参考文献/References:
[1] 刘庆宽,强士中,张 强,等.斜拉桥锚箱式索梁锚固区应力分析[J].桥梁建设,2001(5):14-16.
LIU Qing-kuan,QIANG Shi-zhong,ZHANG Qiang,et al.Analysis of Stress in Anchorage Zone between Boxshaped Steel Beam and Cable in Cable-stayed Bridge[J].Bridge Construction,2001(5):14-16.
[2] 韩富庆,杨成斌,娄 建,等.安庆长江公路大桥索塔锚固区受力分析[J].合肥工业大学学报:自然科学版,2002,26(6):1167-1170.
HAN Fu-qing,YANG Cheng-bin,LOU Jian,et al.Mechanical analysis of anchorage area of cable support tower of Anqing Changjiang Highway Bridge[J].Journal of Hefei University of Technology:Natural Science,2002,26(6):1167-1170.
[3] 彭 苗,陈升平,余天庆,等.巴东长江大桥索塔锚固区节段模型试验与空间应力分析[J].武汉理工大学学报,2004,28(5):759-762.
PENG Miao,CHEN Sheng-ping,YU Tian-qing,et al.Anchorage Zone of Cable-stayed Tower in Badong Changjiang Highway Bridge:Model Test and Spatial Stress Analysis[J].Journal of Wuhan University of Technology,2004,28(5):759-762.
[4] 熊 刚,谢 斌,黄思勇,等.天津保定桥索塔锚固区钢锚箱空间分析[J].华中科技大学学报:城市科学版,2009,26(4):80-83.
XIONG Gang,XIE Bin,HUANG Si-yong,et al.Space Analysis of Steel Anchor Box for Cable-tower Anchorage of Tianjin Baoding Bridge[J].Journal of Huazhong University of Science and Technology:Urban Science Edition,2009,26(4):80-83.
[5] 万 臻,李 乔,毛学明.大跨度斜拉桥钢锚箱式索梁锚固结构空间有限元模型比较研究[J].四川建筑科学研究,2006,32(1):26-31.
WAN Zhen,LI Qiao,MAO Xue-ming,Comparison and analysis of 3D-finite-element models of steelanchor-box at the cable-girder anchorage zone for long-span cable-stayed bridge[J].Sichuan Building Science,2006,32(1):26-31.
[6] 彭 霞,王行耐.钢锚箱式索梁锚固区段有限元仿真分析[J].公路,2009(9):28-33.
PENG Xia,WANG Xing-nai.Finite Element Analysis of Cable-Girder Anchorage Zone for Cable-Stayed Bridge with Steel Anchor Box[J].Highway,2009(9):28-33.
[7] 狄 谨,周绪红,游金兰,等.钢箱梁斜拉桥索塔锚固区的受力性能[J].中国公路学报,2007,20(4):48-52.
DI Jin,ZHOU Xu-hong,YOU Jin-lan,Mechanical Property of Cable-pylon Anchorage Zone of Cable-stayed Bridge with Steel Box Girder[J].China Journal of Highway and Transport,2007,20(4),48-52.
[8] 吴 冲,韦杰鼎,曾明根,等.上海长江大桥斜拉桥索梁锚固区静力试验研究[J].桥梁建设,2007(6):30-33.
WU Chong,WEI Jie-ding,ZENG Ming-gen,et al.Experimental Study of Static Force in Cable and Girder Anchor Zone of Cable-Stayed Bridge of Shanghai Changjiang River Bridge[J].Bridge Construction,2007(6):30-33.
[9] 郑 刚,王天亮.猎德大桥吊索锚箱传力和疲劳性能试验方案设计[J].世界桥梁,2009(1):49-52.
ZHENG Gang;WANG Tian-liang.Testing Scheme Design for Load Transferring and Fatigue Performance of Suspender Anchor Boxes of Liede Bridge[J].World Bridges,2009(1):49-52.
相似文献/References:
[1]郭 琦,叶全斌,尹海军,等.预应力钢绞线网加固混凝土桥梁的索力分布试验研究[J].西安建筑科技大学学报:自然科学版,2014,46(01):44.[doi:10.15986/j.1006-7930.2014.01.009]
GUO QiYE QuanbinYIN HaijunYAN Wen.Experimental study of distribution on prestressed strand mesh in strengthening concrete bridges[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2014,46(06):44.[doi:10.15986/j.1006-7930.2014.01.009]
[2]任 伟,盖轶婷,黄亚男.软场地土拓宽桥梁地震响应分析[J].西安建筑科技大学学报:自然科学版,2014,46(04):502.[doi:10.15986/j.1006-7930.2014.04.008]
REN Wei,GAI YiTing,HUANG Yanan.Seismic response analysis of widening bridges in soft site[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2014,46(06):502.[doi:10.15986/j.1006-7930.2014.04.008]
[3]郭 琦,尹海军,贺拴海.混凝土梁桥钢筋工作应力释放法试验研究[J].西安建筑科技大学学报:自然科学版,2015,47(04):517.[doi:10.15986/j.1006-7930.2015.04.010]
GUO Qi,YIN Haijun,HE Shuanhai.Study on stress release method of reinforced for concrete girder bridge[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(06):517.[doi:10.15986/j.1006-7930.2015.04.010]
[4]景天虎1,2,李 桅1,等.悬索桥主缆线形确定的常用精确解析算法比较及电算高效实现方法研究[J].西安建筑科技大学学报:自然科学版,2011,43(06):821.[doi:DOI:10.15986/j.1006-7930.2011.06.010]
,,et al.Comparison on common precise numerical analytical algorithmsto determine main cables’curve shape in suspension bridges andstudy on highly effective methods of computati[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(06):821.[doi:DOI:10.15986/j.1006-7930.2011.06.010]
[5]周勇军,韩智强,赵 煜,等.高墩大跨弯连续刚构桥冲击系数计算公式[J].西安建筑科技大学学报:自然科学版,2016,48(02):207.[doi:10.15986/j.1006-7930.2016.02.010]
ZHOU Yongjun,HAN Zhiqiang,ZHAO Yu,et al.Dynamic load allowance formula of long-span continuous curved rigid frame bridge with high piers[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2016,48(06):207.[doi:10.15986/j.1006-7930.2016.02.010]
[6]邵旭东,邱明红,晏班夫,等.基于UHPC材料的高性能装配式桥梁结构研发[J].西安建筑科技大学学报:自然科学版,2019,51(02):160.[doi:10.15986/j.1006-7930.2019.02.002]
SHAO Xudong,QIU Minghong,YAN Banfu,et al.Research of high performance fabricated bridge structures based on UHPC[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2019,51(06):160.[doi:10.15986/j.1006-7930.2019.02.002]
[7]冯峥,李传习,邓帅,等.钢UHPC组合梁桥面板静承载能力比较分析[J].西安建筑科技大学学报:自然科学版,2019,51(04):551.[doi:10.15986/j.1006-7930.2019.04.013]
FENG Zheng,LI Chuanxi,DENG Shuai,et al.Comparative analysis of static bearing capacity on bridge deck in Steel-UHPC composite beams[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2019,51(06):551.[doi:10.15986/j.1006-7930.2019.04.013]
[8]郭风俊.基于ANSYS的不平衡日照混凝土箱梁温度场分布研究[J].西安建筑科技大学学报:自然科学版,2020,52(02):207.[doi:10.15986/j.1006-7930.2020.02.008]
GUO Fengjun.Research on temperature field distribution of unbalanced sunshine concrete box girder based on ANSYS[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2020,52(06):207.[doi:10.15986/j.1006-7930.2020.02.008]
[9]辛公锋,龙关旭,袁阳光,等.高强钢丝两种镀层耐蚀性及点蚀概率模型[J].西安建筑科技大学学报:自然科学版,2023,55(04):616.[doi:10.15986/j.1006-7930.2023.04.018
]
XIN Gongfeng,LONG Guanxu,YUAN Yangguang,et al.Corrosion resistance and pitting probability models of two kinds of coatings on high strength steel wires[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2023,55(06):616.[doi:10.15986/j.1006-7930.2023.04.018
]
[10]刘继,李珍,药天运.熔丝制造3D打印CFRP层内损伤破坏机理与模型研究[J].西安建筑科技大学学报:自然科学版,2024,56(01):74.[doi:10.15986/j.1006-7930.2024.01.010]
LIU Ji,LI Zhen,YAO Tianyun.Research on damage and failure mechanism and model of 3D printed cfrp layer by fused filament fabrication[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2024,56(06):74.[doi:10.15986/j.1006-7930.2024.01.010]