[1]李俊平,王晓光,赵兴明,等.某铅锌矿采空区处理与卸压开采方案的数值模拟[J].西安建筑科技大学学报:自然版,2015,47(05):745-751,759.[doi:DOI: 10.15986/j.1006-7930.2015.0 5.024]
 LI Junping,WANG Xiaoguang,ZHAO Xingming,et al.Numerical simulation of mining scheme disposing abandoned-stope and relieving mining pressure in a certain lead & zinc mine[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(05):745-751,759.[doi:DOI: 10.15986/j.1006-7930.2015.0 5.024]
点击复制

某铅锌矿采空区处理与卸压开采方案的数值模拟()
分享到:

西安建筑科技大学学报:自然版[ISSN:1006-7930/CN:61-1295/TU]

卷:
47
期数:
2015年05期
页码:
745-751,759
栏目:
出版日期:
2015-10-29

文章信息/Info

Title:
Numerical simulation of mining scheme disposing abandoned-stope and relieving mining pressure in a certain lead & zinc mine
文章编号:
1006-7930(2015)05-0745-07
作者:
李俊平1王晓光1赵兴明2杨明春3
(1. 西安建筑科技大学材料与矿资学院,陕西 西安 710055;2. 白银有色集团股份有限公司厂坝铅锌矿,甘肃 成县742504; 3. 四川机电职业技术学院,四川 攀枝花 617000 )
Author(s):
LI Junping 1 WANG Xiaoguang 1 ZHAO Xingming 2 YANG Mingchun3
(1. School of Materials and Mineral Resources , Xian Univ. of Arch . & Tech ., Xi an, 710055, China; 2. Changba lead & zinc mine, Baiyin Nonferrous group limited liability company , Chengxian 742504, China; 3. Sichuan Electromechanical Institute of Vocation and Technology, Panzhihua 617000, China )
关键词:
采矿工程冲击地压采空区处理卸压开采隔断开采数值模拟
Keywords:
Mining engineering rock burst abandoned /forsaken stope disposal relief mining pressure partition mining numerical simulation
分类号:
TD324
DOI:
DOI: 10.15986/j.1006-7930.2015.0 5.024
文献标志码:
A
摘要:
为了经济、安全地处理某铅锌矿900 m水平以上的采空区并回收矿柱,同时避免深部开采时发生岩爆,提出了急倾斜矿体开采的采空区处理与卸压开采方法,并利用数值模拟软件ANSYS和FLAC3D确定了此方法的施工参数,并对比了两个软件的计算结论.研究表明:ANSYS和FLAC3D得出的结论基本一致;下盘脉外离采空区边缘10 m掘进巷道时,上盘脉外卸压施工巷道离采空区边缘的水平距离不超过20 m;隔断开采的深度不超过20 m;必须从上、下盘脉外巷道同时向采空区围岩实施V型松动爆破;可只在上盘巷道底板进行隔断开采.此采空区处理与卸压开采方法技术合理、经济可行、简便适用;它是一种采空区处理的联合法,适合地表允许岩体移动的急倾斜、厚度大矿体的采空区处理与卸压开采;它能够用工程爆破这一种手段实现采空区处理、应力向有利于安全生产的方向转移等多种目的.
Abstract:
For the sake of safety, and economy in dispos ition of the abandoned-stope and extract pillar above 900m level of a lead & zinc mine, while avoiding the deep mining rock burst, a new method disposing steep abandoned stope and relieving mining pressure was put forward, and it’s construction parameters were determined by ANSYS and FLAC3D to dispose abandoned stope and unload mining stress. At the same time, conclusions calculated by the two softwares were compar ed. Results showed that ANSYS and FLAC3D arrived at the same conclusion s, and that the horizontal distance must be 20 m from the edge of the forsaken-stope to tunnel outside the hanging side if the horizontal distance is 10 m from the edge of the abandoned stope to tunnel outside the heading side. Moreover, the partition mining depth is not more than 20 m below the floor plate of tunnels. From the tunnel outside hanging side and footwall of the veins to the abandoned stope, v-shaped loosening blasting must be implemented simultaneously in forsaken stope surrounding rock. Furthermore, the partition mining can only been carried out on the tunnel bottom plate in the hanging wall . The new method for disposing the steep abandoned stope & relieving mining pressure applied is characteristic of advanced nature, which is surely expected to bring about reasonable economy, confident safety and great economic benefits . Moreover, the new method is a kind of combined method disposing forsaken stope, and it is suitable for steep, big and thickness ore-body to dispose abandoned stope and relief mining pressure when the surface movement and subsidence is allowed. In applying the new method to dispose forsaken stope, the stress of surrounding rock will transfer toward the direction of being advantageous to safety production and other purposes by means of engineering blasting

参考文献/References:

References

[1] 尹贤刚, 李庶林, 唐海燕, 等. 厂坝铅锌矿岩石物理力学性质测试研究[J]. 矿业研究与开发, 2003, 23(5): 12-13, 16.

YIN Xiangang, LI Shulin, TANG Haiyan, et al .The tests and studies of the physical mechanical properties of the rocks from Changba Lead-Zinc Mine[J]. Mining R esearch and Development, 2003, 23(5): 12-13, 16.

[2] 吴永博, 高谦, 杨志强, 等. 厂坝露天矿边坡工程地质研究与岩体力学参数预测[J]. 工程地质学报, 2007, 15(S1):304-311.

WU Yongbo, GAO Qian, YANG Zhiqiang, et al .Engineering geologic research and prediction of mechanical Parameters of rock-masses foe Changba Open Mine[J]. Journal of Engineering Geology, 2007, 15(S1): 304-311.

[3] 闫长斌, 徐国元. 对Hoek-Brown公式的改进及其工程应用[J]. 岩石力学与工程学报, 2005, 24(22): 4030-4035.

YAN Changbin, XU Guoyuan .Modification of Hoek- Brown expressions and its application to engineering[J]. Chinese?Journal?of?Rock?Mechanics?and?Engineering, 2005, 24(22): 4030-4035.

[4] 李俊平. 缓倾斜采空场处理新方法及采场地压控制研究[D]. 北京: 北京理工大学, 2003.

LI Junping .Study of the new method disposing gently inclined abandoned stope and ground pressure control at the stope[D]. Beijing: Beijing Institute of Technology, 2003.

[5] 李俊平, 赵永平, 王二军. 采空区处理的理论与实践[M]. 北京:冶金工业出版社, 2012.

LI Junping, ZHAO Yongping, WANG Erjun. Method and practice disposing abandoned stope[M]. Beijing: Metallurgical Industry Press, 2012.

[6] 李俊平, 肖旭峰, 冯长根. 采空区处理方法研究进展[J]. 中国安全科学学报, 2012, 22(3): 48-54.

LI Junping, XIAO Xufeng, FENG Changgen. Progress in developing methods for dealing with forsaken stope[J]. China Safety Science Journal, 2012, 22(3): 48-54.

[7] 李俊平, 肖旭峰, 连民杰, 等. “V型”切槽顶板闭合方法研究[J]. 安全与环境学报, 2012, 12(5): 219-222.
LI Junping, XIAO Xufeng, LIAN Mingjie, et al. On the
roof closure method resulting from the “V” –shaped
top-grooving[J]. Journal of Safety and Environment,
2012, 12(5): 219-222.
[8] 李俊平, 寇坤, 刘武团 .七角井铁矿矿柱回收与采空区
处理方案[J]. 东北大学学报: 自然科学版, 2013,
34(S1):137-143.
LI Junping, KOU Kun, LIU Wutuan .Methods of
extracting pillars and disposing abandoned-stope in
Qijiaojing Iron-Mine[J]. Journal of Northeastern University:
Natural Science, 2013, 34(S1), 137-143.
[9] KOVARI K. Erroneous concepts behind the New
Austrian tunnelling method[J]. Tunnels and Tunnelling,
1994, 26(11): 38-42.
[10] 解世俊. 卸压开采[J]. 矿山技术, 1992, (2): 19–21
XIE Shijun. The pressure-relief mining[J]. Mining Technology,
1992, (2): 19−21.
[11] 王御宇, 李学锋, 李向东. 深部高应力区卸压开采研
究[J]. 矿冶工程, 25(4):4-7.
WANG Yuyu, LI Xuefeng, LI Xiangdong. Study on
stress-relief measures in high-stress zone of deep
deposit[J]. Mining and Metallurgical Engineering, 2005,
25(4): 4-7.
[12] 夏祥, 石永强, 李海波, 等. 岩体单孔及群孔齐发爆破
爆炸荷载数值分析[J]. 岩石力学工程学报, 2007,
26(Sup1):3390-3396.
XIA Xiang, SHI Yongqiang, LI Haibo, et al. Numerical
Analysis of Explosive Load of Single-hole Blasting and
Multiple-hole Simultaneous Blasting in Rockmass[J].
Chinese Journal of Rock Mechanics and Engineering,
2007, 26(Sup1): 3390-3396.
[13] 熊祖强, 贺怀建. 冲击地压应力状态及卸压治理数值
模拟[J]. 采矿与安全工程学报, 2006, 23(4): 489-493.
XIONG Zuqiang, HE Huaijian. Numerical Simulation of
Rock Burst Stress and its Control by Stress-relief[J].
Journal of Mining and Safety Engineering, 2006, 23(4):
489-493.
[14] 伍法权.统计岩体力学原理[M].武汉:中国地质大学出
版社, 1993.
WU Faquan .Principle of statistical mechanics of rock
mass[M]. Wuhan: China University of Geosciences press,
1993.
[15] 李俊平, 王石, 柳才旺, 等. 小秦岭井巷工程岩爆控制
试验[J]. 科技导报, 2013, 31(1): 48-51.
LI Junping, WANG Shi, LIU Caiwang, et al. Field tests
on rock burst control of shafts and tunneling engineering
in Xiaoqinling Mountain[J]. Science and Technology
Review, 2013, 31(1): 48-51

相似文献/References:

[1]李俊平,王红星,王晓光,等.岩爆倾向岩石巷帮钻孔爆破卸压的静态模拟[J].西安建筑科技大学学报:自然版,2015,47(01):97.[doi:10.15986/j.1006-7930.2015.01.019]
 LI Junping,WANG Hongxing,WANG Xiaoguang,et al.Static numerical simulation of drilling & blasting pressure relief of burst-prone rocks in tunnel wall[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(05):97.[doi:10.15986/j.1006-7930.2015.01.019]

备注/Memo

备注/Memo:
收稿日期:2014-07-07 修改稿日期:2015-10-10
基金项目:国家自然科学基金项目(51244006);西安建筑科技大学重点培育学科建设基金项目(XK2012005)
作者简介:李俊平(1969.5-),男,博士,教授,主要从事矿山岩石力学的教学与科研工作.E-mail: junpingli@163.com
更新日期/Last Update: 2015-12-14