参考文献/References:
References
[1] 周顺华. 软弱地层浅埋暗挖施工中管棚法的棚架原理[J]. 岩石力学与工程学报, 2005, 24(14):2565-2570ZHOU Shunhua. Principles of pipe roof applied to shallow-buried tunnels in soft ground[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(14):2565–2570.
[2] 孙玉永,周顺华,肖红菊,等. 管棚法应用于软土地层的稳定性分析[J]. 岩石力学与工程学报,2013(S2):4199-4206.SUN Yuyong, ZHOU Shunhua, XIAO Hongju, et al. Application of piperoof method to stability analysis of soft ground[J]. Chinese Journal of Rock Mechanics and Engineering, 2013(s2):4199-4206.
[3] 董新平,周顺华,胡新朋. 软弱地层管棚法施工中管棚作用空间分析[J]. 岩土工程学报, 2006, 28(7):841-846.
[4] Okawa T, Yokoyama J, Ishihara H, et al. Effect of piperoof in tunneling method [J]. Japan Society of Civil Engineers Proceedings, 1985:100-107.
[5] Li Z, Zhang K, Huang C, et al. Analysis of the ground deformation to large cross- section tunnel by Piperoof Pre-construction Method[C]. Second International Conference on Mechanic Automation and Control Engineering. Neimenggu, IEEE, 2011:2889 - 2892.
[6] Yoo C, Shin H K. Deformation behaviour of tunnel face reinforced with longitudinal pipes—laboratory and numerical investigation[J]. Tunnelling & Underground Space Technology, 2003, 18(4):303-319.
[7]袁海清,傅鹤林,马婷,等. 隧道管棚加预注浆超前支护数值模拟分析[J]. 铁道科学与工程学报,2012,9(6):24-29.Numerical simulation analysis for pipe-shed and pre-grouting reinforcement of tunnel[J]. Journal of Railway Engineering Society, 2012, 9(6):24-29.
[8]郭衍敬,房倩,李兵. 浅埋暗挖地铁车站管棚的数值模拟及其加固效果分析[J]. 北京工业大学学报,2010,36(1):40-45GUO Yanjing, FANG Qian, LI Bing. Reinforcement mechanism and mechanical analysis for pipe roof support used in subway station with shallow tunnel construction method [J]. Journal of Beijing University of Technology, 2010, 36(1):40-45.
[9] 李超. 浅埋暗挖隧道管棚作用机理及施工过程三维数值模拟[D]. 天津:天津大学, 2010.
LI Chao. Mechanism of Pipe-roof inShallow-Buried Tunnels and 3D Numerical Simulation of Construction Procession[D]. Tianjin: Tianjin University, 2010
[10]龙驭球. 弹性地基梁的计算[M]. 人民教育出版社,1981.he calculation of elastic foundation beam[M]. People’s Education Press, 1981.
[11]刘小兵. 双跨隧道穿越大型溶槽的弹性地基梁法[J]. 岩石力学与工程学报, 2004, 3(15):2557-2561.LIU Xiaobing. Method of elastic foundation beam for double span tunnel passing though big water-eroded groove[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 3(15):2557-2561.
[12]郑俊杰,章荣军,杨庆年. 浅埋隧道变基床系数下管棚的力学机制分析[J]. 岩土工程学报,2009,31(8):1165-1171.ZHENG Junjie,ZHANG Rongjun,YANG QingnianMechanical mechanism of piperoofs with variable coefficient of subgrade reaction in shallow tunnels[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(8):1165 -1171.
[13]蒋坤,夏才初,占伟明,等. 长管棚下箱涵顶进施工中管棚力学作用及其实例分析[J]. 土木工程学报,2010(2):105-109.JIANG Kun, XIA Caichu, ZHAN Weiming, et al. Case study and mechanics action analysis of pipe-roof during box-culvert being advanced under long pipe-roof [J]. China civil engineering journal, 2010(2):105- 109.
[14]苟德明,阳军生,张戈. 浅埋暗挖隧道管棚变形监测及受力机制分析[J]. 岩石力学与工程学报,2007,26(6):1258-1264.monitoring and mechanical behaviors of pipe-roof in shallow tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(6): 1258–1264.
[15]李健,谭忠盛,喻渝,等. 浅埋下穿高速公路黄土隧道管棚变形监测及受力机制分析[J]. 岩石力学与工程学报,2011(S1):3002- 3008.LI Jian,TAN Zhongsheng,YU Yu, et al. Analysis of deformation monitoring and mechanical behaviors of big pipe-roof for shallow-buried larger-span tunnel to underpass highway[J]. Chinese Journal of Rock Mechanics and Engineering, 2011(S1):3002- 3008.
[16]乔东. 浅埋隧道下穿高速初支变形控制施工技术[J]. 山西建筑,2013,39(3):152 -155.QIAO Dong. Preliminary support deformation control technology of shallow tunnel underpass highway[J]. Shan Xi archit- ecture, 2013, 39(3):152 -155.
[17]黄义,何芳社. 弹性地基上的梁板壳 [M]. 科学出版社,2005.
[18]徐干成,郑颖人,乔春生,等. 地下工程支护结构与设计[M]. 中国水利水电出版社,2013.
[19]蔡美峰. 岩石力学与工程[M]. 科学出版社,2002. rock mechanics and engineering[M]. Science Press,2002.
[20]王秀英. 黄土隧道预支护结构变形规律及受力特性研究报告[R]. 北京:北京交通大学,2015.