[1]罗福周,王冠楠.综合管廊PPP项目使用者付费与财政补贴联动调整研究[J].西安建筑科技大学学报(自然科学版),2019,51(06):917-924.[doi:10.15986/j.1006-7930.2019.06.021]
 LUO Fuzhou,WANG Guannan.Research on the linkage adjustment of user payment and financial subsidies for PPP project of utility tunnel[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(06):917-924.[doi:10.15986/j.1006-7930.2019.06.021]
点击复制

综合管廊PPP项目使用者付费与财政补贴联动调整研究()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
51
期数:
2019年06期
页码:
917-924
栏目:
出版日期:
2019-12-31

文章信息/Info

Title:
Research on the linkage adjustment of user payment and financial subsidies for PPP project of utility tunnel
文章编号:
1006-7930(2019)06-0917-08
作者:
罗福周王冠楠
(西安建筑科技大学 管理学院,陕西 西安 710055)
Author(s):
LUO FuzhouWANG Guannan
(School of Management,Xi′an Univ. of Arch. & Tech.,Xi′an 710055, China)
关键词:
财政补贴使用者付费特许经营期系统动力学联动调整
Keywords:
financial subsidy user payment franchise period system dynamics linkage adjustment
分类号:
TU9903,F283
DOI:
10.15986/j.1006-7930.2019.06.021
文献标志码:
A
摘要:
地下综合管廊在城市建设中的重要性随着新型城镇化的发展日益提升,其投资建设运营模式现多采用政府与社会资本合作的PPP模式. 由于在PPP模式中需要对项目的特许期、使用者付费以及政府方的财政补贴等进行决策,为了解决实际项目特许协议中上述因素的决策以及调整过程中缺少依据的问题,本文综合考虑项目中各参与方的利益构建多目标规划与评价模型,并运用系统动力学的方法模拟项目的收益净现值并分析项目的财政补贴、使用者付费、特许期之间的联动调整关系,为综合管廊项目补贴、定价以及合理利润率和特许期的调整决策提供建议与参考.
Abstract:
With the development of new urbanization, the importance of underground comprehensive pipeline corridor in urban construction is increasing day by day. The PPP mode of government and social capital cooperation is mostly used in its investment and construction operation mode. In order to solve the problem of lack of basis in the decisionmaking and adjustment process of the above factors in the actual project concession agreement, this paper synthetically considers the interests of all participants in the project, constructs a multi-objective planning and evaluation model, and uses the method of system dynamics to simulate the project. Aim To analyze the net present value of income and the linkage adjustment relationship among financial subsidy, user payment and concession period, so as to provide suggestions and references for the adjustment decision-making of comprehensive Corridor project subsidy, pricing, reasonable profit rate and concession period.

参考文献/References:

[1]冯珂,王守清,伍迪,等. 基于案例的中国PPP项目特许权协议动态调节措施的研究[J].工程管理学报, 2015(3):88-93.

FENG Ke,WANG Shouqing,WU Di, et al. Casebased study on dynamic adjustment measures of China`s PPP project concession agreement [J]. Journal of Engineering Management, 2015 (3): 88-93.
[2]宋金波,宋丹荣,富怡雯,等. 基于风险分担的基础设施BOT项目特许期调整模型[J].系统工程理论与实践, 2012, 32(6):1270-1277.
SONG Jinbo, SONG Danrong, FU Yiwen, et al. Concession period adjustment model of infrastructure BOT project based on risk sharing [J]. Systems Engineering Theory and Practice, 2012, 32 (6): 1270-1277.
[3]高华,孙赵航天,程风华. 污水处理PPP项目价格形成与动态调整机制研究[J].价格理论与实践,2016(11):130-133.
GAO Hua, SUN Zhaoxing, CHENG Fenghua.Study on price formation and dynamic adjustment mechanism of PPP project for sewage treatment [J]. Price Theory and Practice, 2016 (11): 130-133.
[4]张璞,王丽萍,兰丹,等.污水处理PPP项目定价机制研究[J].价格理论与实践, 2017(2):153-156.
ZHANG Pu, WANG Liping, LAN Dan, et al. Study on pricing mechanism of sewage treatment PPP project [J]. Price Theory and Practice, 2017 (2): 153-156.
[5]吕俊娜,刘伟,邹庆,等.轨道交通SBOT项目特许期的合作博弈模型研究[J].管理工程学报, 2016, 30(3):209-215.
Lü Junna, LIU Wei, ZOU Qing, et al. Research on cooperative game model of concession period for SBOT project of rail transit [J]. Journal of Management Engineering, 2016, 30 (3): 209-215.
[6]宋金波,靳璐璐,付亚楠. 高需求状态下交通BOT项目特许决策模型[J].管理评论,2016,28(5):199-205.
SONG Jinbo, JIN Lulu, FU Yanan. Decisionmaking model of BOT project concession under high demand [J]. Management Review,2016,28(5):199-205.
[7]谭志加,杨海,陈琼.收费公路项目Pareto有效BOT合同与政府补贴[J].管理科学学报,2013,16(3):10-20.
TAN Zhijia, YANG Hai, CHEN Qiong. Pareto effective BOT contract and government subsidy for toll highway project [J]. Journal of Management Science, 2013, 16 (3): 10-20.
[8]HANAOKA S,PALAPUS H PReasonable concession period for buildoperatetransfer road projects in the Philippines[J]. International Journal of Project Management, 2012, 30(8):938-949.
[9]CARBONARA N, COSTANTINO N, PELLEGRINO R. Concession period for PPPs: a winwin model for a fair risk sharing[J]. International Journal of Project Management, 2014, 32(7):1223-1232.
[10]王卓甫,侯,丁继勇.公益性PPP项目特许期与政府补贴机制设计[J].科技管理研究, 2017, 37(18):194-201.
WANG Zhuofu, HOU Manman, DING Jiyong.Concession period of public welfare PPP project and design of government subsidy mechanism [J]. Science and Technology Management Research, 2017, 37 (18): 194-201.
[11]曹启龙,盛昭瀚,周晶. 激励视角下PPP项目补贴方式研究[J]. 科技管理研究,2016, 36(14):228-233.
CAO Qilong, SHENG Zhaohan, ZHOU Jing. Research on PPP project subsidies from the perspective of incentive [J]. Science and Technology Management Research, 2016, 36 (14): 228-233.
[12]韦海民,刘武岩. PPP模式下地下综合管廊入廊定价激励机制研究[J].地下空间与工程学报,2018,14(3):585-594.
WEI Haimin, LIU Wuyan. Study on incentive mechanism of gallery pricing for underground comprehensive pipeline corridor under PPP mode [J].Journal of Underground Space and Engineering, 2018,14(3): 585-594.
[13]王淑英,晋雅芳. 城市地下综合管廊PPP项目收益研究:基于系统动力学方法的分析[J].价格理论与实践,2017(5):143-146.
WANG Shuying, JIN Yafang. Research on PPP project income of urban underground integrated pipeline gallery: analysis based on system dynamics method [J]. Price Theory and Practice, 2017 (5): 143-146.
[14]WANG Fan, XIONG Minghua, NIU Baozhang, et al. Impact of government subsidy on BOT contract design: Price, demand, and concession period[J]. Transportation Research (Part B): Methodological, 2018, 110:137-159.

相似文献/References:

[1]罗 西,刘加平.居住建筑分布式光伏发电系统经济性分析[J].西安建筑科技大学学报(自然科学版),2015,47(03):437.[doi:10.15986/j.1006-7930.2015.03.024]
 LUO Xi,LIU Jiaping.Economic analysis of residential distributed PV project[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2015,47(06):437.[doi:10.15986/j.1006-7930.2015.03.024]

备注/Memo

备注/Memo:
收稿日期:2018-11-24修改稿日期:2019-09-20
基金项目:国家自然科学基金项目(71974155)
第一作者:罗福周(1963-),男,硕士,教授,主要研究方向为工程经济与管理. E-mail:Luofz@163.com
通信作者:王冠楠(1993-),男,硕士生,主要研究方向为工程经济与管理Email:wgn19930620@163.com
更新日期/Last Update: 2020-01-22