参考文献/References:
[1] 孟建文.热水锅炉锅水汽化的危害和预防措施[J].山西建筑,2009,35(21):187-188.
MENG Jian-wen.Harm of vaporization of water in hot water boiler and preventive measure[J].Shanxi architecture,2009,35(21):187-188.
[2] 张学军,范宪民,李志宏等.热水锅炉水冷壁的汽化与防止[J].特种设备安全技术,2006(5):12-13.
ZHANG Xue-jun,FAN Xian-min,LI Zhi-hong,et al.Hot water boiler water wall and prevention of evaporation[J].Special equipment Safety Technology,2006(5):12-13.
[3] 张俊革,吕素霞.对一起热水锅炉爆管事故的分析[J].林业劳动安全,2006,19(2):42-43.
ZHANG Jun-ge,LU Su-xia.Analysis of a pipe crack accident of hot water boilers[J].Forestry Labour Safety,2006,19(2):42-43.
[4] REZINSKIKH V F,GRIN E A,and BUKIN Y A.Operation reliability and prospects of continuation of service of the thermomechanical equipment of the surgut gres-2[J].Power Technology and Engineering,2005,39(3):156-159.
[5] WALTER H,LINZER W.Investigation of the stability of a natural circulation two-pass boiler[J].Heat Mass Transfer,2006(42):562-568.
[6] 陈忠华,刘伟然,郭凤仪,等.燃煤热水锅炉节能控制改造[J].煤矿机电,2008(1):100-102.
CHEN Zhong-hua,LIU Wei-ran,GUO Feng-yi,et al.Transformation of energy saving control for coa1-fired hot water boiler[J].Coal mine electromechanical equipment,2008(1):100-102.
[7] WANG D,YANG T,WEN Z,et al.A mathematical model for optimized operation and control in a CDQ-Boiler system[J].Journal of University of Science and Technology Beijing,2005,12(5):390-393.
[8] ZOU T,LIU HH B,LI S Y.A practical predictive control algorithm for integral processes and a case study in boiler level system[J].High Technology Letters,2005,11(3):263-267.
[9] XU M,LI S Y.The real time cascade generalized predictive control and application to a boiler circuit system[J].High Technology Letters,2005,11(2):193-196.
[10] VAGNER A A.Raising the reliability,efficiency,and ecological safety of operation of the BKZ-210-140 Fboiler transterred to stage firing of Kuznetsk coal in a U-shape flame[J].Power Technology and Engineering,2004,38(3):159-163.
[11] TALER J,DZIERWA P,TALER D.Optimum heating of pressure components of large steam boilers[J].Forsch Ingenieurwes,2009(73):83-192.
[12] OSINTSEV V V,SUKHAREV M P,TOROPOV E V,et al.Improvement of the process of fuel firing on BKZ-210-140Fboilers[J].Power Technology and Engineering,2007,41(1):34-40.
[13] VASILENKO G V,ZAREMBO V I,SLOBODOV A A.Transport of contaminants with boiler water steam[J].Power Technology and Engineering,2005,39(5):290-291.
[14] GOLYSHEV L V and DOVGOTELES G A.Optimization of reginmes for the feed of highly concentrated culm-anthracite coal dust for burning in a TPP-210Aboiler[J].Power Technology and Engineering,2007,41(3):171-175.
[15] 战 威,马和宝.常压热水锅炉供热系统[J].工业锅炉,2008,110(4):51-52.
ZHAN Wei,MA He-bao.Heating supply system of normal atmosphere boiler[J].Industrial boiler,2008,110(4):51-52.
[16] 杜少俊,杨宇亮.工业热水锅炉水循环故障原因分析[J]太原理工大学学报,2005,36(5):603-605.
DU Shao-jun,YANG Yu-liang.Cause analysis of water circulating breakdown of industrial hot-water boile[J].Journal of Taiyuan University of Technology,2005,36(5):603-605.