参考文献/References:
[1] 丁小军,王佐.法中公路设计标准、规范的差异比较[J].公路,2008(9):7-14.DING Xiaojun,WANG Zuo. Comparison of differences in design standards and specifications between French and Chinese highways[J].Highway, 2008(9): 7-14.
[2] 郭喜,王弘一.中法公路施工部分规范的区别简析[J].工程技术,2016(16):63-66.GUO Xi, WANG Hongyi. A brief analysis of the differences between Chinese and French highway construction specifications[J]. Engineering Technology, 2016(16): 63-66.
[3] 张青宇. 中、法岩土规范岩土体分类对比分析[J].水电站设计,2016,32(3):65-69.ZHANG Qingyu. Comparative analysis of classification of rock and soil in Chinese and French rocks[J]. Design of Hydropower Station, 2016, 32(3): 65-69.
[4] 江涛. 阿尔及利亚贝贾亚高速公路可压缩土的地基处理设计[J].中外公路,2017,3(1):10-14.JIANG Tao.Foundation treatment design of compressible soil for Algeria’s Bejaia highway [J]. Journal of China & Foreign Highway, 2017, 3(1): 10-14.
[5] 齐元新. 中国与法国规范下土方填料分类及使用条件对比[J].铁道建筑技术,2013(3):39-43.QI Yuanxin. Comparison of classification and use conditions of earthwork fillers under Chinese and French regulations[J]. Railway Construction Technology, 2013(3): 39-43.
[6] JIA Z, TANG S, LUO W, et al. Estimation of design floods in ungauged catchments using a regional index flood method[J]. Journal of Environmental Management, 2014, 67: 4-11.
[7] 刘毅,何山清.阿尔及利亚东西高速公路桥涵水文设计方法及其应用[J].交通科技,2009(6):33-35.LIU Yi, HE Shanqing. Hydrological design method of bridge and culvert of the east-west expressway in Algeria and its application[J]. Traffic Technology, 2009(6): 33-35.
[8] HU Yiming, LIANG Zhongmin, LIU Xinsheng, et al. Uncertainty assessment of estimation of hydrological design values[J]. Springer Journal, 2015, 29:501-511.
[9] 华鹏年,雷伟,刘新生.小流域公路桥涵设计流量计算方法研究[J].公路,2014(4):4-7.HUA Pengnian, LEI Wei, LIU Xinsheng. Study on calculation method of design flow of bridge and culvert in small watershed[J].Highway, 2014(4): 4-7.
[10]李长秋,隋秀良,陈长俊. 绥建公路24 km涵洞水文计算及涵洞施工体会[J].黑龙江交通科技,2001(1):48-50.LI Changqiu, SUI Xiuliang, CHEN Changjun. Hydrological calculation and culvert construction experience of 24 km culvert in Suijian Highway[J], Heilongjiang Transportation Technology, 2001(1): 48-50.
[11]杨磊磊.阿尔及利亚东西高速公路涵洞水文水力及洞口防冲刷计算[J].四川建材,2014,40(1):137-140.YANG Leilei.Hydrological hydraulics and anti-scour calculation of culverts in the east-west expressway of Algeria[J]. Sichuan Building Materials, 2014, 40(1): 137-140.
[12]French Highway and highway Technology Institute. System facilities of highway drainage[S].French Repubic: Ministry of Transport, Housing, Tourism and Marine Equipment,2006.
[13]French Highway and Highway Technology Institute. Road drainage guide[S].Répulique francaise: Ministére desframsports, dulogememer, du fourisme et deséquipements maritimes,2006.
[14]河北省交通规划设计院. 公路涵洞设计细则: JTG/T D65-04-2007[S]. 北京:人民交通出版社,2007.Heibei Provincial Communications Planning and Design Institute. Guidelines for design highway culvert: JTG/T D65-04-2007:[S]. Beijing: China Communications Publishing, 2007.
[15]张江峰,李隆.西非某国公路升级改造桥涵水文水力设计实践[J].山西建筑,2013,39(20):170-171.ZHANG Jiangfeng, LI Long. Hydrological and hydraulic design practice of upgrading and reconstructing bridges and culverts in a highway in West Africa[J]. Shanxi Architecture,2013, 39(20): 170-171.
[16]中交路桥技术有限公司. 公路排水设计规范,JTG/T D33-2012:[S].北京:人民交通出版社,2012.Zhongjiao Road and Bridge Technology Co.,Ltd. Specifications for drainage design of highway, JTG/T D33-2012:[S]. Beijing: China Communications Publishing, 2012.
[17]美国联邦高速公路局运输处.河流桥梁水力工程[M].西安:中交第一公路勘察设计院有限公司,2006.US Federal Highways Transporation Office.River bridge hydraulic engineering[M]. Xi’an: CCCC First Highway Consultants Co.,LTD, 2006.