参考文献/References:
References
[1] 侯沂, 李世六, 王进. 塔式起重机钢结构疲劳寿命研究[J]. 土木建筑与环境工程, 2009(31): 24-30.
HOU Yi, LI Shiliu, WANG Jin, et al. Fatigue life of tower crane steel structure study[J]. Journal of Civil Engineering and Environmental Engineering. 2009(31): 24-30.
[2] 胡殿印, 王荣桥, 邓俊. 基于有限元方法的裂纹扩展寿命预测[J]. 机械强度. 2011, 31(2): 264-268.
HU Dianyin, WANG Rongqiao, Deng Jun. Based on the finite element method of crack propagation life prediction[J]. Journal of Mechanical Strength, 2011, 31(2): 264-268.
[3] CAO J J, YANG G J, PACKER J A, et al Crack modeling in FE analysis of circular tubular joints[J]. Engineering Fracture Mechanics, 1998, 61: 537-553.
[4] 胡健锋, 冯建军. 平头塔式起重机起重臂疲劳损伤寿命分析[J]. 设计研究, 2012(2): 54-56.
HU Jianfeng, FENG Jianjun. Flat head tower crane life of fatigue damage analysis[J]. Journal of Design Research, 2012(2): 54-56.
[5] 郦正能. 应用断裂力学[M]. 北京: 北京航空航天大学出版社, 2012: 195-197.
LI zhengneng. Fracture mechanics[M]. Beijing: Beijing University of Aeronautics And Astronautics Press, 2012: 195-197.
[6] 王兴路, 贺利乐. 焊接顺序对机械结构疲劳寿命影响研究[J]. 热加工工艺, 2013, 42(11): 180-182.
WANG Xinglu, HE Lile. Study on effect of welding sequence on fatigue life of mechanical structure[J]. Hot Working Technology, 2013, 42(11): 180-182.
[7] 张宏伟, 贺利乐. 塔式起重机起重臂疲劳裂纹扩展的机理分析[J]. 煤矿机械, 2012, 33(8): 112-114.
ZHANG Hongwei, HE Lile. The mechanism of tower crane jib fatigue crack propagation analysis[J]. Journal of Coal Mine Machinery, 2012, 33(8): 112-114.
[8] MOHAMMADI Soheil. Extended finite element method[M]. London: Blackwell Publishing Ltd, 2008.
[9] 陶炎文. 塔式起重机的疲劳寿命预测技术研究[D]. 西安: 西安建筑科技大学, 2012: 27-30.
TAO Yanwen. Tower crane’s fatigue life prediction technology research[D]. Xi’an: Xi’an Univ. of Arch. & Tech., 2012: 27-30.
[10] 包世洪. 塔式起重机的使用寿命和评估[J]. 建设机械技术与管理, 2008(5): 130-133.
BAO Shihong. The service life of tower crane and evaluation[J]. Construction Machinery Technology and Management, 2008(5): 130-133
相似文献/References:
[1]程站起,金建洲.任意梯度分布功能梯度板条平面裂纹分析[J].西安建筑科技大学学报:自然科学版,2011,43(05):741.[doi:DOI :10.15986/j .1006-7930.2011.05.024]
CHEN GZhan-qi,J IN J ian-z hou.Plane crack problem for functionally graded strip witharbitrarily distributed properties[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(05):741.[doi:DOI :10.15986/j .1006-7930.2011.05.024]
[2]曹彩芹,王 超,李诚诚.含裂纹的梭形薄壁圆柱壳结构应力强度因子分析研究[J].西安建筑科技大学学报:自然科学版,2016,48(05):691.[doi:10.15986/j.1006-7930.2016.05.012]
CAO Caiqin,WANG Chao,LI Chengcheng.Study on stress intensity factors of thin-walled shuttle cylinder structure with cracks[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2016,48(05):691.[doi:10.15986/j.1006-7930.2016.05.012]
[3]邵珠山,杨跃宗,米俊峰,等.水压爆破中波衰减规律及致裂机理的理论研究[J].西安建筑科技大学学报:自然科学版,2017,49(06):820.[doi:10.15986/j.1006-7930.2017.06.008]
SHAO Zhushan,YANG Yuezong,MI Junfeng,et al.Theoretical study on the wave attenuation law about water pressure blasting[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2017,49(05):820.[doi:10.15986/j.1006-7930.2017.06.008]