[1]冯珂,王守清,伍迪,等. 基于案例的中国PPP项目特许权协议动态调节措施的研究[J].工程管理学报, 2015(3):88-93.FENG Ke,WANG Shouqing,WU Di, et al. Casebased study on dynamic adjustment measures of China`s PPP project concession agreement [J]. Journal of Engineering Management, 2015 (3): 88-93.
[2]宋金波,宋丹荣,富怡雯,等. 基于风险分担的基础设施BOT项目特许期调整模型[J].系统工程理论与实践, 2012, 32(6):1270-1277.
SONG Jinbo, SONG Danrong, FU Yiwen, et al. Concession period adjustment model of infrastructure BOT project based on risk sharing [J]. Systems Engineering Theory and Practice, 2012, 32 (6): 1270-1277.
[3]高华,孙赵航天,程风华. 污水处理PPP项目价格形成与动态调整机制研究[J].价格理论与实践,2016(11):130-133.
GAO Hua, SUN Zhaoxing, CHENG Fenghua.Study on price formation and dynamic adjustment mechanism of PPP project for sewage treatment [J]. Price Theory and Practice, 2016 (11): 130-133.
[4]张璞,王丽萍,兰丹,等.污水处理PPP项目定价机制研究[J].价格理论与实践, 2017(2):153-156.
ZHANG Pu, WANG Liping, LAN Dan, et al. Study on pricing mechanism of sewage treatment PPP project [J]. Price Theory and Practice, 2017 (2): 153-156.
[5]吕俊娜,刘伟,邹庆,等.轨道交通SBOT项目特许期的合作博弈模型研究[J].管理工程学报, 2016, 30(3):209-215.
Lü Junna, LIU Wei, ZOU Qing, et al. Research on cooperative game model of concession period for SBOT project of rail transit [J]. Journal of Management Engineering, 2016, 30 (3): 209-215.
[6]宋金波,靳璐璐,付亚楠. 高需求状态下交通BOT项目特许决策模型[J].管理评论,2016,28(5):199-205.
SONG Jinbo, JIN Lulu, FU Yanan. Decisionmaking model of BOT project concession under high demand [J]. Management Review,2016,28(5):199-205.
[7]谭志加,杨海,陈琼.收费公路项目Pareto有效BOT合同与政府补贴[J].管理科学学报,2013,16(3):10-20.
TAN Zhijia, YANG Hai, CHEN Qiong. Pareto effective BOT contract and government subsidy for toll highway project [J]. Journal of Management Science, 2013, 16 (3): 10-20.
[8]HANAOKA S,PALAPUS H PReasonable concession period for buildoperatetransfer road projects in the Philippines[J]. International Journal of Project Management, 2012, 30(8):938-949.
[9]CARBONARA N, COSTANTINO N, PELLEGRINO R. Concession period for PPPs: a winwin model for a fair risk sharing[J]. International Journal of Project Management, 2014, 32(7):1223-1232.
[10]王卓甫,侯,丁继勇.公益性PPP项目特许期与政府补贴机制设计[J].科技管理研究, 2017, 37(18):194-201.
WANG Zhuofu, HOU Manman, DING Jiyong.Concession period of public welfare PPP project and design of government subsidy mechanism [J]. Science and Technology Management Research, 2017, 37 (18): 194-201.
[11]曹启龙,盛昭瀚,周晶. 激励视角下PPP项目补贴方式研究[J]. 科技管理研究,2016, 36(14):228-233.
CAO Qilong, SHENG Zhaohan, ZHOU Jing. Research on PPP project subsidies from the perspective of incentive [J]. Science and Technology Management Research, 2016, 36 (14): 228-233.
[12]韦海民,刘武岩. PPP模式下地下综合管廊入廊定价激励机制研究[J].地下空间与工程学报,2018,14(3):585-594.
WEI Haimin, LIU Wuyan. Study on incentive mechanism of gallery pricing for underground comprehensive pipeline corridor under PPP mode [J].Journal of Underground Space and Engineering, 2018,14(3): 585-594.
[13]王淑英,晋雅芳. 城市地下综合管廊PPP项目收益研究:基于系统动力学方法的分析[J].价格理论与实践,2017(5):143-146.
WANG Shuying, JIN Yafang. Research on PPP project income of urban underground integrated pipeline gallery: analysis based on system dynamics method [J]. Price Theory and Practice, 2017 (5): 143-146.
[14]WANG Fan, XIONG Minghua, NIU Baozhang, et al. Impact of government subsidy on BOT contract design: Price, demand, and concession period[J]. Transportation Research (Part B): Methodological, 2018, 110:137-159.