[1]段旭,董琪,门玉明,等.黄土挖填方场地中桩筏基础受力变形状态研究[J].西安建筑科技大学学报(自然科学版),2018,50(03):373-0380.[doi:10.15986/j.1006-7930.2018.03.010]
 DUAN Xu,DONG Qi,MEN Yuming,et al.Study on mechanism of deformation and destruction for piled raft foundation in loess areas with excavatedfilled[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2018,50(03):373-0380.[doi:10.15986/j.1006-7930.2018.03.010]
点击复制

黄土挖填方场地中桩筏基础受力变形状态研究

()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
50
期数:
2018年03期
页码:
373-0380
栏目:
出版日期:
2018-06-30

文章信息/Info

Title:
Study on mechanism of deformation and destruction for piled raft foundation in loess areas with excavatedfilled
文章编号:
1006-7930(2018)03-0373-08
作者:
段旭1董琪2门玉明3叶万军1李秉书4
(1.西安科技大学 建筑与土木工程学院,陕西 西安710054;2.陕西科技控股集团有限责任公司,陕西 西安710003;3.长安大学 地质工程与测绘学院,陕西 西安710054;4. 武警黄金部队第五支队,陕西 西安710100)
Author(s):
DUAN Xu1 DONG Qi2 MEN Yuming3 YE Wanjun1 LI Bingshu4
(1.School of Architectural and Civil Engineering,University of Science and Technology, Xi′an 710054, China; 2.Shaanxi Science & Technology Holding Group Co.,Ltd., Xi′an 710003, China; 3.College of Geological Engineering and Geomatics, Chang′an University, Xi′an 710054, China; 4.No.5 Gold Geological Part of PAP, Xi′an 710100, China)
关键词:
黄土挖填方场地桩筏基础模型试验不均匀沉降
Keywords:
Loess areas with excavatedfilled piledraft foundation model test uneven settlement
分类号:
TU473
DOI:
10.15986/j.1006-7930.2018.03.010
文献标志码:
A
摘要:
利用自制模型箱,以延安新区黄土挖填方场地中的桩筏基础为原型,开展了相似比为1∶5的模型试验.通过上部加载模拟上部结构荷载,对桩体纵筋、筏板表面的应变数据以及桩间土体的土压力数据进行采集分析.试验结果表明,随着上部荷载的增大,地基的不均匀沉降导致了基础产生向填方区的偏转,桩体发生明显的弯曲变形,不同部位桩体的应力集中位置以及桩土相互作用状态有明显区别.在模型试验的基础上探讨了挖填结合地基上桩土筏共同作用的计算式.基础设计时应避免桩体全段位于填方地基中,基桩底部应深入稳定原始土体,并通过对填方地基的预处理提高桩周土体的摩擦力,同时应考虑各桩轴向应变数值以及峰值位置的差异,有针对性地考虑桩体的承载能力.
Abstract:
In this paper, a self-made model box was used to prototype the pile-raft foundation in the loess excavation and filling site in Yan′an New Area, and a model test with a similar ratio of 1:5 was carried out. The loading of the upper structure was simulated by the artificial loading, and the strain data of the longitudinal reinforcement of the piles, the surface of the raft and the soil pressure data of the soil between the piles were collected The results show that with the increase of the upper load, the uneven settlement of the foundation leads to the deflection of the foundation to the fill area, the pile body undergoes significant bending deformation. There are obvious differences in stress concentration position and pilesoil interaction status of piles at different locations. Based on the model test, the calculation formulas for pile-soil-turbulence interaction on excavation and filling foundations are discussed. The piles should be avoided completely in the fill foundation and the bottom of the pile should be deepened to stabilize the original soil, and the friction of the soil around the pile should be improved through the pretreatment of the fill foundation. The axial strain of each pile should also be considered. The difference between the numerical value and the peak position, with a specific consideration of the bearing capacity of the pile.

参考文献/References:

[1]薛凯元,巨玉文,王文正,等. 地形对黄土高 填方路堤沉降的影响 [J].科学技与工程, 2014,14(32): 282-285.

XUE Kaiyuan, JU Yuwen, WANG Wenzheng, et al. Effent of terrain on the settloement of high fill embankment in loess[J]. Science Technology and Engineering, 2014, 14(32):282-285.
[2]朱才辉,李宁,刘明振,等. 吕梁机场黄土高 填方地基工后沉降时空规律分析[J].岩土 工程学报,2013,(2):293-301.
ZHU Caihui, LI Ning, LIU Mingzhen, et al. Spatiotemporal laws of postconstructionsettlement of loessfilled foundation of Lüliang Airport[J]. Chinese Journal of Geotechnical Engineering, 2013, (2): 293-301.
[3]ATHANASIU C, SIMONSEN A S, SOEREIDE O K, et al Elasticand creep settlements ofrock fills [C]// Proc 16th Int Conf Soil Mech Geotech Eng Osaka:Balkema,2005:1837-1843.
[4]SORIANO A, SANCHEZ F J. Settlements of railroad high embankments [C]//Geotech Eng for Transportation in FrastructureAmsterdam:Balkema, 1999: 1885-1890.
[5]CHARLES J A, SKINNER H DCompressibility of foundation fills[J].Proc of Instit of Civil Eng, GeotechEng, 2001, 149(3): 145-157.
[6]CHARLES J A. Laboratory compression tests and the deformation of rock fill structures[C]//Advances in Rock fill Structures (ed EMaranha das Neves),Proc of NATO Advanced Science London:Kluwer,1990: 53-72.
[7]董琪,段旭,李阳,等. 黄土沟壑高填方 工后12个月沉降变形规律研究[J].煤田 地质与勘探,2016,(2):89-95,105.
DONG Qi, DUAN Xu, LI Yang, et al. High embankment settlement deformation law research after 12 months in gully region of loess[J].Coal Geology & Exploration,2016,(2):89-95,105.
[8]高日华. 桩侧负摩阻土层对桩基静载试验结果的影响[J]. 水电与新能源, 2003(3): 42-64.
GAO RihuaInfluence of negative pile frictionto result of pile foundation test under static loads[J]. Hydropower and New Energy, 2003 (3): 42-64.
[9]袁灯平, 黄宏伟, 程泽坤. 软土地桩基侧负摩阻力研究进展初探[J]. 土木工程学报, 2006, 39(2): 50-60.
YUAN Dengping, HUANG Hongwei, CHENG Zekun. Research progress ofnegative skin friction on piles in soft soil[J].China Civil Engineering Journal,2006,39(2),5384
[10]INOUE Y, TAMAOKI K, OGAI T. Settlement of building due to pile downdrag [A]//Proceedings 9th International Conference on Soil Mechanics and Foundation Engineering[C]Tokyo: 1977: 561-564.
[11]徐欣. 黄土梁峁地区建筑基础型式选用研究[D].西安:长安大学, 2008.
XU Xin. The research in selection of the forms of building foundation in loess ridge [D].Xi′an: Chang′an University, 2008.
[12]张武. 高层建筑桩筏基础模型试验研究[D].北 京:中国建筑科学研究院,2002.
ZHANG Wu. Model test of the tall building piled raft foundation[D]. Beijing: China Academy of Building Research, 2002.
[13]王幼青,张克绪,朱腾明. 桩-承台地基土相 互作用试验研究[J].哈尔滨建筑大学学报, 199 8, 31(2): 31-37.
WANG Youqing, ZHANG Kexu, ZHU Tengming. The test research on the interaction in pile-cap-foundation soil[J]. Journal of Harbin University of Civil Engineering & Architecture, 1998, 31(2): 31-37.
[14]宰金珉. 桩土明确分担荷载的复合桩基及其 设计方法[J]. 建筑结构学报, 1995, 16(4): 66-74.
ZAI Jinmin. Composite pile foundation with distinct load distribution in piles and soils and its design method[J]. Chinese Journal of Building Structures, 1995, 16(4): 66-74.
[15]宰金珉, 蒋刚, 王旭东, 等. 极限荷载下桩筏基础共同作用性状的室内模型 试验研究[J]. 岩土工程学报,2007,29(11):1597-1603.
ZAI Jinmin, JIANG Gang, WANG Xudong, et al. Model test on pileraft foundation interaction under ultimate load[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(11): 1597-1603.
[16]刘开国. 不均匀布桩的桩筏基础分析[J]. 土木工程学报,2004,(12):67-69.
LIU Kaiguo. Analysis of piled raft foundationrested on ununiform distributed piles[J]. China Civil Engineering Journal, 2004, (12): 67-69.
[17]杨俊杰. 相似理论与结构模型试验[M]. 武汉: 武汉理工大学, 2005.
YANG Junjie. Similar to the Theory StructureModel Test [M]. Wuhan:Wuhan University of Technology Press, 2015.

备注/Memo

备注/Memo:
收稿日期:2017-05-02修改稿日期:2018-05-29
基金项目:国家自然科学基金面上项目(41672305);陕西省重点科技创新团队计划项目(2016KCT-13);陕西省重点项目(2017ZDXM-SF-078)
第一作者:段旭(1991-),男,博士生,主要从事土与结构物相互作用方向的研究.E-mail:duanxutim@163.com
更新日期/Last Update: 2018-09-11