[1]张成良,张金瑞,曹孟潇,等.不同侧覆土厚度条件下连拱隧道的偏压特性研究[J].西安建筑科技大学学报(自然科学版),2019,51(06):839-845.[doi:10.15986/j.1006-7930.2019.06.010]
 ZHANG Chengliang,ZHANG Jinrui,CAO Mengxiao,et al.Study on bias characteristics of multi arch tunnel under different side overburden thickness[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(06):839-845.[doi:10.15986/j.1006-7930.2019.06.010]
点击复制

不同侧覆土厚度条件下连拱隧道的偏压特性研究()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
51
期数:
2019年06期
页码:
839-845
栏目:
出版日期:
2019-12-31

文章信息/Info

Title:
Study on bias characteristics of multi arch tunnel under different side overburden thickness
文章编号:
1006-7930(2019)06-0839-07
作者:
张成良张金瑞曹孟潇王超
(昆明理工大学 国土资源工程学院,云南 昆明 650093)
Author(s):
ZHANG ChengliangZHANG JinruiCAO Mengxiao WANG Chao
(Faculty of Land Resources Engineering, Kunming University of Science and Technology, Kunming 650093, China)
关键词:
连拱隧道浅埋偏压侧覆土厚度偏压特性
Keywords:
multi arch tunnel shallow buried bias side overburden thickness bias characteristic
分类号:
TU4
DOI:
10.15986/j.1006-7930.2019.06.010
文献标志码:
A
摘要:
起凤山隧道进、出口浅埋偏压严重,上覆土层较薄,稳定性差,开挖扰动后上部土层易发生滑动.后行洞开挖时常会出现围岩变形过大、坍塌、失稳等安全事故.本文结合现场连拱隧道的地质条件和围岩的力学特点,采用理论分析和数值模拟方法对开挖后连拱隧道埋深、侧覆土层厚度与围岩应力和位移的变形规律展开研究,研究结果表明:隧道在竖向方向受到的偏压应力随着埋深的增加而减小,埋深越浅其偏压作用越明显,当埋深超过20 m后偏压作用的偏压应力增加量逐渐减小.对不同侧覆土层厚度的隧道开挖引起的岩体竖向变形特性进行分析,结果表明:竖向位移随侧覆土层厚度的增加逐步减小,当侧覆土厚度超过21 m时,竖向位移受侧覆土厚度的影响较小,基本只受围岩本身岩土性质的影响.
Abstract:
The Qi Feng tunnel entrance and exit shallow buried bias is serious, the overlying soil layer is thin, and the stability is poor. After the excavation disturbance, the upper soil layer tends to slide. The excavation of back holes often causes large deformation, collapse and instability of surrounding rock. In this paper, combined with the geological conditions of the multi arch tunnel and the mechanical characteristics of surrounding rock, the theoretical analysis and numerical simulation are used to study the deformation law of the buried depth, side cover soil thickness and the stress and displacement of the surrounding rock after excavation. The results show that the bias stress of the tunnel under the vertical direction increases with the depth of the buried tunnel. The bias stress of the tunnel in the vertical direction decreases with the increase of the buried depth. The more shallow the buried depth is, the more obvious the bias effect is, when the depth of burial exceeds 20m, the increased amount of bias stress is gradually reduced after the bias is applied. The vertical deformation characteristics of the rock mass caused by tunnel excavation with different thickness of the tunnel are analyzed. The vertical displacement is gradually reduced with the increase of the thickness of the side covering layer. When the thickness of the overlying soil is more than 21m, the vertical displacement is less affected by the thickness of the side cladding soil, basically only by the surrounding rock itself.

参考文献/References:

[1]李奎.水平层状隧道围岩压力拱理论研究[D].成都:西南交通大学,2010.

LI Kui. Theoretical study on pressure arch of surrounding rock in horizontal layered tunnel [D]. Chengdu: Southwest Jiaotong University, 2010.
[2]张敏. 复杂地质条件下大断面隧道“零”进洞工法技术体系及应用研究[D].成都:成都理工大学,2009.
ZHANG Min.Technical system and application of zero entry method for large cross section tunnel under complex geological conditions [D]. Chengdu: Chengdu University of Technology, 2009.
[3]LI Changdong, WANG Xiaoyi,TANG Huiming,et al. A preliminary study on the location of the stabilizing piles for colluvial landslides with interbedding hard and soft bedrocks[J]. Engineering Geology,2017,224
[4]汪宏,蒋超. 浅埋偏压隧道洞口坍方数值分析与处治[J]. 岩土力学,2009(11):3481-3485.
WANG Hong, JIANG Chao. Numerical analysis and treatment of collapse of shallow buried bias tunnel portal[J]. Rock and Soil Mechanics, 2009(11): 3481-3485.
[5]冯秀国. 采用地表注浆方法使隧道穿越坍塌区[J]. 铁道建筑, 1998(2):28-30.
FENG Xiuguo. Using surface grouting method to make tunnels pass through collapsed area [J].Railway Building, 1998 (2): 28-30.
[6]李锦平, 黄武来. 浅埋隧道通顶坍塌整治与思考[J]. 中国铁路, 1996(7):49-51.
LI Jinping, HUANG Wulai. Renovation and consideration of roof collapse in shallow tunnels[J]. China Railway, 1996 (7): 49-51.
[7]DAY M J. Karstic problems in the construction of Milwaukee’s deep tunnels[J]. Environmental Geology, 2004, 45(6):859-863.
[8]刘小军, 张永兴. 浅埋偏压隧道洞口段合理开挖工序及受力特征分析[J]. 岩石力学与工程学报, 2011(S1):3066-3073.
LIU Xiaojun, ZHANG Yongxing. Reasonable excavation procedure and stress characteristics of shallow buried bias tunnel portal section [J]. Chinese Journal of Rock Mechanics and Engineering, 2011 (S1): 3066-3073.
[9]SCHUMACHER Forrest P,EUNHYE Kim. Modeling the pipe umbrella roof support system in a Western US underground coal mine[J].International Journal of Rock Mechanics and Mining Sciences,2013,60:114-224.
[10]段海澎, 徐干成, 刘保国. 富溪偏压连拱隧道围岩与支护结构变形和受力特征分析[J]. 岩石力学与工程学报, 2006, 25(S2):3763-3768.
DUAN Haipeng,XU Gancheng,LIU Baoguo. Analysis of deformation and stress characteristics of surrounding rock and supporting structure of Fuxi multi arch tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2006, 25(S2):3763-3768.
[11]LIU W, LIU B, WANG W. Pipe shield effect analysis of double-arched tunnel under unsymmetrical pressures[J]. Chinese Journal of Rock Mechanics & Engineering, 2007, 26:3704-3710.
[12]赵乐之, 刘晓峰, 乔宁. 偏压隧道设计的数值分析[J]. 建筑结构, 2010(S1):409-411.
ZHAO Lezhi, LIU Xiaofeng,QIAO Ning. Numerical analysis of the design of bias tunnel [J]. Journal of Architectural Structure, 2010 (S1): 409-411.
[13]熊良宵, 李天斌, 刘勇. 隧道地震响应数值模拟研究[J]. 地质力学学报, 2007, 13(3):255-260.
XIONG Liangxiao, LI Tianbin,LIU Yong. Numerical simulation of tunnel seismic response [J]. Chinese Journal of Geomechanics, 2007, 13 (3): 255-260.
[14]江学良, 陈江, 杨慧,等. 基于大型振动台试验的偏压隧道地震响应特性研究[J]. 自然灾害学报, 2016, 25(5):158-166.
JIANG Xueliang, CHEN Jiang, YANG Hui, et al. Study on seismic response characteristics of bias tunnel based on large-scale shaking table test [J]. Journal of Natural Disasters, 2016, 25 (5): 158-166.
[15]KAMATA Mashimo. Centrifuge model test of tunnel face reinforcement by bolting [J].Tunnelling and Underground Space Technology,2003,18(2/3):205-212.

相似文献/References:

[1]李辉,杜莎芳,李恒,等.奔龙坪偏压连拱隧道施工方案比选及监测分析[J].西安建筑科技大学学报(自然科学版),2017,49(04):485.[doi:10.15986/j.1006-7930.2017.04.004]
 LI HuiDU ShafangLI HengSONG ZhanpingSHI Botai.Construction sequence comparison and numerical analysis of Benlongping shallow and unsymmetrical pressure multi arch tunnel[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2017,49(06):485.[doi:10.15986/j.1006-7930.2017.04.004]

备注/Memo

备注/Memo:
收稿日期:2018-09-10修改稿日期:2019-11-19
基金项目:国家自然科学基金项目(51774020)
第一作者:张成良(1978-),男,博士,副教授,主要从事岩土工程、爆破工程方面研究.E-mail:694095317@qq.comDOI:
更新日期/Last Update: 2020-01-21