参考文献/References:
References
[1] 尹贤刚, 李庶林, 唐海燕, 等. 厂坝铅锌矿岩石物理力学性质测试研究[J]. 矿业研究与开发, 2003, 23(5): 12-13, 16.
YIN Xiangang, LI Shulin, TANG Haiyan, et al .The tests and studies of the physical mechanical properties of the rocks from Changba Lead-Zinc Mine[J]. Mining R esearch and Development, 2003, 23(5): 12-13, 16.
[2] 吴永博, 高谦, 杨志强, 等. 厂坝露天矿边坡工程地质研究与岩体力学参数预测[J]. 工程地质学报, 2007, 15(S1):304-311.
WU Yongbo, GAO Qian, YANG Zhiqiang, et al .Engineering geologic research and prediction of mechanical Parameters of rock-masses foe Changba Open Mine[J]. Journal of Engineering Geology, 2007, 15(S1): 304-311.
[3] 闫长斌, 徐国元. 对Hoek-Brown公式的改进及其工程应用[J]. 岩石力学与工程学报, 2005, 24(22): 4030-4035.
YAN Changbin, XU Guoyuan .Modification of Hoek- Brown expressions and its application to engineering[J]. Chinese?Journal?of?Rock?Mechanics?and?Engineering, 2005, 24(22): 4030-4035.
[4] 李俊平. 缓倾斜采空场处理新方法及采场地压控制研究[D]. 北京: 北京理工大学, 2003.
LI Junping .Study of the new method disposing gently inclined abandoned stope and ground pressure control at the stope[D]. Beijing: Beijing Institute of Technology, 2003.
[5] 李俊平, 赵永平, 王二军. 采空区处理的理论与实践[M]. 北京:冶金工业出版社, 2012.
LI Junping, ZHAO Yongping, WANG Erjun. Method and practice disposing abandoned stope[M]. Beijing: Metallurgical Industry Press, 2012.
[6] 李俊平, 肖旭峰, 冯长根. 采空区处理方法研究进展[J]. 中国安全科学学报, 2012, 22(3): 48-54.
LI Junping, XIAO Xufeng, FENG Changgen. Progress in developing methods for dealing with forsaken stope[J]. China Safety Science Journal, 2012, 22(3): 48-54.
[7] 李俊平, 肖旭峰, 连民杰, 等. “V型”切槽顶板闭合方法研究[J]. 安全与环境学报, 2012, 12(5): 219-222.
LI Junping, XIAO Xufeng, LIAN Mingjie, et al. On the
roof closure method resulting from the “V” –shaped
top-grooving[J]. Journal of Safety and Environment,
2012, 12(5): 219-222.
[8] 李俊平, 寇坤, 刘武团 .七角井铁矿矿柱回收与采空区
处理方案[J]. 东北大学学报: 自然科学版, 2013,
34(S1):137-143.
LI Junping, KOU Kun, LIU Wutuan .Methods of
extracting pillars and disposing abandoned-stope in
Qijiaojing Iron-Mine[J]. Journal of Northeastern University:
Natural Science, 2013, 34(S1), 137-143.
[9] KOVARI K. Erroneous concepts behind the New
Austrian tunnelling method[J]. Tunnels and Tunnelling,
1994, 26(11): 38-42.
[10] 解世俊. 卸压开采[J]. 矿山技术, 1992, (2): 19–21
XIE Shijun. The pressure-relief mining[J]. Mining Technology,
1992, (2): 19−21.
[11] 王御宇, 李学锋, 李向东. 深部高应力区卸压开采研
究[J]. 矿冶工程, 25(4):4-7.
WANG Yuyu, LI Xuefeng, LI Xiangdong. Study on
stress-relief measures in high-stress zone of deep
deposit[J]. Mining and Metallurgical Engineering, 2005,
25(4): 4-7.
[12] 夏祥, 石永强, 李海波, 等. 岩体单孔及群孔齐发爆破
爆炸荷载数值分析[J]. 岩石力学工程学报, 2007,
26(Sup1):3390-3396.
XIA Xiang, SHI Yongqiang, LI Haibo, et al. Numerical
Analysis of Explosive Load of Single-hole Blasting and
Multiple-hole Simultaneous Blasting in Rockmass[J].
Chinese Journal of Rock Mechanics and Engineering,
2007, 26(Sup1): 3390-3396.
[13] 熊祖强, 贺怀建. 冲击地压应力状态及卸压治理数值
模拟[J]. 采矿与安全工程学报, 2006, 23(4): 489-493.
XIONG Zuqiang, HE Huaijian. Numerical Simulation of
Rock Burst Stress and its Control by Stress-relief[J].
Journal of Mining and Safety Engineering, 2006, 23(4):
489-493.
[14] 伍法权.统计岩体力学原理[M].武汉:中国地质大学出
版社, 1993.
WU Faquan .Principle of statistical mechanics of rock
mass[M]. Wuhan: China University of Geosciences press,
1993.
[15] 李俊平, 王石, 柳才旺, 等. 小秦岭井巷工程岩爆控制
试验[J]. 科技导报, 2013, 31(1): 48-51.
LI Junping, WANG Shi, LIU Caiwang, et al. Field tests
on rock burst control of shafts and tunneling engineering
in Xiaoqinling Mountain[J]. Science and Technology
Review, 2013, 31(1): 48-51