[1]祁神军,丁烈云,骆汉宾.建设企业集团多项目关键资源配置有效性评估[J].西安建筑科技大学学报:自然科学版,2011,43(01):119-124.[doi:DOI:10.15986/j.1006-7930.2011.01.011]
 ,,et al.Evaluation of resource allocation rationalityfor multi-Projects between the construction enterprise group[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(01):119-124.[doi:DOI:10.15986/j.1006-7930.2011.01.011]
点击复制

建设企业集团多项目关键资源配置有效性评估()
分享到:

西安建筑科技大学学报:自然科学版[ISSN:1006-7930/CN:61-1295/TU]

卷:
43
期数:
2011年01期
页码:
119-124
栏目:
出版日期:
2011-02-28

文章信息/Info

Title:
Evaluation of resource allocation rationality
for multi-Projects between the construction enterprise group
文章编号:
1006-7930(2011)01-0119-06
作者:
祁神军12 丁烈云12骆汉宾2
1.华侨大学土木工程学院,福建 厦门 361021;2.华中科技大学土木学院,湖北武汉430074)
Author(s):
QI Shen-jun1DING Lie-yun1LUO Han-bin2
(1.College of Civil Engineering.Huaqiao University,Fujian Xiamen 361021,China;2.School of Civil Engineering &
Mechanics,Huazhong University of Science & Technology,Wuhan 430074,China
关键词:
建设企业集团多项目关键资源配置有效性评估
Keywords:
Construction Enterprise Groups Multi-Projects Key Resources Evaluation of Resource Allocation Rationality
分类号:
TU375.4
DOI:
DOI:10.15986/j.1006-7930.2011.01.011
文献标志码:
A
摘要:
合理的资源配置是建设企业集团多项目成功的关键因素.但如何评判资源配置的合理性、及时性,并
采取科学的措施,调整多项目的资源配置,至关重要.本文采用静态的RPM 平面图分析和动态的RPM 分析
图技术,不仅对多项目在某一时刻的流动资金、物资、设备等关键资源配置的合理性进行评估,还对多项目在
某一个阶段的流动资金、物资、设备等关键资源的配置的科学性和有效性进行评估,为建设企业集团多项目之
间的资源优化配置提出科学建议和措施.通过案例分析,证明了RPM 是对建设企业集团多项目资源配置有
效性评估的有效方法之一.
Abstract:
The key to multi-projects management in the Construction Enterprise Groups is rational resources allocation. But the most important work is how to evaluate the rationality of resources allocation.This paper adopted static-complanate RPM(Resource Portfolio Management,RPM), dynamic-transect RPM and whole RPM,allocation rationality of capital,equipments and materials were evaluated. According to the evaluation result,scientific advice and measures were proposed for the Construction Enterprise Groups. With a case studied, which proved that RPM was an effective way for evaluating the rationality of resources allocation among the multi-projects in the Construction Enterprise Groups

参考文献/References:

References
[1] John A S.Critical size events:a new tool for crisis management resource allocation[J].Safety Science,2003,41:
465-480.
[2] MESSINA E,SCIOMACHEN A.Evaluation of resource allocation policies in a production line using Petri nets[J].
Robotics and Computer-Integrated Manufacturing,1993,10(6):413-422.
[3] HENDRIKS M H A,VOETEN B,KROEP L.Human resource allocation in a multi-project R&D environment:
Resource capacity allocation and project portfolio planning in practice[J].International Journal of Project Management,
1999,17(3):181-188.
[4] 熊 鹰,郭婧娟,周凤萍.建设项目资源优化配置理论[J].北京交通大学学报:社会科学版,2007.6(2):18-22.
XIONG Ying,Guo Jing-juan,Zhou Feng-ping.Theory of Construction Project Optimization Resources Scheme[J].
Journal of Beijing Jiaotong University(Social Sciences Edition),2007.6(2):18-22.
[5] 黄玉坤,崔新媛.项目施工资源配置的模糊综合评价模型研究[J].山西建筑,2005.31(18):6-7.
HUANG Yu-kun,CUI Xin-yuan.Research on fuzzy overall evaluation for allocation of project construction resources
[J].Shanxi Architecture,2005,31(18):6-7.
[6] 陈 宁,章雪岩,周国华.多项目管理中企业资源配置效率模型[J].工业工程,2006.9(5):92-97.
CHEN Ning,ZHANG Xue-yan,ZHOU Guo-hua.Model of resource allocation efficiency in enterprise multi-project
management[J].Industrial Engineering Journal,2006,9(5):92-97.
[7] 矢矧晴一郎.企业经营战略的制定及实施方法·案例[M].北京:职工教育出版社,1989:182-193.
YILANG S Z Q.Establishing entergrise managment strategies and exealting methods-with Case study[M].Bejing:
Staff and Workers Education Press,1989:182-193.
[8] 赵国杰,白 玮.资源配置有效性分析的RPM 方法[J].工业工程,2004.7(4):6-9.
ZHAO Guo-jie,BAI Wei.RPM method for the validity analysis of resource allocation[J].Industrial Engineering
Journal,2004,7(4):6-9.
[9] 易世志.浅析波士顿矩阵法的局限.商业研究[J].2005,324(16):101-104.
YI Shi-zhi.The limitation of BCG matrix approach[J].Commercial Research,2005,324(16):101-104

备注/Memo

备注/Memo:
收稿日期:2010-03-15  修改稿日期:2010-12-10
基金项目:中港二航局信息化建设若干子系统研究与开发资助项目;华侨大学高层次人才引进基金资助项目(09BS623);国侨办基
金资助项目(06Q0052)
作者简介:祁神军(1982-),男,湖北宣恩人,博士,讲师,研究方向为大型建设企业集团管控.
更新日期/Last Update: 2015-11-01