[1]刘遂庆,关小明,王永.“5·12”特大地震中供水管网损坏调查分析[A]//2010中日给水技术国际交流会论文集. 兰州: 中国土木工程学会水工业分会给水委员会, 2010.LIU Suiqing, ZHENG Xiaoming, WANG Yong. Investigation and analysis of water supply pipe network damage in the “May 12” earthquake [A]//2010 Proceedings of the International Conference on Water Supply Technology between China and Japan.Lanzhou: Water supply committee, water industry branch, Chinese Society of Civil Engineering, 2010.
[2]孙绍平.阪神地震中给水管道震害及其分析[J]. 特种结构,1997,14(2):51-55.
SUN Shaoping. Seismic damage of water supply pipeline and its analysis in Hanshin earthquake [J]. Special Structures,1997,14(2):51-55
[3]中华人民共和国国务院.水污染防治行动计划[EB/OL]. http://szy.wr.gov.cn/,2015,4-2.
The state council of the People’s Republic of China. Action plan for the prevention and control of water pollution[EB/OL]. http://szy.wr.gov.cn/,2015,4-2.
[4]GIUSTOLISI O, SAVIC D, KAPELAN Z. Pressure-driven demand and leakage simulation for water distribution networks[J]. Journal of Hydraulic Engineering,2008,134(5): 626-635.
[5]GAO J L, CHANG K, ZHANG M, et al. Research on leakage control of water distribution network based on pressure-driven demand model[C]. Tucson, Arizona, United States,2010,1103 -1109.
[6]LI B , LIU W, LI J. Leakage model of water distribution network[C]. Chengdu, 2013, 121-128.
[7]MOHAMMAD MM, KHOSRO H, KOUROSH B, et al. Leakage control in water distribution networks by using optimal pressure management: a case study[C].Tucson, Arizona, United States, 2012: 1110-1123.
[8]GUPTA R, NAIR AGR, ORMSBEE L. Leakage as pressure-driven demand in design of water distribution networks[J]. Journal of Water Resources Planning and Management,2016,142(6): 1-14.
[9]张宏伟,牛志广,陈超,等.供水管道漏损预测模型研究[J] .中国给水排水,2001,17(6):7-9.
ZHANG Hongwei, NIU Zhiguang, CHEN Chao, et al. Study on the prediction model for water supply net leakage [J]. China Water & Wastewater, 2001,17(6):7-9.
[10]URI S, CHARLES D D H. An analytic approach to scheduling pipe replacement[J]. American Water Works Association,1979 , 71 ( 5 ) : 248-258.
[11]傅玉芬.城市供水管网漏损控制[D].天津:天津大学,2004.6.
FU Yufen. Leakage control of urban water supply network [D]. Tianjin:Tianjin University,2004.6.
[12]赵洪宾,陈兵,伍悦滨.给水管网漏失预测模型的研究[J].给水排水,2001, 27 (10 ): 94-96.
ZHAO Hongbin, CHEN Bing, WU Yuebin. Research on leakage prediction model of water supply network [J]. Water & Wastewater Engineering, 2001, 27 (10): 94-96.
[13]闫丽芳. 给水管网漏损分析及预测[D].合肥工业大学,2009.
YANG Lifang. Analysis and forecast of leakage in water distribution systems[D].Hefei university of technology,2009.
[14]韩阳,王威.给水管网实时故障诊断的支持向量机模型[J].给水排水,2007,33(2):109-112.
HAN Yang, WANG Wei. SVM based model for realtime diagnostic of water distribution network [J]. Water & Wastewater Engineering, 2007,33(2):109-112.
[15]张明,李鹏,周润娟.基于集对分析的供水管网漏损预测模型[J].供水技术.2012,6(3):28-31.
ZHANG Ming, LI Peng, ZHOU Runjuan. Leakage forecast model of water supply network based on set pair analysis [J].Water Technology.2012,6(3): 28-31.
[16]林韵梅. 岩石分级的理论与实践[M]. 北京: 冶金工业出版社, 1996: 69-86.
LIN Yunmei. Theory and practice of rock classification [M]. Beijing: Metallurgical Industry Press, 1996:69-86.
[17]胥旋,钟茂华, 史聪灵,等. 基于动态分级法的地铁设备设施风险评价研究[J]. 中国安全科学学报, 2013, 23(7):61-66.
XU Xuan, ZHONG Maohua, SHI Congling, et al. Risk assessment of equipment and facilities in metro based on dynamic classification method [J]. Chinese journal of safety science, 2013, 23(7):61-66.
[18]江海潮.管材之间的接口形式探讨[J].安徽建筑,2003,10(1):49-49.
JIANG Haichao. Discussion on the interface form between pipes [J]. Anhui architecture, 2003,10(1):49-49.
[19]郎鹏凯.基于GIS系统的城市供水管网漏损评价方法研究[D].太原:太原理工大学,2010.
LANG Pengkai. Study on urban water supply pipe network leakage evaluation based on gis technology[D]. Taiyuan:Taiyuan University of Technology,2010.
[20]马力辉,崔建国,刘遂庆,等.系统聚类分析用于供水管道漏损控制的研究[J].中国给水排水,2006(23):9-13.
MA Lihui, CUI Jianguo, LIU Suiqing, et al. Study on application of system clustering analysis in leakage control of water supply pipelines [J]. China Water & Wastewater,2006(23):9-13.