[1]闫瑞琦,李慧民,李小娟.可拓判别划分旧工业建筑再生利用项目评价阶段[J].西安建筑科技大学学报:自然科学版,2013,45(04):533-539.[doi:10.15986/j.1006-7930.2013.04.012]
 YAN Rui-qi,LI Hui-min,LI Xiao-juan.Study on defining the evaluation stage of old industrial building recycling projects[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2013,45(04):533-539.[doi:10.15986/j.1006-7930.2013.04.012]
点击复制

可拓判别划分旧工业建筑再生利用项目评价阶段()
分享到:

西安建筑科技大学学报:自然科学版[ISSN:1006-7930/CN:61-1295/TU]

卷:
45
期数:
2013年04期
页码:
533-539
栏目:
出版日期:
2013-08-31

文章信息/Info

Title:
Study on defining the evaluation stage of old industrial building recycling projects
文章编号:
1006-7930(2013)04-0533-07
作者:
闫瑞琦12李慧民1李小娟3
(1.西安建筑科技大学土木工程学院,陕西 西安 710055, 2.中国城乡发展有限公司,北京 100036; 3.中铁建设集团有限公司,北京 100131)
Author(s):
YAN Rui-qi12LI Hui-min1LI Xiao-juan3
(1.School of Civil Engineering of Xian Architecture and Technology, Xian 710055,China; 2.China Urban And Rural Construction Development CO. Beijing 100191,China; 3.China Railway Construction Group Co. Ltd. Beijing 100131,China)
关键词:
旧工业建筑再生利用可拓判别法关联函数
Keywords:
old industrial buildings recycling extension discrimination law correlation function
分类号:
TU 20
DOI:
10.15986/j.1006-7930.2013.04.012
文献标志码:
A
摘要:
旧工业建筑再生利用项目已经成为现阶段新城镇建设的重要模式,目前该类项目的实施还没有健全完善的评价体系.研究旧工业建筑再生利用项目的评价体系,要对评价阶段进行合理划分.借鉴工程项目管理程序和项目全寿命周期的划分方式,运用可拓判别的方法,根据旧工业建筑再生利用项目的特点,设定判别阶段总体和特征值,建立可拓判别模型和关联函数,对旧工业建筑再生利用项目全过程评价阶段界定划分.由此可以根据每个阶段的评价重点设定分阶段的评价指标体系,建立具有阶段性、层次性、递进性的旧工业建筑再生利用评价体系.
Abstract:
The project of old industrial buildings recycling has become the main mode of new town ’s construction at this stage, but there’s no impeccable evaluation system for such projects. The study on this system is built upon the reasonable classification of evaluation stage. Referring to the classified methods of project management program and the project ’s life cycle, and using the extension discriminant method according to characteristics of the old industrial buildings recycling project, the extension discriminant model as well as the correlation function is established to classify the evaluation stage of old industrial buildings recycling in its entire life cycle. According to the key issue of each phase, each phase’s evaluation system can be established, and is built a phased hierarchical and gradual evaluation system of the old industrial buildings recycling

参考文献/References:

[1] 蔡 文, 杨春燕, 林伟初. 可拓工程方法[M]. 北京: 科学出版社,1997:202-209.
CAI Wen, YANG Chun-yan, LIN Wei-chu.Extension Engineering Method[M].Beijing: Science Press, 1997,202-209.
[2] 杨春燕, 蔡 文. 可拓工程[M]. 北京: 科学出版社,2007:82-97,331-345.
YANG Chun-yan, CAI Wen.Extension Engineering[M].Beijing: The Science Press, 2007:82-97,331-345.
[3] 李日华, 毛 凯, 周 刚.Bayes-可拓判别[J]. 系统工程理论与实践,2005(7):131-135.
LI Ri-hua, MAO Kai, ZHOU Gang.Bayes-Extension Discrimination[J].System Engineering -Theory&Practice,2005(7):131-135.
[4] LI Hui-min,YAN Rui-qi.Studyon EvaluationIndexesof Recyclingfor OldIndustrial Buildings Basedonthe Theo-ryofSustainable Development [C].CRIOCM2009,2009(4):1949-1952.
[5] ALFREYJ, PUTNAM T.TheIndustrialHeritageManagingresourcesand uses [M].London: Routledge, 1992.[6] LIU Wei, TANG Guo-an.Thestrategiesforthesustainabledevelopmentoftheoldindustrialbuildingin China[C].Green Building Technologies and Materials, 2011, 224:216-219.

相似文献/References:

[1]陈 旭,李慧民.旧工业建筑(群)再生利用效果评价方法研究[J].西安建筑科技大学学报:自然科学版,2013,45(03):397.[doi:10.15986/j.1006-7930.2013.03.016]
 CHEN Xu,LI Hui-min.Study on recycling effect evaluation method for old industrial building complex[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2013,45(04):397.[doi:10.15986/j.1006-7930.2013.03.016]
[2]李慧民,田 卫,闫瑞琦.旧工业建筑(群)再生利用评价指标体系构建[J].西安建筑科技大学学报:自然科学版,2013,45(06):772.[doi:10.15986/j.1006-7930.2013.06.003]
 LI Hui-min,TIAN Wei,YAN Rui-qi.Constituting recycling evaluation index system for old industrial buildings(Group)[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2013,45(04):772.[doi:10.15986/j.1006-7930.2013.06.003]
[3]武 乾,武晓然,余晓松.利用改进净现值法降低旧工业建筑投资不确定性研究[J].西安建筑科技大学学报:自然科学版,2014,46(02):247.[doi:10.15986/j.1006-7930.2004.02.016]
 WU Qian,WU Xiaoran,YU Xiaosong.Study on reducing the investment uncertainty with old industrial building basedon the improved method of net present value[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2014,46(04):247.[doi:10.15986/j.1006-7930.2004.02.016]
[4]张 扬,李慧民.基于SEM的旧工业建筑绿色改造影响因素分析——以开发阶段为例[J].西安建筑科技大学学报:自然科学版,2015,47(05):689.[doi:DOI:10.15986/j.1006-7930.2015.05.014]
 ZHANG Yang,LI Huimin.Analysis of the influencing factors on the green transformation ofold industrial buildings based on the SEM[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(04):689.[doi:DOI:10.15986/j.1006-7930.2015.05.014]
[5]李 勤,张 扬,樊胜军.基于利益相关者视角的旧工业建筑再生设计指标研究[J].西安建筑科技大学学报:自然科学版,2016,48(03):412.[doi:10.15986/j.1006-7930.2016.03.018]
 LI Qin,ZHANG Yang,FAN Shengjun.Research on the influence index of green regeneration of old industrial buildings from stakeholder’s perspective[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2016,48(04):412.[doi:10.15986/j.1006-7930.2016.03.018]

备注/Memo

备注/Memo:
收稿日期:2012-05-04 修改稿日期:2013-07-29
基金项目:国家自然科学基金资助项目(51178386)
作者简介:闫瑞琦(1982-),男,博士,山东青岛人.主要从事土木工程建造与管理研究.
更新日期/Last Update: 2015-10-05