参考文献/References:
[1] 陆 宁,廖向晖,王 巍,等.大型施工项目管理可靠性综合控制的构架研究[J].重庆建筑大学学报,2007,29(2):132-134.
LU Ning,LIAO Xiang-hui,WANG Wei,et al.Comprehensive Control Technique of Reliability in Large Construction Project Management[J].Journal of Chong qing Jian zhu University,2007,29(2):132-134.
[2] 赛云秀.项目三大目标相互作用分析[J].建筑经济,2008(8):73-76.
SAI Yun-xiu.Analyzing the interaction of three major objectives of the project[J].Construction Economy.2008(8):73-76.
[3] ATKINSON R.Project management:cost,time and quality,two best guesses and a phenomenon,its time to accept other success criteria[J].International Journal of Project Management,1999,17(6):337-342.
[4] 王延树,成虎.大型施工项目的集成管理[J].东南大学学报:自然科学版,2000,30(4):100-104.
WANG Yan-shu,CHENG Hu.Integrated Management of Construction Project[J].Journal of Southeast University.:Natural Science Edition,2000,30(4):100-104
[5] 苑东亮,徐德龙,李慧民.建筑工程项目目标控制研究[J].西安建筑科技大学学报:自然科学版,2010,42(1):100-104.
YUAN Dong-liang,XU De-long,LI Hui-min.Research on construction project target control[J].J.Xi′an Univ.of Arch.& Tech.:Natural Science Edition,2010,42(1):100-104.
[6] RODTIGUES A,BOWERS J.The role of system dynamics in project management[J].International Journal of Project Management,1996,14(4):213-220.
[7] 王其藩.系统动力学[M].北京:清华大学出版社,1998.
WANG Qi-fan.System dynamics[M].Beijing:Tsinghua University Press,1998.
[8] 刘 林,曹艳平.应用模糊数学[M].2版.西安:陕西科学技术出版社.2008.
LIU Lin,CAO Yan-Ping.Application of Fuzzy Mathematics[M]:2nd ed..Xi′an:Shaanxi Science and Technology Press.2008.
[9] 刘 洋,卢 梅.基于系统动力学方法的工程项目管理[J].科技管理研究,2011(8):183-186.
LIU Yang,LU Mei.Based on system dynamics method of project management[J],Science and Technology Management Research,2011(8):183-186.
相似文献/References:
[1]蒋卫平,张 谦,乐 云,等.工程项目中信任的产生与影响——基于承包商方视角[J].西安建筑科技大学学报:自然科学版,2012,44(01):97.[doi:10.15986/j.1006-7930.2012.01.016]
JIANG Wei-ping,ZHANG Qian,LE Yun,et al.Occurrence and function of trust in construction projects from the view of the contractor[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2012,44(03):97.[doi:10.15986/j.1006-7930.2012.01.016]
[2]史玉芳,李慧民,陆宁.工程项目施工系统可靠性及计算方法研究[J].西安建筑科技大学学报:自然科学版,2011,43(01):125.[doi:DOI:10.15986/j.1006-7930.2011.01.001]
SHI Yu-fang,LI Hui-min,LU Ning.Research on construction system reliability of construction projectand its calculation method[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(03):125.[doi:DOI:10.15986/j.1006-7930.2011.01.001]
[3]史玉芳,王秀芬,康 珅.基于模糊的工程项目施工可靠性评价研究[J].西安建筑科技大学学报:自然科学版,2015,47(05):740.[doi:DOI:10.15986/j.1006-7930.2015.05.023]
SHI Yufang,WANG Xiufen,KANG Shen.Study on evaluation of construction reliability for engineering project[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(03):740.[doi:DOI:10.15986/j.1006-7930.2015.05.023]
[4]史泽运,李勇.基于系统动力学的国际工程项目承包商单因素风险处置模式逻辑构建研究[J].西安建筑科技大学学报:自然科学版,2018,50(04):609.[doi:10.15986/j.1006-7930.2018.04.022]
SHI Zeyun,LI Yong.Research on the logical construction of single factor risk disposal model for international engineering project contractors based on system dynamics[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2018,50(03):609.[doi:10.15986/j.1006-7930.2018.04.022]