): 550-554.
[39]聂娜娜,王英博,王铭泽. FOA 优化 GRNN 网络的尾矿库安全预测[J]. 中国安全生产科学技术, 2014,10(8): 39-43.
NIE Nana, WANG Yingbo, WANG Mingze. Safety prediction of mine tailing reservoir based on FOA-GRNN algorithm[J]. Journal of Safety Science and Technology, 2014,10(8): 39-43.
[40]梁形形. 尾矿库内水位对尾矿坝稳定性影响分析及其预警研究[D].昆明:昆明理工大学, 2010.
LIANG Xingxing. Research on analysis and pre-warming for the influence of water level on the stability of tailings dam [D].Kunming: Kunming University of Science and Technology, 2010.
[41]雷丁丁,李龙福,许乔峰. 尾矿坝浸润线预警研究[J]. 有色金属(矿山部分), 2014,66(4): 79-82.
LEI Dingding, LI Longfu, XU Qiaofeng. Study on early warning of tailings dam saturation line[J]. Nonferrous Metals(Mining Section), 2014,66(4): 79-82.
[42]史松海. 尾矿坝汛期坝体浸润线监测预警值研究[J]. 有色金属(矿山部分), 2013, 65(6):66-70.
SHI Songmei. Research on early-warning value of saturation line monitoring for tailings dam in flood season[J]. Nonferrous Metals(Mining Section), 2013, 65(6):66-70.
[43]李航. 尾矿库坝体稳定性及其灾变预警机制研究[D]. 大连:大连交通大学, 2011.
LI Hang. Study on the stability of tailing dam and disaster early-warning mechanism[D]. Dalian: Dalian Jiaotong University, 2011.
[44]胡珊,胡军. 基于灰系统的尾矿坝浸润线预警系统[J]. 计算机工程与设计, 2011,32(6): 2197-2200.
HU Shan, HU Jun. Tailings dam saturation line early alarming system based on grey system[J]. Computer Engineering and Design, 2011,32(6):2197-2200.
[45]林雪松,陈殿强,何峰. 尾矿坝浸润线干滩监测预警值的计算[J]. 水资源与水工程学报,2014,25(4):65-68.
LIN Xuesong, CHEN Dianqiang,HE Feng. Calculation of monitoring warning value of tailing dam′s seepage line and dry beach[J]. Journal of Water Resources & Water Engineering, 2014, 25(4):65-68.
[46]宋传旺,于广明,李亮. 基于R/S分析法的尾矿坝坝体位移趋势研究[J]. 矿业研究与开发, 2014,34(6): 41-43.
SONG Chuanwang, YU Guangming, LI Liang. Study on displacement tendency of tailings dam based on R/S analysis method[J]. Mining R & D, 2014,34(6):41-43.
[47]黄磊,苗放,王梦雪. 区域尾矿库安全监测预警系统设计与构建[J]. 中国安全科学学报, 2013,23(12):146-150.
HUANG Lei, MIAO Fang, WANG Mengxue. Designing and setting up a monitoring and early warning system for tailings ponds in a region[J]. China Safety Science Journal, 2013, 23(12):146-150.
[48]肖圣博. 尾矿库在线安全监测技术及其预警方法研究[D].长春:吉林大学, 2013.
XIAO Shengbo. Tailings dam online safety monitoring technology and study on its early warning method[D]. Chuanchun: Jilin University, 2013.
[49]杨波. 尾矿库在线安全监测及预警关键技术研究[D].武汉:中国地质大学, 2010.
YANG Bo. Research on the key technologies of tailings pond online safety monitoring and pre-warning[D]. Wuhan: China University of Geosciences, 2010.
[50]廖文景, 皇甫凯龙, 何易,等. 尾矿库实时监控与安全分析及预警耦合系统[J]. 中国安全科学学报, 2014,24(8):158-160.
LIAO Wenjing, HUANG Pu Kailong, HE Yi, et al. Integrated realtime monitoring, analyzing and analyzing pre-warning system for tailings reservoir[J]. China Safety Science Journal, 2014, 24(8):158-160.
[51]吴宗之,梅国栋. 尾矿库溃坝预警体系及预警方法研究[J]. 金属矿山, 2014(12): 198-202.
WU Zongzhi, MEI Guodong. Study on early-warning system and method for tailings dam failure[J]. Metal Mine, 2014(12): 198-202.
[52]梅国栋. 尾矿库溃坝机理及在线监测预警方法研究[D].北京:北京科技大学, 2014.
MEI Guodong. Research on mechanism and online early-warning method for tailings dam failure[D]. Beijing: University of Science and Technology Beijing,2014.
[53]谢旭阳,王云海, 张兴凯,等. 尾矿库区域预警指标体系的建立[J]. 中国安全科学学报, 2008, 18(5): 167-170.
XIE Xuyang, WANG Yunhai, ZHANG Xingkai, et al. Establishment of regional pre-waning index system for tailing reservoirs[J]. China Safety Science Journal, 2008, 18(5): 167-170.
[54]郑立安. 基于ZigBee技术的尾矿坝体安全监测预警系统研究与设计[D]. 太原: 太原理工大学, 2011.
ZHENG Lian. Design of tailings dam body security monitoring and early warning systems based on ZigBee technology[D].Taiyuan:Taiyuan University of Technology, 2011.
[55]刘正强,罗文斌. 安全在线监测预警系统在金山店铁矿锡冶山尾矿库的应用[J]. 金属材料与冶金工程, 2014, 42(1): 49-55.
LIU Zhengqiang, LUO Wenbin. Application of safety online monitoring and early warning system in Xiyeshan tailings dam of Jinshandian iron mine[J]. Metal Materials and Metallurgy Engineering, 2014, 42(1): 49-55.