[1]刘 科,赵 浩.黄土深基坑桩锚联合支护结构变形与稳定性分析[J].西安建筑科技大学学报:自然科学版,2014,46(04):513-517.[doi:10.15986/j.1006-7930.2014.04.010]
 LIU Ke,ZHAO Hao.Numerical analysis and stability analysis of a commercial plaza excavation engineering foundation in loess area[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2014,46(04):513-517.[doi:10.15986/j.1006-7930.2014.04.010]
点击复制

黄土深基坑桩锚联合支护结构变形与稳定性分析()
分享到:

西安建筑科技大学学报:自然科学版[ISSN:1006-7930/CN:61-1295/TU]

卷:
46
期数:
2014年04期
页码:
513-517
栏目:
出版日期:
2014-08-31

文章信息/Info

Title:
Numerical analysis and stability analysis of a commercial plaza excavation engineering foundation in loess area
文章编号:
1006-7930(2014)04-0513-05
作者:
刘 科赵 浩
(西北综合勘察设计研究院,陕西 西安 710003)
Author(s):
LIU Ke ZHAO Hao
(Northwest Research Institute of Engineering Investigations and DesignXian 710003China)
关键词:
深基坑桩锚联合支护数值分析稳定性
Keywords:
deep foundation pit combined pile-anchor supporting numerical analysis stability of foundation pit
分类号:
TU354
DOI:
10.15986/j.1006-7930.2014.04.010
文献标志码:
A
摘要:
为保证某临近地铁车站深基坑在施工过程中安全,采用数值模拟的方法分析了该基坑临近地铁车站一侧桩锚联合支 护结构在施工过程中的变形情况,并对其进行稳定性分析.分析表明:临近地铁车站一侧基坑支护结构最大侧移发生在离坑顶约7 m处,最大侧移为13.4 mm;最大地表沉降出现在距离基坑边约4m处,最大沉降量为8.81 mm;桩锚联合支护结构具有较好的稳定性,能够有效控制基坑在开挖过程中变形,工程深基坑的开挖没有影响到地铁车站安全.
Abstract:
In order to ensure safety of deep foundation pit nearby the subway station in the construction process, the deformation of pile-anchor retaining structure nearby the subway station in the construction process is analyzed by numerical simulation method, and its stability is also analyzed. The study showed that the maximum lateral displacement of pit-retaining structure occurs at about 7m away from the top of the pit, and maximum lateral displacement is 13.4mmAnd the maximum surface subsidence occurs at about 4m away from the pit, and the largest settlement is 8.81mm. the pile-anchor retaining structure has good stability, and can effectively control the deformation of the pit during excavation. This background engineering deep foundation excavation does not affect the safety of the subway station.

参考文献/References:

[1] 陈忠汉. 深基坑工程[M]. 2版. 北京: 机械工业出版社, 2002.

CHEN Zhonghan. Deep foundation[M]. 2nd ed. Beijing: China Machine Press, 2002.

[2] 陈肇元, 崔京浩. 土钉支护在基坑工程中的应用[M]. 2版. 北京: 中国建筑工业出版社, 2000.

CHEN Zhaoyuan, CUI Jinghao. Application of soil nail in foundation engineering[M]. 2nd ed. Beijing: China Architecture and Building Press, 2000.

[3] 宋二祥, 邱玥. 基坑复合土钉支护的有限元分析[J]. 岩土力学, 2001 , 22( 3): 241-244, 253.

SONG Erxiang, QIU Yue. Finite element analysis of composite soil nailing for excavation support[J]. Rock & Soil Mechanics, 2001, 22( 3) : 241-244,253.

[4] 樊胜军, 胡长明, 刘振江. 某深基坑施工期围护结构变形监测与数值模拟分析[J]. 施工技术, 2010, 40(350):82-84.

FAN Shengjun, HU Changming, LIU Zhenjiang. Deformation monitoring and numerical analysis of a deep foundation excavation support in construction[J]. Construction Technology, 2010, 40(350):82-84.

[5] 赵杰, 邵龙潭. 深基坑土钉支护的有限元数值模拟及稳定性分析[J]. 岩土力学, 2008, 29(4):983-988.

ZHAO Jie, SHAO Longtan. Numerical simulation and stability analysis of soil nailing support for deep foundation pit by FEM[J]. Rock and Soil Mechanics, 2008, 29(4):983-988.

[6] 孙凯, 许振刚, 刘庭金, 等. 深基坑的施工监测及其数值模拟分析[J]. 岩石力学与工程学报, 2004, 23(2):293-298.

SUN Kai, XU Zhengang, LIU Tingjin. Construction monitoring and numerical simulation foundation of a analysis pit[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(2):293-298.

[7] 胡长明, 黄双喜, 李文广. 基于遗传算法的土钉支护结构整体稳定性分析[J]. 西安建筑科技大学学报: 自然科学版, 2005,37(2):332-336.

HU Changmng, HUANG Shuangxi, LI Wenguang. Integral stability analysis of soil-nail braced structure based on genetic algorithms[J]. J. of Xi’an Univ. of Arch. & Tech: Natural Science Edition , 2005, 37(2):332-336.

[8] 蔡海波, 吴顺川, 周喻. 既有基坑延深开挖稳定性评价与支护方案确定[J]. 岩土力学, 2011, 32(11): 3306-3311, 3324.

CAI Haibo, WU Shunchuan, ZHOU Yu. Stability evaluation and supporting scheme for deepening excavation of existing foundation pit[J]. Rock and Soil Mechanics, 2011.32(11): 3306-3311,3324.

[9] 张雷, 文谦, 姚海明. 通过搜索破裂面法验算基坑的稳定性[J]. 地下空间与工程学报, 2005,1(6): 867-869,902.

ZHANG Lei, WEN Qian, YAO Haiming. Checking the stability of foundation pit by to rupture searching[J]. Chinese Journal of Underground Space and Engineering, 2005,1(6): 867-869,902.

[10] 高印立. 土钉加固边坡稳定性分析与计算[J]. 岩土工程技术,1998 (2): 9-11.

GAO Yinli. Stability analyze and calculation of nailed slope[J]. Geotechnical Engineering Technique,1998 (2): 9-11.

[11] Sivakumar Babu G L, Vikas Pratap Singh. Deformation and stability regression models for soil nail walls[C].Proceedings of the institution of civil engineers. Geotechnical engineering,2009,162(GE4):213-223.

[12] WANG Guihe, ZHANG Qinxi, HUANG Xuegang, et al. Analysis of monitoring and numerical simulation on anchor force of foundation pit[J]. Przeglad Elektro techniczny,2013,89(3b):216-220.

[13] ZHOU Y D, CHEUK C Y, Tham L G, et al. Numerical modeling of soil nails in loose fill slope under surcharge loading[J].Computers and Geotechnics, 2009, 36(5): 837- 850.

[14] FAN Chiacheng, LUO Jiunhimg. Numerical study on the optimum layout of soil-nailed slopes[J]. Computers and Geotechnics,2008, 35(4):585-599.

[15] Mostafa A Ismail, Mohamed A Shahin. Numerical modeling of granular pile-anchor foundations (GPAF) in reactive soils[J]. International Journal of Geotechnical Engineering, 2012,6(2):149-155.

备注/Memo

备注/Memo:
基金项目:陕西省科技攻关计划项目(2011k10-20);包头市科技计划项目(2011x1006)
收稿日期:2013-12-31 修改稿日期:2014-06-19
作者简介:刘科(1972- ),男,副总工程师,高级工程师,主要从事岩土工程设计与施工研究.E-mail:myjs2007@163.com
更新日期/Last Update: 2015-10-06