[1]宋战平,王凯蒙,王涛,等.浅埋地铁隧道下穿高速公路施工方法比选[J].西安建筑科技大学学报(自然科学版),2019,51(04):503-510,596.[doi:10.15986/j.1006-7930.2019.04.006]
 SONG Zhanping,WANG Kaimeng,WANG Tao,et al.Analysis of construction method of shallow metro tunnel under the crossing highway[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(04):503-510,596.[doi:10.15986/j.1006-7930.2019.04.006]
点击复制

浅埋地铁隧道下穿高速公路施工方法比选()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
51
期数:
2019年04期
页码:
503-510,596
栏目:
出版日期:
2019-08-30

文章信息/Info

Title:
Analysis of construction method of shallow metro tunnel under the crossing highway
文章编号:
1006-7930(2019)04-0503-08
作者:
宋战平12王凯蒙12王涛13王军保12唐坤尧3
(1. 西安建筑科技大学 土木工程学院,陕西 西安 710055 ;2. 西安建筑科技大学,陕西省岩土与地下空间工程重点实验室,陕西 西安 710055 ;3. 中国铁建大桥工程局集团有限公司,天津 300300)
Author(s):
SONG Zhanping12 WANG Kaimeng12 WANG Tao13 WANG Junbao12 TANG Kunyao3
(1. School of Civil Engineering, Xian Univ. of Arch. & Tech., Xi an 710055, China; 2. Shaanxi key Labratory of Geotechnical and Underground Space Engineering, Xi an Univ. of Arch. & Tech., Xi an 710055, China; 3. China Railway Construction Bridge Engineering Bureau Group Co., Ltd, Tianjin 300300, China)
关键词:
浅埋隧道施工方法数值模拟隧道开挖路面沉降
Keywords:
shallow tunnel construction method numerical simulation tunnel excavation land settlement
分类号:
TU 45
DOI:
10.15986/j.1006-7930.2019.04.006
文献标志码:
A
摘要:
以贵阳地铁1号线下麦西隧道YD1K1+395~+505段下穿既有环城高速公路及高速公路交通涵洞施工为工程背景,采用Midas GTS/NX软件对该段浅埋隧道下穿高速公路及高速公路涵洞施工方案进行优化研究,分析了台阶法、CD法、CRD法和双侧壁导坑法四种施工开挖工法施工时隧道围岩的变形及运营高速公路路面的沉降变形特性;对比研究了不同施工方案引起的围岩塑性区及支护结构受力特性的变化.基于数值模拟分析的研究结果表明,下麦西隧道近距离穿越既有运营高速公路施工时,选用CRD法开挖对路面及隧道拱顶的沉降均可起到很好的控制作用,隧道支护结构的受力特性良好,施工中既有高速公路及隧道本身的稳定性良好.基于数值模拟分析确定了经济、合理的施工开挖方案及施工参数,跟踪施工进行的现场监测及与数值分析结果的对比分析表明了推荐方案的合理、可行性.贵阳地铁1号线下麦西隧道下穿既有运营高速公路及公路涵洞的工程实例为同类工程的建设提供了有意义的参考和借鉴
Abstract:
YD1K1+395~+505 mileage of the Xiamaixi tunnel of Guiyang urban rail transit No.1 line under the existing highway and traffic culvert is taken for study. The Midas GTS/NX software was used to simulate the deformation of the surrounding rock and the settlement of the highway pavement during the construction of the tunnel under the highway. At the same time, the changes of the mechanical properties of the surrounding rock plastic zone and supporting structure caused by different construction methods were compared. The four types of excavation methods including the bench cut method, CD method, CRD method and double side drift method are analyzed. Results show that CRD method has good control effect on the settlement of the road surface and tunnel, and the mechanical properties of the tunnel support structure are good. In the construction, the stability of the highway and the tunnel itself is good. Based on numerical simulation analysis, the economical and reasonable construction excavation plan and construction parameters were determined. The onsite monitoring of the follow-up construction and the comparison analysis with the numerical analysis results showed that the recommended plan was reasonable and feasible. The project example of the Xiamaixi tunnel of Guiyang urban rail transit No.1 line under the existing highway and traffic culvert for the construction of similar projects provide a meaningful reference.

参考文献/References:

[1]袁驰宇. 下穿复杂条件超浅埋暗挖隧道施工技术研究[D]. 西安: 西安建筑科技大学, 2015.

YUAN Chiyu. A study on construction technology in undercrossing ultra-shallow buried tunnel under complex conditions [D]. Xi′an: Xi′an Univ. of Arch. & Tech., 2015.

[2]张著. 下穿隧道施工对山区高速公路路基稳定性影响的研究[D]. 重庆: 重庆大学, 2014.

ZHANG Zhu, Research on the stability of mountain areas highway road bed impacted by the construction of undercrossing tunnel[D]. Chongqing: Chongqing University, 2014.

[3]刘松涛, 张国安, 杨秀竹, 等. 上软下硬地层铁路隧道下穿既有高速公路施工方法研究[J]. 铁道科学与工程学报, 2011, 8(5): 35-39.

LIU Songtao, ZHANG Guoan, YANG Xiuzhu, et al. Study on the construction method of railway tunnel crossing under expressway and built in upper soft and lower hard stratum[J]. Journal of Railway Science and Engineering, 2011, 8(5): 35-39.

[4]施成华, 彭立敏, 刘宝琛. 浅埋隧道开挖对地表建筑物的影响[J]. 岩石力学与工程学报, 2004, 23(19): 3310-3316.

SHI Chenghua, PENG Chenghua, LIU Baochen. Influence of shallow tunnel excavation on ground surface buildings[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(19): 3310-3316.

[5]晏莉, 阳军生, 刘宝琛. 浅埋双孔平行隧道开挖围岩应力和位移分析[J]. 岩土工程学报, 2011, 33(3): 413-419.

YAN Li, YANG Junsheng, LIU Baochen. Stress and displacement of surrounding rock with shallow twin-parallel tunnels[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(3): 413-419.

[6]韩凯航, 张成平, 王梦恕. 浅埋隧道围岩应力及位移的显式解析解[J]. 岩土工程学报, 2014, 36(12): 2253-2259.

HAN Kaihang, ZHANG Chengping, WANG Mengshu. Explicit analytical solutions for stress and displacement of surrounding rock in shallow tunnels[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(12): 2253-2259.

[7]赵纪平. 超浅埋隧道下穿高速公路、国道施工技术研究[J]. 隧道建设, 2009, 29(4): 441-445, 465.

ZHAO Jiping. Construction technology for super-shallow-buried tunnels passing underneath expressways and national highways [J]. Tunnel Constrution, 2009, 29(4): 441-445, 465.

[8]王志, 杜守继, 张文波, 等. 浅埋铁路隧道下穿高速公路施工沉降分析[J]. 地下空间与工程学报, 2009, 5(3): 531-535,572.

WANG Zhi, DU Shouji, ZHANG Wenbo, et al. Analysis of construction settlement of shallow railway tunnel under crossing the highway[J]. Chinese Journal of Underground Space and Engineering, 2009, 5(3): 531-535+572.

[9]姜波. 浅埋暗挖法地铁施工对周围建筑物影响规律[J]. 辽宁工程技术大学学报(自然科学版), 2016, 35(5): 484-487.

JIANG Bo. Surrounding buildings influence law under the condition of subway construction used by shallow tunnel [J]. Journal of Liaoning Technical University (Natural Science Edition), 2016, 35(05): 484-487.

[10]陈建平, 吴立. 地下建筑工程设计与施工[M]. 武汉: 中国地质大学出版社, 2000.

CHEN Jianping, WU Li. Underground engineering design and construction[M]. Wuhan: China University of Geosciences Press, 2000.

[11]袁竹, 陈勇, 王柱.山区单线铁路隧道下穿高速公路影响分区研究[J]. 隧道建设, 2016, 36(2): 164-169.

YUAN Zhu, CHEN Yong, WANG Zhu. Study on influence zoning of single-track railway tunnel under-passing expressway tunnel at mountainous areas[J]. Tunnel Construction, 2016, 36(2): 164-169.

[12]雷位冰. 温福铁路琯头岭隧道下穿公路隧道施工技术[J]. 地下空间与工程学报, 2007, 3(4):758-764.

LEI Weibing. Construction technology for Wenfu railway guantouling tunnel under crossing the highway tunnel [J]. Chinese Journal of Underground Space and Engineering, 2007, 3(4): 758-764.

[13]陈彬科, 陈林杰, 吴建辉, 等. 新建地铁下穿既有轨道车站施工方案研究[J]. 中外公路, 2018, 38(6): 186-189.

CHEN Binke, CHEN Linjie, WU Jianhui, et al. Study on construction schemes of new metro down-passing existing metro station[J]. Journal of China & Foreign Highway, 2018, 38(6): 186-189.

[14]李春清, 梁庆国, 吴旭阳, 等. 复合式衬砌初期支护刚度及影响因素分析[J]. 隧道建设, 2014, 34(8): 754-759.

LI Chunqing, LIANG Qingguo, WU Xuyang, et al. Analysis on rigidity of primary support of composite lining and its influencing factors[J]. Tunnel Construction, 2014, 34(8): 754-759.

[15]晏勤, 李树忱, 谢璨, 等. 锚杆加固作用下圆形隧道复合岩体围岩特征曲线解析方法研究[J]. 岩石力学与工程学报, 2017, 36(12): 3021-3027.

相似文献/References:

[1]李 辉,等.基于谢家杰公式的浅埋隧道开挖进尺计算方法研究[J].西安建筑科技大学学报(自然科学版),2018,50(05):662.
 LI hui,TIAN xiaoxu,et al.Study on calculation method of digging length for shallow tunnel based on Xie Jiajies surrounding Rock pressure Formula[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2018,50(04):662.

备注/Memo

备注/Memo:
收稿日期:2018-08-06
修改稿日期:2019-06-10
基金项目:国家自然科学基金项目(51578447);住房和城乡建设部科学技术计划项目(2017-k4-032)
第一作者:宋战平(1974-),男,博士生导师,主要研究岩土工程设计理论.E-mail: songzhpyt@xauat.edu.cn