[1]李涛,肖彬,李勇,等.方钢管灌浆连接节点轴压性能试验研究[J].西安建筑科技大学学报(自然科学版),2023,55(05):643-651.[doi:10.15986/j.1006-7930.2023.05.002]
 LI Tao,XIAO Bin,LI Yong,et al.Experimental study on axial compression performance of square hollow section grouted joints[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2023,55(05):643-651.[doi:10.15986/j.1006-7930.2023.05.002]
点击复制

方钢管灌浆连接节点轴压性能试验研究()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
55
期数:
2023年05期
页码:
643-651
栏目:
出版日期:
2023-10-28

文章信息/Info

Title:
Experimental study on axial compression performance of square hollow section grouted joints
文章编号:
1006-7930(2023)05-0643-09
作者:
李涛12肖彬1李勇1李炀1王小平21邵永波3
(1.武汉理工大学 土木工程与建筑学院,湖北 武汉 430000;2.武汉理工大学 海南研究院,海南 三亚 572000;3.西南石油大学 土木工程与测绘学院,四川 成都 610000)
Author(s):
LI Tao12XIAO Bin1LI Yong1LI Yang1WANG Xiaoping21SHAO Yongbo3
(1.School of Civil Engineering and Architecture,Wuhan University of Technology,Wuhan 430000,China; 2.Hainan institute,Wuhan University of Technology,Sanya 572000,China; 3.School of Civil Engineering and Geomatics,SWPU,Southwest Petroleum University,Chengdu 610000,China)
关键词:
模块装配式灌浆连接方钢管抗剪键
Keywords:
modular construction grouted connection square hollow section shear key
分类号:
TU398.9
DOI:
10.15986/j.1006-7930.2023.05.002
文献标志码:
A
摘要:
模块装配式钢结构中不同模块间的连接方式对节点的承载能力和结构整体安全有着重要影响.借鉴海上风机桩基础连接对已有的钢模块间方钢管梁柱节点连接方式进行改进,提出一种带有抗剪键的灌浆连接方式.为了研究灌浆连接抗剪键设置准则,设计了7个方钢管灌浆连接试件并进行了轴压测试,研究了抗剪键的高度h和间距s对试件极限承载能力的影响,并调查了各试件的破坏模式.研究结果表明,外套筒钢材的强度需要和灌浆料强度进行适度的匹配.此外,增加抗剪键的数量可以显著提升试件的极限承载能力,但随着h/s变小,抗剪键提升承载能力的效率会降低.抗剪键数量一定的情况下,适当的增加抗剪键间距s能够略微提升试件的极限承载能力.
Abstract:
The connection mode between different modules in the modular assembled steel structure has an important influence on the bearing capacity of the joints and the overall safety of the structure. In this study, the existing connection method of square steel tube beamcolumn joints between steel modules is improved by referring to the pilefoundation connection of offshore wind turbines, and a grouting connection method with shear keys is proposed. In order to study the setting criteria of shear keys for grouted connections, seven square hollow section grouted connection specimens were designed and tested under axial compression. The effects of the height h and spacing s of shear keys on the ultimate bearing capacity of the specimens were studied, and the failure modes of each specimen were investigated. The results show that the strength of the outer sleeve steel needs to be appropriately matched with the strength of the grouting material. In addition, increasing the number of shear keys can significantly improve the ultimate bearing capacity of the specimen, but as h/s becomes smaller, the efficiency of the shear key to improve the bearing capacity will decrease. In the case of a certain number of shear keys, an appropriate increase in the shear key spacing s can slightly increase the ultimate bearing capacity of the specimen.

参考文献/References:

[1]郝际平,薛强,黄育琪,等. 装配式建筑的系统论研究[J]. 西安建筑科技大学学报(自然科学版),2019,51(1):14-20,26.

HAO Jiping,XUE Qiang,HUANG Yuqi,et al. Research on System Theory of Prefabricated Buildings [J]. J. Xi′an Univ. of Arch. & Tech. (Natural Science Edition),2019,51(1):14-20,26.
[2]刘锋. 装配式模块化箱型建筑在国家应急管理体系中的应用[J]. 中国建筑金属结构,2020(5):67-69.
LIU Feng.Application of prefabricated modular box building in national emergency management system [J].China Building Metal Structure,2020(5):67-69.
[3]相阳,罗永峰,黄青隆. 装配式钢结构抗震性能研究进展[J]. 建筑钢结构进展,2019,21(3):1-12.
XIANG Yang,LUO Yongfeng,HUANG Qinglong. Research progress on seismic performance of fabricated steel structures [J]. Progress in Building Steel Structures,2019,21(3):1-12.
[4]黄丹,王卫永.装配式钢结构建筑体系研究及应用综述[J].建筑钢结构进展,2022,24(8):1-18.
HUANG Dan,WANG Weiyong. Review of research and application of prefabricated steel structure building system [J/OL]. Progress in Building Steel Structure,2022,24(8):1-18.
[5]梁晓婕,王燕. 钢结构装配式半刚性连接节点研究进展[J]. 建筑钢结构进展,2022,24(1):1-14.
LIANG Xiaojie,WANG Yan. Research progress on prefabricated semi-rigid connection joints in steel structures [J]. Progress in Building Steel Structures,2022,24(1):1-14.
[6]卢林枫,王璐璐,徐莹璐,等. 钢框架弱轴梁端翼缘侧板加强式节点滞回性能有限元分析[J]. 西安建筑科技大学学报(自然科学版),2017,49(5):646-653.
LU Linfeng,WANG Lulu,XU Yinglu,et al. Finite element analysis of hysteretic performance of steel frame weakaxis beam end flange side plate reinforced joints [J]. J. Xi′an Univ. of Arch. & Tech. (Natural Science Edition),2017,49(5) : 646653.
[7]王玉田,王燕,姜福香. 钢框架加强型梁柱连接的抗震机理研究[J]. 西安建筑科技大学学报(自然科学版),2011,43(1):31-35,80.
WANG Yutian,WANG Yan,JIANG Fuxiang. Research on seismic mechanism of steel frame reinforced beamcolumn connection [J]. J. Xi′an Univ. of Arch. & Tech. (Natural Science Edition),2011,43(1):31-35,80.
[8]CHEN C C,LIN C C,LIN C H. Ductile moment connections used in steel column-tree moment-resisting frames[J]. Journal of Constructional Steel Research,2005,62(8):793-801.
[9]CHEN C C,LIN C C. Seismic performance of steel beamtocolumn moment connections with tapered beam flanges[J]. Engineering Structures,2013,48: 588-601.
[10]郁有升,张颜颜,李建峰.. 一种新型梁柱装配式刚性节点滞回性能研究[J]. 建筑钢结构进展,2014,16(2):1-5,12.
YU Yousheng,ZHANG Yanyan,LI Jianfeng,et al. Research on hysteretic performance of a new type of beam-column fabricated rigid joints [J]. Progress in Building Steel Structures,2014,16(2): 1-5,12.
[11]张爱林,吴靓,姜子钦,等. 端板型装配式钢结构梁柱节点受力机理研究[J]. 工业建筑,2017,47(7):6-12.
ZHANG Ailin,WU Liang,JIANG Ziqin,et al.Research on the stress mechanism of beam-column joints of end-plate prefabricated steel structures [J]. Industrial Architecture,2017,47(7):6-12.
[12]CHEN Z H,LIU J D,YU Y J. Experimental study on interior connections in modular steel buildings[J]. Engineering Structures,2017,147: 625-638.
[13]CHEN Z H,LIU J D,YU Y J,et al. Experimental study of an innovative modular steel building connection[J]. Journal of Constructional Steel Research,2017,139:6982.
[14]刘学春,任旭,詹欣欣,等. 一种盒子式模块化装配式钢结构房屋梁柱节点受力性能分析[J]. 工业建筑,2018,48(5):62-69.
LIU Xuechun,REN Xu,ZHAN Xinxin,et al. Mechanical performance analysis of beam-column joints of a box-type modular prefabricated steel structure house [J]. Industrial Architecture,2018,48(5):62-69.
[15]西文喜. 海上风机基础水下灌浆连接段受力性能研究[D]. 青岛:中国石油大学(华东),2018.
XI Wenxi. Research on mechanical performance of underwater grouting connection section of offshore wind turbine foundation [D]. Qingdao:China University of Petroleum (East China),2018.
[16]陈涛,张持海,王衔,等. 海上风机基础灌浆连接段轴心受压承载力数值分析[J]. 同济大学学报(自然科学版),2020,48(10):1452-1459.
CHEN Tao,ZHANG Chihai,WANG Xian,et al. Numerical analysis of axial compression bearing capacity of foundation grouting connection section of offshore wind turbines [J]. Journal of Tongji University (Natural Science Edition),2020,48(10):1452-1459.
[17]王衔,邱松,陈涛,等. 考虑水流侵入的海上风机基础灌浆连接段疲劳性能试验研究[J]. 结构工程师,2021,37(6):172-181.
WANG Xian,QIU Song,CHEN Tao,et al. Experimental study on fatigue performance of foundation grouting connection section of offshore wind turbine considering water flow intrusion [J]. Structural Engineer,2021,37(6):172-181.
[18]DAI Z Q,PANG S D,LIEW J Y R. Axial load resistance of grouted sleeve connection for modular construction[J]. Thin-Walled Structures,2020,154:203-224.
[19]HUANG Z Y,ZHANG W,FAN S Y,et al. Axial-Load Resistance of a Novel UHPFRC Grouted SHS Tube-Sleeve Connection: Experimental,Numerical,and Theoretical Approaches[J]. Journal of Structural Engineering,2021,147(11):82-98.
[20]HE Z Y,ZHANG T,LI T. Static bearing capacity investigation of grouted square hollow section sleeve connection[J]. Advances in Structural Engineering,2022,25(1) : 3-13.
[21]American Petroleum Institute. API recommended practice 2A-WSD: Planning, designing and constructing fixed offshore platformsWorking stress design. API RP2A-WSD-22th[S]. Washington DC: API Publishing Services,2014.
[22]国家市场监督管理总局,国家标准化管理委员会.金属材料拉伸第一部分:室温试验方法GB/T228-2021[S]. 北京:中国标准出版社,2021.
State Administration for Market Regulation,Standardization Administration of the People′s Republic of China. Metallic materials——Tensile testing—Part 1: Method of test at room temperature:GB/T228-2021 [S]. Beijing:Standards Press of China,2021.
[23]国家市场监督管理总局,国家标准化管理委员会.水泥胶砂强度检验方法(ISO法):GB/T17671—2021[S]. 北京:中国标准出版社,2021.
State Administration for Market Regulation,Standardization Administration of the People′s Republic of China. Test method of cement mortar strength (ISO method):GB/T17671—2021[S]. Beijing:Standards Press of China,2021.
[24]武立伟,苏幼坡,陈海彬,等. 钢管灌浆套筒连接轴向受压性能试验研究[J]. 建筑结构学报,2019,40(11):191-199.
WU Liwei,SU Youpo,CHEN Haibin,et al. Experimental study on axial compression performance of steel pipe grouting sleeve connection [J]. Journal of Building Structures,2019,40(11):191-199.
[25]KRAHL N W,KARSAN D I. Axial strength of grouted pile-to-sleeve connections [J]. Journal of Structural Engineering,1985,111(4): 889-905
[26]刘永颐,关建光,王传志. 混凝土局部承压强度及破坏机理[J]. 土木工程学报,1985(2):53-65.
LIU Yongyi,GUAN Jianguang,WANG Chuanzhi. Local compressive strength and failure mechanism of concrete [J]. Chinese Journal of Civil Engineering,1985(2):53-65.
[27]WANG X,CHEN T,ZHAO Q,et al. Fatigue evaluation of grouted connections under bending moment in offshore wind turbines based on ABAQUS scripting interface.International Journal of Steel Structures,2016,16(4):1149-1159.

备注/Memo

备注/Memo:
收稿日期:2022-07-10修回日期:2023-08-15
基金项目:国家自然科学基金资助项目(51908437);2021年海南省重点研发计划基金资助项目(ZDYF2021GXJS211);海南省科技专项基金资助项目(ZDKJ2021024);中央高校基本科研业务费专项资金资助项目(项目批准号:2020IVB0090,2020IVB009)
第一作者:李涛(1984—),男,博士,副教授,主要从事装配式钢-组合结构及钢结构的疲劳寿命预测方法与断裂性能评估研究.Email:scealitao@whut.edu.cn
更新日期/Last Update: 2023-11-02