[1]张学钢,张丹锋,刘 可,等.隧道临近既有铁路桥桩基施工扰动影响的数值分析研究[J].西安建筑科技大学学报:自然科学版,2015,47(02):217-0223.[doi:10.15986/j.1006-7930.2015.02.012]
 ZHANG Xuegang,ZHANG Danfeng,LIU Ke,et al.Influence of the metro undercut excavation tunnel construction on existing railway bridge pile foundation[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(02):217-0223.[doi:10.15986/j.1006-7930.2015.02.012]
点击复制

隧道临近既有铁路桥桩基施工扰动影响的数值分析研究()
分享到:

西安建筑科技大学学报:自然科学版[ISSN:1006-7930/CN:61-1295/TU]

卷:
47
期数:
2015年02期
页码:
217-0223
栏目:
出版日期:
2015-04-28

文章信息/Info

Title:
Influence of the metro undercut excavation tunnel construction on existing railway bridge pile foundation
文章编号:
1006-7930(2015)02-0217-07
作者:
张学钢1张丹锋2刘 可2黄阿岗王1胡利平23
(1. 陕西铁路工程职业技术学院, 陕西 渭南 714000;2.西安建筑科技大学土木工程学院,陕西 西安 710055; 3. 中国铁建大桥工程局集团有限公司, 天津 300300 )
Author(s):
ZHANG Xuegang 1 ZHANG Danfeng 2 LIU Ke2 HUANG Egangwang 1HU Liping 23
(1. Shaanxi Railway Institute, Shaanxi Weinan 714000China2. School of Civil EngineeringXi’an Univof Arch.&Tech. Xi’an 710055China3. China Railway Construction Bridge Engineering Bureau Group Co. LTD. Tianji 300300China)
关键词:
地铁工程暗挖隧道既有桩基数值分析
Keywords:
metro engineering undercut excavation tunnel existing pile foundation numerical analysis
分类号:
TU31213; TU31211
DOI:
10.15986/j.1006-7930.2015.02.012
文献标志码:
A
摘要:
针对哈尔滨地铁1号线哈尔滨南站至农科院站区间暗挖隧道设计与施工方案,运用有限元方法,采用数值模拟地铁暗挖隧道上下台阶法施工,同时上行线超前下行线20 m,分析研究其对上部铁路桥桩基力学与位移影响变化规律.研究结果表明,地铁开挖使上部铁路桥桩基桩侧呈负摩阻力状态,并随开挖掌子面的临近,桩基轴力、侧表面摩阻力和位移都呈增大趋势,变化速率也逐渐加快;在垂直隧道轴线方向,随桩基与隧道距离的减小,受力和位移变化更复杂、明显;并且开挖上台阶和后施工的下行线都对桩基影响大.研究结果可为本工程提出相应重点控制区域和关键施工工序,并为后续类似工程提供一定理论依据.
Abstract:
Based on the Harbin Metro Line 1 Harbin South station and Nongkeyuan station section undercut excavation tunnel design and construction scheme was used, by the finite element method, Numerical simulation of metro undercut excavation tunnel up-down bench cut method construction, was also applied and upgoing line advancing downgoing line 20m was analysed. The variation law of mechanics and displacement of its influence on the upper railway bridge pile foundation was studied. The research results show that the pile flank surface frictional resistance of upper railway bridge pile foundation is negative state in metro excavation, and with the excavation tunnel face near, axial force, flank surface frictional resistance and displacement of pile foundation are increased and the rate of change has gradually accelerated. In the direction of the vertical axis of tunnel, force and displacement is more complex, obviously with decreasing pile foundation and tunnel distance; The pile foundation made a big difference by excavation of up-bench cut and later, construction of downgoing line. The research results can be used for the project and put forward the corresponding key control areas and key construction procedures, and provided certain theoretical basis for the later similar engineering

参考文献/References:

References
[1] 张志强,何川.地铁盾构隧道近接桩基的施工力学行为研究[J].铁道学报,2003,25(1):92-95.
ZHANG Zhiqiang,HE Chuan.Research on mechanicsbehaviour of a shield tunnel construction in metro adjacent to existiong pile foundation[J].Journal of The China Railway Society,2003, 25(1):92-95.
[2] 林刚,何川.盾构隧道基础上修建三连拱地铁车站结构参数研究[J].铁道学报,2003,25(6):93-98.
LIN Gang,HE Chuan.Study on structural parameters of the three-arch metro station built on the basis of shield tunnels[J].Journal of The China Railway Society, 2003, 25(6): 93-98.
[3] MORTON J D, KING K H.Effects of tunneling on the bearing capacity and settlement of piled foundations [C] ∥Proceedings of Tunnling79.London:IMM,1979:57-68.
[4] LOGANATHAN N. Centrifuge model testing of tunne lling-induced ground and pile deformations[J]. Geotechnique, 2000,50(3):283-294
[5] CHEN L T. Pile responses caused by tunnelling [J]. Journal of Geotechnical and Geoen viron mental Engineering, ASCE, 1999, 125(3): 207-215.
[6] LEE T K.Effects of advancing open face tunneling on an existing loaded pile[J]. Journal of Geotechnical and Geo- environmental Engineering, ASCE,2005,131(2):193-201.
[7] 张云军.隧道开挖对邻近桩基影响的二维数值分析[J].地下空间与工程学报,2005,1(6):832-836.
ZHANG Yunjun. Two-dimensional numerical analysis of adjacent pile foundation responses caused by tunneling[J]. Chinese Journal of Underground Space and Engineering, 2005,1(6):832-836.
[8] 黄茂松.浅埋隧道施工对建筑物桩基的影响分析[J].岩土力学,2006,27(8):1379-1383.HUANG Maosong.Analysis of pile responses caused by tunneling[J].Rock and Soil Mechanics, 2006, 27(8): 1379 -1383.
[9] 杨晓杰.地铁隧道近距穿越施工对桩基承载力的影响研究[J].岩石力学与工程学报,2006,25(6):1290-1295.
YANG Xiaojie.Study on effect of metro tunnelling on carrying capacity of pile foundation[J].Chinese Journal ofRock Mechanics and Engineering, 2006, 25(6): 1290-1295.
[10] 章荣军.基于p-y曲线分析隧道开挖对邻近单桩的影响 [J].岩土工程学报,2010,32(12):1837-1845.
ZHANG Rongjun. Response of adjacent single pile due to tunneling based on p-y curve[J].Chinese Journal ofGeotechnical Engineering,2010,32(12):1837-1845.
[11] Itasca Consulting Group.User’s manual of fast lagrangian analysis of continua in 3 dimensions[M].2nd ed.Itasca Consulting Group,1997:100-150.
[12] 王述红,唐春安.数值试验在岩石力学实验教学中的应用[J].实验技术与管理,2003,20(6):140-143.
WANG Shuhong,TANG Chuna.Application of numerical experimentation on rock mechanics experiment teaching[J].Experimental Technology and Management, 2003, 20(6):140-143.
[13] 宋战平,綦彦波.岩溶隧道施工关键技术及工程应用研究[M].西安:陕西科学技术出版社,2013:12-13.
SONG Zhanping,QI Yanbo.Research on the key technology and engineering application of the karst tunnel construction under complex geology[M]. Xi’an: Shanxi Science and Technology Press,2013:12-13.
[14] TB10003-2005.铁路隧道设计规范[S].北京:中 国铁道出版社,2005.
TB10003-2005.Code for design on tunnel of railway[S]. Beijing: China Railway Publishing House,2005.
[15] JGJ94-2008,建筑桩基技术规范[S].北京: 中国建筑工业出版社,2008.
JGJ94-2008. Technical Code for Building Pile Foundations[S]. Beijing: China Architecture & Building Press,2008.
[16] 李围,何川.盾构隧道基础上修建三条平行隧道地铁车站的施工力学行为研究[J].现代隧道技术,2004,41(1):5-9.

相似文献/References:

[1]卫守峰.黄土地区地铁竖井转横通暗挖施工稳定性分析[J].西安建筑科技大学学报:自然科学版,2020,52(03):366.[doi:10.15986/j.1006-7930.2020.03.009]
 WEI Shoufeng.Optimization analysis of tunnel construction methods through cross aisle from subway shaft based on numerical test analysis in loess stratum[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2020,52(02):366.[doi:10.15986/j.1006-7930.2020.03.009]

备注/Memo

备注/Memo:
收稿日期:2014-09-10 修改稿日期:2015-04-15
基金项目:陕西省教育厅2013年科学研究计划(自然科学专项)项目(2013JK0990
张学钢(1976-),男,副教授,主要从事隧道与地下工程方面的教学和科研工作. E-mail:18191277018@163.com