参考文献/References:
[1] 张忠苗, 辛公锋, 俞洪良, 等. 软土地基管桩挤土浮桩与处理方法研究[J]. 岩土工程学报, 2006, 28(5): 549-552.
ZHANG Zhong-miao, XIN Gong-feng, YU Hong-liang, et al. Study on floating pipe piles and disposal measures in soft soil foundation[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(5): 549-552.
[2]POULOS H G. Effect of pile driving on adjacent piles inclay[J]. Canadian Geotechnical Journal,1994,31( 6): 856-867.
[3]徐美娟,郭玉君,黄广龙. 密排支护桩挤土位移简化计算方法[J]. 四川建筑科学研, 2013, 39(6): 122-126.
XU Meijuan, GUO Yujun, HUANG Guanglong. Simplified calculation method for the soil compacting effect of the retaining pile while close-packing[J], Sichuan Building Science, 2013, 39(6): 122-126.
[4]ROY M. Development of pore pressure in quasi-static penetration test in sensitive clay[J]. Canadian Geotechnical Journal, 1982, 19( 2): 99-110.
[5]唐世栋, 何连生, 傅纵. 软土地基中单桩施工引起的超孔隙水压力[J]. 岩土力学. 2002, 23(6): 725-729.
TANG Shidong, HE Liansheng, FU Zong. Excess pore water pressure caused by an installing pile in soft foundation[J]. Rock and Soil Mechanics. 2002, 23(6): 725-729.
[6]陈又麟, 齐云龙. 考虑透水性的管桩桩周土体固结特性计算[J]. 四川建筑科学研究, 2016, 42(2): 74-77.
CHEN Youlin, QI Yunlong. Analysis on consolidation behavior of the soil around drainage pipe pile considering the permeability of pile[J]. 2016, 42(2): 74-77.
[7]RANDOLPH M F, WROTH C P. An analytical solution for the consolidation around a driven pile[J]. 1979, 3(3):217-229.
[8]RANDOLPH M F, CARTER J P, WROTH C P. Driven piles in clay:The effects of installation and subsequent consolidation[J]. Géotechnique, 1979, 29(4):361-393.
[9]王旭东, 王伟, 宰金珉. 沉桩引起的超孔隙水压力及其消散的三维解析解[J]. 南京工业大学学报(自然科学版)2002, 24(6):16-19.
WANG Xudong, WANG Wei, ZAI Jinmin. 3-dimension analytical formula for excess pore water pressure resulted from pile driving[J]. Journal of Nanjing University of Technology, 2002, 24(6):16-19.
[10]王伟, 宰金珉, 王旭东. 沉桩引起的三维超静孔隙水压力计算及其应用[J]. 岩土力学, 2004(5):102-105,125.
WANG Wei, ZAI Jin-min, WANG Xu-dong. 3D calculation of excess pore water pressure due to driving pile and its application[J]. Rock and Soil Mechanics, 2004(5): 102-105,125.
[11]王伟, 卢廷浩, 宰金珉, 王旭东. 基于超静孔压消散的静压桩极限承载力研究[J]. 岩土力学, 2005(11): 154-157.
WANG Wei, LU Tinghao, ZAI Jinmin, WANG Xudong. Study on ultimate bearing capacity of static pressed pile based on excess pore water pressure dissipation[J]. Rock and Soil Mechanics, 2005(11): 154-157.
[12]高子坤, 施建勇. 饱和黏土中单桩桩周土空间轴对称固结解[J]. 岩土力学, 2008(4):125-128,134.
GAO Zikun, SHI Jianyong. Consolidation solution of soil around single-pile after pile sinking[J]. Rock and Soil Mechanics, 2008(4):125-128,134.
[13]ZHENG JJ, LU YE, YIN JH, Guo J. Radial consolidation with variable compressibility and permeability following pile installation[J]. Computers and Geotechnics, 2010, 37: 408-412.
[14]赵明华, 占鑫杰, 邹新军, 等. 饱和软粘土中沉桩后桩周土体固结分析[J]. 工程力学, 2012, 29(10):91-97.
ZHAO Minghua, ZHAN Xinjie, ZHOU Xinjun, et al. Consolidation analysis around a driven pile in saturated clay[J]. Engineering Mechanics, 2012, 29(10):91-97.
[15]王松江.CFG桩联合碎石桩长短桩结合的复合地基优化设计研究[D].南京:河海大学,2005.
WANG Songjiang. Study on the optimum design about the composite foundation integrated by long piles(CFG piles)and short piles(gravel piles)[D]. Nanjing: Hohai University, 2005.
[16]王伟. 塑料排水板联合CFG桩在处理公路软基中的应用[J]. 北方交通, 2015, 271(11):105-108.
WANG Wei. Application of CFG pile and plastic drainage board in highway soft soil foundation treatment[J]. Northern Transportation, 2015, 271(11):105-108.
[17]陈兴培.振动沉管碎石桩、PHC桩联合处治软土地基的研究[D].重庆:重庆交通大学,2008.
CHEN Xingpei. Study on soft ground treatment by joint methods of vibtation crowded gravel pile an PHC pile[D]. Chongqing:Chongqing Jiaotong University, 2008.
[18]刘孝江. 水泥搅拌桩和塑料排水板联合处理软基的试验研究和工程应用[D].南京:南京林业大学,2005.
The application and experiment research of cement deep mixing pile and plastic drainage well to improve soft-soil roadbed[D]. Nanjing: Nanjing Forestry University, 2005.
[19]唐晓武, 俞悦, 周力沛, 等. 一种能排水并增大摩阻力的预制管桩及其施工方法:CN104846809A[P]. 2015-08-19.
TANG Xiaowu, YU Yue, ZHOU Lipei, et al. A prefabricated pipe pile capable of draining water and increasing friction resistance and construction method:CN104846809A[P]. 2015-08-19.
[20]史美东, 史美生. 砂衬透水混凝土桩设计与施工[J]. 土工基础, 2004, 18(6):35-37.
SHI Meidong, SHI Meisheng. Design and construction of sand lined permeable concrete pile[J]. Soil Engineering Foundation, 2004, 18(6):35-37.
[21]周小鹏, 梅国雄. 考虑固结的透水管桩沉桩全过程有限元模拟[J]. 岩土力学, 2014, 35(z2):676-682.
ZHOU Xiaopeng, MEI Guoxiong. Finite element simulation of permeable pipe pile driving considering consolidation process[J]. Rock and Soil Mechanics, 2014, 35(z2):676-682.)
[22]黄勇, 王军, 梅国雄. 透水管桩加速超静孔压消散的单桩模型试验研究[J]. 岩土力学, 2016(10):2893-2898.
HUANG Yong, WANG Jun, MEI guoxiong. Model experimental study of accelerating dissipation of excess pore water pressure in soil around a permeable pipe pile[J]. Rock and Soil Mechanics, 2016(10):2893-2898.
[23]黄勇, 梅国雄, 王钰轲. 透水管桩的群桩沉桩室内模型试验研究[J]. 河北工程大学学报(自然科学版), 2016, 33(3):18-23.
HUANG Yong, MEI Guoxiong, WANG Yuke. Laboratory model experimental investigation of permeable pipe piles[J]. Journal of Hebei University of Engineering( Natural Science Edition), 2016, 33(3):18-23.
[24]NI P P, MANGALATHU S, MEI GX, et al. Compressive and flexural behaviour of reinforced concrete permeable piles[J]. Engineering Structures, 2017, 147(S15):316-327.
[25]NI PP, MANGALATHU S, MEI GX, et al. Permeable piles: An alternative to improve the performance of driven piles[J]. Computers & Geotechnics, 2017, 84:78-87.
[26]唐晓武, 杨晓秋, 俞悦. 开孔管桩复合地基排水固结解析解[J]. 岩土力学, 2019, 40(4):1248-1254.
TANG Xiaowu, YANG Xiaoqiu, YU Yue. Analytical solutions to drained consolidation of porous pipe pile[J]. Rock and Soil Mechanics, 2019, 40(4):1248-1254.