参考文献/References:
[1] 于远祥,牟志杰,白永彪.挤压流动性隧道底臌机理及控制技术[J].中国公路学报,2012,25(5):105-112.
YU Yuanxiang, MOU Zhijie, BAI Yongbiao. Mechanism and control technology of squeeze flow tunnel bottom heave[J].China Journal of Highway and Transport, 2012, 25(5):105-112.
[2]郑成果. 桃树垭软弱围岩隧道底鼓机理及控制技术研究[D].重庆:重庆大学,2009.
ZHENG Guocheng. Study on the tunnel floor heave mechanism and control technology of soft-weak surrounding rock in Taoshuya tunnel[D]. Chongqing: Chongqing University, 2009.
[3]贺建清,李和志,赵永清,等.底鼓隧道的底板支护锚杆长度确定方法[J].自然灾害学报,2012,21(6):214-220.
HE Jianqing, LI Hezhi, ZHAO Yongqing, et al.The method of determining the length of the anchor bolts of the bottom drum tunnel[J].Journal of Natural Disasters, 2012,21(6):214-220.
[4]田田, 陈卫忠,于建新,等.临海浅埋富水明挖隧道底板合理支护参数研究[J].岩土力学,2013,34(S2):368-374,392.
TIAN Tian, CHEN Weizhong,YU Jianxin,et al.Research on the reasonable support parameters of the slab of the Linhai shallow-buried and water-rich open-cut tunnel[J].Rock and Soil Mechanics, 2013, 34(S2): 368-374,392.
[5]周栋梁,邹金锋.岩溶区分岔隧道底板的安全厚度[J].中南大学学报(自然科学版),2015,46(5):1886-1892.
ZHOU Dongliang, ZOU Jinfeng. The safe thickness of the slab of the fork tunnel in the karst zone[J].Journal of Central South University(Natural Science Edition), 2015, 46(5):1886-1892.
[6]李晓俊.恒山隧道运营期隧道底板病害治理技术研究[J].地下空间与工程学报,2017,13(S1):465-470.
LI Xiaojun. Research on treatment technology of tunnel floor defects during operation period of hengshan tunnel[J].Journal of Underground Space and Engineering, 2017,13(S1):465-470.
[7]腾俊洋,唐建新.层状炭质页岩隧道底鼓机理分析[J].铁道科学与工程学报,2017,14(1):110-116.
TENG Junyang, TANG Jianxin. Analysis on the mechanism of bed heave of layered carbon shale tunnel[J].Journal of Railway Science and Engineering,2017, 14(1):110-116.
[8]程 刚,邓承波.金鸡峡隧道底板突水处治探讨[J].西部探矿工程,2019,31(7):175-177, 179.
CHENG Gang, DENG Chengbo. Discussion on treatment of water inrush from floor of jinjixia tunnel[J].Western Exploration Engineering,2019,31(7):175-177,179.
[9]杨成永,程霖,李延川,等.隧道结构隆起引起的轨道结构变形与脱空[J].铁道工程学报,2019,36(3):19-25,77.
YANG Chengyong, CHENG Lin, LI Yanchuan, et al. Track structure deformation and void caused by tunnel structure uplift[J].Journal of Railway Engineering, 2019, 36(3):19-25,77.
[10]孙广中,黄运飞. 大型地下洞室稳定性维护的弱化原理及技术[R].北京:中国科学院地质所,1988.
SUN Guangzhong,HUANG Yunfei. Weakening principle and technology of stability maintenance of large underground caverns[R]. Beijing:Institute of geology, Chinese Academy of Sciences, 1988.
[11]闫鑫. 高地应力软岩隧道超前应力释放变形控制机理及技术研究[D]. 北京:中国铁道科学研究院,2012.
YAN Xin. Study on mechanism and technology of advanced stress release deformation control of high stress soft rock tunnel[D].Beijing:China Academy of Railway Sciences, 2012.
[12] 侯朝炯,马念杰.煤层巷道两帮煤体应力和极限平衡区的探讨[J].煤炭学报,1989(4):21-29.
HOU Chaojiong, MA Nianjie.Discussion on the stress and limit equilibrium zone of the two sides of coal seam roadway[J].Journal of China Coal Society,1989(4):21-29.
[13]尤春安,宋振骐.抗滑桩控制巷道底臌的理论与实践[J].岩石力学与工程学报,2002,21(增刊):2221-2224.
YOU Chunan, SONG Zhengqi. Theory and application of floor heave control in roadways with anti-slide piles[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(S):2221-2224.
[14]杨军,石海洋,齐干.巷道底角锚杆控制底鼓机理及选型试验[J].采矿与安全工程学报,2016,33(4):643-648.
YANG Jun,SHI Haiyang,QI Gan.Research on mechanism for floor heave control in the roadway by base-angel-bolt and its type selection test[J].Journal of Mining & Safety Engineering,2016,33(4):643-648.
[15]赵均海,马淑芳,魏雪英,等.基于统一滑移线场理论的边坡稳定分析[J].长安大学学报(建筑与环境科学版),2003,20(4):1-4.
ZHAO Junhai, MA Shufang, WEI Xueying, et al. Stability analysis of slope based on unified slip line field[J].Journal of Chang'an University(Architecture and Environment Science Edition),2003,20(4):1-4.