[1]刘 迅,王卓甫.基于FOWGA 算子的建设工程交易模式决策研究[J].西安建筑科技大学学报:自然科学版,2014,46(01):56-63,70.[doi:10.15986/j.1006-7930.2014.01.011]
 LIU Xun,WANG Zhuofu.Research on project delivery systems decision method based on FOWGA operator[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2014,46(01):56-63,70.[doi:10.15986/j.1006-7930.2014.01.011]
点击复制

基于FOWGA 算子的建设工程交易模式决策研究()
分享到:

西安建筑科技大学学报:自然科学版[ISSN:1006-7930/CN:61-1295/TU]

卷:
46
期数:
2014年01期
页码:
56-63,70
栏目:
出版日期:
2014-02-28

文章信息/Info

Title:
Research on project delivery systems decision method based on FOWGA operator
文章编号:
1006-7930(2014)01-0056-08
作者:
刘 迅1王卓甫2
(1. 江南大学环境与土木工程学院,江苏 无锡 214122;2. 河海大学工程管理研究所,江苏 南京 210098)
Author(s):
LIU Xun1 WANG Zhuofu2
(1. School of Environment and Civil Engineering, Jiangnan University, Wuxi 214122, China; 2. Institute of Construction Project Management, Hohai University, Nanjing 210098, China)
关键词:
工程交易模式有序加权平均算子三角模糊数决策方法
Keywords:
project delivery systems OWA operator triangular fuzzy number decision method
分类号:
F284
DOI:
10.15986/j.1006-7930.2014.01.011
文献标志码:
A
摘要:
选择恰当的交易模式是决定一个工程项目是否取得成功的关键因素之一.将模糊集理论引入到建设工程交易模式的决策中,通过利用模糊有序加权几何平均算子在一定程度上降低了判断信息集结过程中的丢失,提高了群决策的客观公正性的特点,提出了建设工程交易模式的决策方法和步骤,并对提出的工程交易模式选择方法进行演示.结果表明,该方法克服了当前工程建设交易模式选择方法中存在的主观性大的不足,较好地解决了决策专家信息在集结过程中的丢失问题,能够客观的反映工程交易模式的排序,提高群体决策的效率.
Abstract:
Appropriate transaction model is one of the key factors affecting a project success .This paper presents the fuzzy set theory. The judgment information loss can be reduced to a certain extent by using the fuzzy ordered weighted geometric averaging operator. Considering the characteristic of the operator that can improve the objectivity and fairness of group decision-making, this paper applies the operator into the decision methods of project delivery. Also, this paper proposes the method and procedure for the decision methods of project delivery and the mode selection method is demonstrated. Numeric examples are introduced to illustrate the application of the method, which has shown that the method can overcome the current drawback of subjectivity of the project delivery decision method, and reflect objectively the priority of the project delivery systems which help improve the efficiency of the group decision.

参考文献/References:

[1] 陈勇强, 焦俊双. 工程项目交易方式与支付方式对项目成本的影响[J]. 同济大学学报:自然科学版, 2011, 39(9): 1407- 1412.

CHEN Yongqiang, JIAO Junshuang. Influence of project delivery system and payment method on project cost performance [J]. Journal of Tongji University: Natural Science, 2011, 39(9):1407-1412.

[2] 陈勇强, 张雯. 工程项目交易方式生产效率比较研究[J]. 同济大学学报: 自然科学版, 2013, 41(2): 309-316.

CHEN Yongqiang, ZHANG Wen. Comparison of project production efficiency between DBB and DB delivery system on production frontier [J]. Journal of Tongji University : Natural Science, 2013, 41(02): 309-316.

[3] KENT D, BECERIK-GERBER B. Understanding construction industry experience and attitudes toward integrated project delivery[J]. Journal of Construction Engineering and Management, 2010, 136(8): 815-825.

[4] SWARUP L, KORKMAZ S, RILEY D. Project delivery metrics for sustainable, high-performance buildings[J]. Journal of Construction Engineering and Management, 2011, 137(12): 1043-1051.

[5] MOLLAOGLU-KORKMAZ S, SWARUP L, RILEY D. Delivering sustainable, high-performance buildings: influence of project delivery methods on integration and project outcomes[J]. Journal of Management in Engineering, 2013, 29(1): 71-78.

[6] ALHAZMI T, MCCAFFER R. Project procurement system selection model[J]. Journal of Construction Engineering and Management, 2000, 126(3): 176-184.

[7] Mahdi I M, Alreshaid K. Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP) [J]. International Journal of Project Management, 2005, 23(7): 564-572.

[8] MAFAKHERI F, DAI L, SLEZAK D, et al. Project delivery system selection under uncertainty: multicriteria multilevel decision aid model[J]. Journal of Management in Engineering, 2007, 23(4): 200-206.

[9] CHAN Caroline T W. Fuzzy procurement selection model for construction projects[J]. Construction Management and Economics, 2007, 25(6): 611-618.

[10] MOSTAFAVI A, KARAMOUZ M. Selecting appropriate project delivery system: fuzzy approach with risk analysis[J]. Journal of Construction Engineering and Management, 2010, 136(8): 923-930.

[11] KAUFRNAN A, GUPTA M M. Introduction to fuzzy arithmetic: theory and application[M]. New York: Van Nostrand Reinhold, 1985.

[12] 徐泽水. 一种 FOWG 算子及其在模糊 AHP 中的应用[J]. 系统工程与电子技术, 2002(7): 31-33, 36.

XU Zeshui. A fuzzy ordered weighted geometric operator and its application in fuzzy AHP [J]. Systems Engineering and Electronics, 2002(7): 31-33, 36.

[13] YAGER R R. On ordered weighted averaging aggregation operators in multicriteria decisionmaking[J]. IEEE Transactions on Systems, Man and Cybernetics, 1988;18(1): 183-190.

[14] HERRERA F, HERRERA-VIEDMA E, CHICLANA F. Multiperson decision-making based on multiplicative preference relations[J]. European Journal of Operational Research, 2001, 129(2): 372-385.

[15] 徐泽水. 模糊互补判断矩阵排序的一种算法[J]. 系统工程学报, 2001(4): 311-314.

XU Zeshui. Algorithm for priority of fuzzy complementary judgment matrix[J]. Journal of Systems Engineering, 2001(4): 311-314.

相似文献/References:

[1]王学通.中国现阶段总承包工程交易模式决策属性研究[J].西安建筑科技大学学报:自然科学版,2011,43(02):253.[doi:DOI :10.15986/j .1006-7930.2011.02.010]
 WANG X ue-tong.Decision-making attributes of lump-sum contracting project delivery methods of China at present[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(01):253.[doi:DOI :10.15986/j .1006-7930.2011.02.010]

备注/Memo

备注/Memo:
基金项目:国家社会科学基金项目(06BJY085);江南大学青年基金项目(JUSRP1031)
收稿日期:2013-09-30 修改稿日期:2014-01-25
作者简介:刘迅(1979-),男,讲师,博士,主要从事建设工程管理研究.E-mail:liuxun8127@163.com
更新日期/Last Update: 2015-10-05