[1]张成中,彭刚,胡晓鹏,等.施工期剪力墙结构可变荷载的调查统计分析[J].西安建筑科技大学学报(自然科学版),2018,50(01):37-44.[doi:10.15986/j.1006-7930.2018.01.007]
 ZHANG Chengzhong,PENG Gang,HU Xiaopeng,et al.Investigation and statistical analysis of variable loads of shear wall structures during construction[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2018,50(01):37-44.[doi:10.15986/j.1006-7930.2018.01.007]
点击复制

施工期剪力墙结构可变荷载的调查统计分析()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
50
期数:
2018年01期
页码:
37-44
栏目:
出版日期:
2018-03-15

文章信息/Info

Title:
Investigation and statistical analysis of variable loads of shear wall structures during construction
文章编号:
1006-7930(2018)01-0037-08
作者:
张成中 彭刚 胡晓鹏 朱勇
(西安建筑科技大学 土木工程学院, 陕西 西安 710055 )
Author(s):
ZHANG Chengzhong PENG Gang HU Xiaopeng ZHU Yong
(School of Civil Engineering, Xian Univ. of Arch. & Tech., Xian 710055, China)
关键词:
施工期可变荷载调查统计分析标准值概率分布类型
Keywords:
construction period variable loads investigation and statistical analysis standard value type of probabilitydistribution
分类号:
TU312
DOI:
10.15986/j.1006-7930.2018.01.007
文献标志码:
A
摘要:
近三年对西安市5个在建剪力墙结构的施工期可变荷载进行了调查,采用不同统计分析方法对调查结果进行了统计分析,研究了施工期可变荷载随施工过程的变化规律,分析了统计分析方法、建筑布局及施工单位等因素对施工期可变荷载的影响,给出了剪力墙结构各施工阶段施工期可变荷载标准值的建议值,并与相关研究成果进行了对比分析.研究结果表明:各工程施工期可变荷载的调查结果均服从极值Ⅰ型分布或指数分布;不同工程的施工期可变荷载随施工过程的变化规律基本相同,最大值出现在绑扎钢筋或拆支撑这两个阶段,最小值多出现在浇筑混凝土阶段;统计样本单元划分越细,得到的可变荷载标准值越大;工作面材料堆放越集中,不同统计分析方法得到的荷载标准值差异越大;随户内面积的增大,竖向构件施工阶段的施工期可变荷载值增大,水平构件施工阶段施工期可变荷载标准值先增大后减小;不同施工单位混凝土浇筑阶段的可变荷载值差异不大,其它施工阶段的差异较明显;将一个施工周期划分为竖向构件施工、搭支撑、水平构件施工及拆支撑四个施工阶段,各阶段施工期可变荷载标准值的建议取值分别为1.894 kN/m2、1.653 kN/m2、1.295 kN/m2、1.891 kN/m2
Abstract:
In past three years, variable loads of five shear wall structures during construction were investigated in Xi′an. Different statistical methods were conducted to analyse the survey results, and the change regularity of variable loads with the construction process were studied. The impact of statistical methods, building layout and construction companycon variable loads during construction was analyzed. Recommended values of variable loads standard value during the construction were given, and its were compared with other results. The results show that the investigation results of the variable loads during the construction are in accordance with extreme value I distribution or exponential distribution. Different project′s variable loads during construction has the same change regularity, the maximum load appears in steel bar binding or support demolition phase, the minimum load appears in concrete pouring stage. The smaller the statistical samples are divided, the greater the value of variable load is. The more concentrated the materials stacked, the greater the difference among the standard values obtained by different methods is. With the building area increase, the variable loads of building vertical component phase are greater, and the variable loads of building horizontal component phase increase first and then decrease. The construction company has little effect on the variable loads in concrete pouring stage, but the effect on other stages is obvious. A construction cycle are divided into four stages as vertical component construction, support building, horizontal component construction and support demolition, the recommended values of the variable loads during construction at each stage are 1.894 kN/m2, 1.653 kN/m2, 1.295 kN/m2, 1.891 kN/m2

参考文献/References:

[1]中华人民共和国住房与城乡建设部. 建筑施工安全技术统一规范:GB50870-2013[S].北京:中国计划出版社,2013.

Ministry of Housing and Urban-rural Development of the People′s Republic of China.Unified code for safety technology in construction: GB50870-2013 [S].Beijing: China Planning Press ,2013.

[2]BSI. Code of practice for falsework: BS5975-2008 [S]. London: British Standards Institution,2008.

[3]赵国藩.工程结构生命全过程可靠度[M].北京:中国铁道出版社,2004.

ZHAO Guofan. Life-cycle reliability degree in engineering structures [M]. Beijing : China Railway Publishing House, 2004.

[4]胡航.建筑施工期活荷载统计分析及荷载效应影响面分[D].北京:北京交通大学,2009.

HU Hang. Survey results for concrete construction live loads and analysis of load effects using influence surface[D]. Beijing:Beijing Jiaotong University,2009.

[5]AYOUB H, KARSHENAS S. Survey results for concrete construction live loads on newly poured slabs [J].Journal of Structural Engineering, 1994, 120(5):1543-1562.

[6]汪荣鑫.数理统计[M].西安:西安交通大学出版社,2002.

WANG Rongxin.Mathematical statistics[M]. Xi′an:Xi′an Jiaotong University Press, 2002.

[7]吴世伟.结构可靠度分析[M].北京:人民交通出版社, 1990.

WU Shiwei. Analysis of structural reliability[M]. Beijing: People′s Communication Press, 1990.

[8]李继华,林中民,李明顺,等.建筑结构概率极限状态设计[M] .北京:中国建筑工业出版社,1990.

LI Jihua, LIN Zhongmin, LI Mingshun, et al. Probabilistic limit state design of building structure [M].Beijing:China Building Industry Press, 1990.

[9]苗吉军,顾祥林,方晓铭.高层建筑混凝土结构施工活荷载的统计分析[J].建筑结构,2002,32(3):7-9.

MIAO Jijun, GU Xianglin, FANG Xiaoming. On-site measure and statistic of live construction load of high-rise concrete buildings[J]. Building Structure, 2002,32(3): 7-9.

[10]张传敏,方东平,耿川东.钢筋混凝土结构施工活荷载现场调查与统计分析[J].工程力学,2002,19(5):62-66.

ZHANG Chuanmin, FANG Dongping, GENG Chuandong. In situ investigation and statistical analysis of live loads of reinforced concrete buildings during construction[J]. Engineering Mechanics, 2002,19(5): 62-66.

[11]赵挺生,李树逊,顾祥林.混凝土房屋建筑施工活荷载的实测统计[J].施工技术,2005,7(3):63-65.

ZHAO Tingsheng, LI Shuxun, GU Xianglin.On-site measure and statistic of live construction load of concrete buildings [J].Construction Technology,2005,7(3):63-65.

[12]赵楠. 多层钢筋混凝土框架结构施工期可靠性分析[D].西安: 西安建筑科技大学,2008.

ZHAO Nan. Reliability analysis of multi-storey R.C. frame structure in construction period[D]. Xi′an:Xi′an University of architecture and technology ,2008.

[13]简超军,胡长明,叶正武.大跨度框架结构施工期活荷载现场调查与统计分析[J].施工技术, 2015,44(15):32-34.

JIAN Chaojun, HU Changming, YE Zhengwu. In situ investigation and statistical analysis of live loads of large span frame structure during construction[J]. Construction Technology, 2015,44(15): 32-34.

[14]谢楠,梁仁钟,胡杭.基于影响面的混凝土浇筑期施工荷载研究[J].工程力学,2011,28(10):173-178.

XIE Nan, LIANG Renzhong, HU Hang. Analysis of construction loads on formwork during concrete placement based on influence surface[J]. Engineering Mechanics, 2011,28(10): 173-178.

[15]梅源,胡长明,周正永,等.高大模板支撑体系在结构施工期内所受荷载统计分析[J].工业建筑,2010,40(2) : 41-46.

MEI Yuan, HU Changming, ZHOU Zhengyong, et al. Statistical analysis of loads of supporting structure for tall and large falsework during construction[J]. Industrial Construction, 2010 ,40(2):41-46.

[16]赵军,杨玉林.钢筋混凝土结构施工期活荷载统计与分析[J]. 桂林理工大学学报,2010,30(3): 356-359.

ZHAO Jun, YANG Yulin. Statistics analysis of live loads for reinforced concrete buildings construction[J]. Journal of Guilin University of Technology, 2010,30(3):356-359.

[17]ACI. Guide to Formwork for Concrete :ACI347R-2014[S]. Farmington Hills, USA:American concrete institute,2014.

[18]中华人民共和国住房与城乡建设部. 建筑施工模板安全技术规范:JGJ162-2014[S].北京:中国建筑工业出版社, 2014.


Ministry of Housing and Urban-rural Development of the People′s Republic of China. Technical code for safety of forms in construction :JGJ162-2014[S].Beijing: China Architecture & buiding press,2013.

相似文献/References:

[1]张丽丽,王 海,徐 龙,等.水电站地下洞室施工期湿环境机械通风除湿数值模拟研究[J].西安建筑科技大学学报(自然科学版),2016,48(02):282.[doi:10.15986/j.1006-7930.2016.02.024]
 ZHANG Lili,WANG Hai,XU Long,et al.Study on mechanical ventilation dehumidification for construction period moisture environment of hydropower station underground caverns[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2016,48(01):282.[doi:10.15986/j.1006-7930.2016.02.024]
[2]董振平,王静,胡晓鹏,等.施工期混凝土力学性能的试验研究[J].西安建筑科技大学学报(自然科学版),2018,50(06):788.[doi:10.15986/j.1006-7930.2018.06.004]
 DONG Zhenping,WANG Jing,HU Xiaopeng,et al.Experimental study on mechanical properties of concrete during construction period[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2018,50(01):788.[doi:10.15986/j.1006-7930.2018.06.004]

备注/Memo

备注/Memo:
收稿日期:2017-01-03修改稿日期:2017-12-12

基金项目:国家自然科学基金资助项目(51308441,51678473);陕西省自然科学基础研究计划(2016JM5073)

第一作者:张成中(1974-),男,博士,副教授,主要从事施工期混凝土结构可靠性研究.E-mail: chengzhongzhang@126.com
更新日期/Last Update: 2018-03-15