参考文献/References:
References
[1]The Associated General Contractors of America (AGC).Integrated project delivery for public and private owners[EB/OL].[2017-08-22].http://www.wbdg.org/projectmanagement/project-delivery-teams.
[2]KENT D C, BECERIKGERBER B. Understanding construction industry experience and attitudes toward integrated project delivery[J]. Journal of Construction Engineering & Management, 2010, 136(8):815-825. .
[3]张连营,汪炼念,谷李忠.IPD项目参与方合作关系质量演化[J].土木工程与管理学报,2015,32(4):1-7.
ZHANG Lianying,WANG Liannian,GU Lizhong. Revolution in collaboration relationship quality among project parties in IPD[J].Journal of Civil Engineering and Management,2015,32(04):1-7.
[4]杨艳平,罗福周,王博俊,等.工程分包模式下质量优化收益共享群体激励演化研究[J].西安建筑科技大学学报(自然科学版),2017,49(5):740-746.
YANG Yanping,LUO Fuzhou,WANG Bojun,et al. Research on the evolution of the quality optimization revenue sharing group incentive under the engineering subcontract mode[J].Journal of Xi’an Univ of Arch & Tech (Natural Science Edition),2017,49(5):740-746.
[5]郭玉莹,苏振民.IPD模式下基于Kan-BIM的项目信息协同管理研究[J].施工技术,2016,45(18):58-62.
GUO Yuying,SU Zhenmin. Research on information synergy management based on Kan-BIM in the mode of integrated project deliver[J]. Construction Technology, 2016,45(18):58-62.
[6] AIA NATIONAL, AIA CALIFORNIA COUNCIL. Integrated project delivery: a guide[EB/OL]. [2016-06-15]. http://www.aia.org/contractdocs/AIAS077630#ipdguide.
[7]张连营,王煜.情商视角下IPD项目知识共享对合作绩效的影响研究[J].项目管理技术,2016,14(7):11-16.
ZHANG Lianying, WANG Yu. Research on the impact of IPD project knowledge sharing on cooperative performance under the perspective of emotional intelligence[J]Project Management Technology,2016,14(7):11-16.
[8]李旻,李骁,基于合作博弈理论的IPD项目利润分配研究[J].生产力研究,2016(1):8-13,39.
LI Min, LI Xiao. Research on profit distribution of IPD project based on cooperative game theory[J]. Productivity Research,2016(01):8-13,39.
[9]马智亮,马健坤.消除建筑工程设计变更的定量激励机制[J].同济大学学报(自然科学版),2016,44(8):1280-1285.
MA Zhiliang, MA Jiankun. To eliminate the quantitative incentive mechanism of architectural engineering design change[J].Journal of Tongji University(Natural Science),2016,44(8):1280-1285.
[10] 王茹,王柳舒.基于IMOCS算法的IPD团队激励池动态分配问题研究[J].计算机工程与应用,2018,54(8):247-254.
WANG Ru, WANG Liushu. Study on dynamic allocation of IPD team incentive pool based on IMOCS algorithm[J].Computer Engineering and Applications,2018,54(8):247-254.
[11] 浦培根,吕文学.工程项目突发事件知识联盟利益分配研究[J].系统工程学报,2013,28(4):562-570.
PU Peigen, L Wenxue. Study on the interest distribution of the knowledge alliance of emergent events in engineering projects[J]Journal of Systems Engineering,2013,28(4):562-570.
[12] 陈哲,陈国宏.考虑公平参照点差异的建设项目绿色合作努力行为决策[J].控制与决策,2018,33(6):1107-1116.
CHEN Zhe, CHEN Guohong. Consider fair reference point difference construction project green cooperative effort behavior decision [J]Control and Decision,2018,33(06):1107-1116.
[13] ZHANG L, LI F. Risk/reward compensation model for integrated project delivery[J]. Engineering Economics, 2014, 25(5).558-567.
[14] 王德东,李凯丽,基于IPD模式的项目参与方利益分配研究[J].项目管理技术,2016,14(10):44-49.
WANG Dedong LI Kaili. Research on the benefit distribution of project participants based on IPD mode[J]. Project Management Technology,2016,14(10):44-49.
[15]丁继勇,王卓甫.建设工程项目交付方式与项目绩效研究综述[J].土木工程学报,2014,47(4):131-144.
DING Jiyong WANG Zhuopu. A review of project delivery methods and project performance[J]China Civil Engineering Journal,2014,47(4):131-144.
[16]李成华,李慧民,基于模糊层次分析法的建筑安全管理绩效评价研究[J].西安建筑科技大学学报(自然科学版),2009,41(2):207-212.