[1]亓霞,柯永建,王守清. 基于案例的中国PPP项目的主要风险因素分析[J]. 中国软科学,2009(5): 107-113.QI Xia, KE Yongjian, WANG Shouqing. Analysis on critical risk factors causing the failures of China′s PPP projects[J]. China Soft Science, 2009(5): 107-113.
[2]赵晔. 我国PPP项目失败案例分析及风险防范[J]. 地方财政研究, 2015(6): 52-56.
ZHAO Ye. Case analysis and risk prevention of PPP project failure in China[J]. Sub National Fiscal Research, 2015(6): 52-56.
[3]孙荣霞. 基于霍尔三维结构的公共基础设施PPP项目融资模式的风险研究[J]. 经济经纬, 2010(6): 142-146.
SUN Rongxia. A research on the risk of public infrastructure PPP projects financing model based on hall′s three dimensional structure[J]. Economic Survey, 2010(6): 142-146.
[4]张星,孙建平,李胜. BOT项目风险的模糊综合评价[J]. 上海经济研究, 2004(10): 69-73.
ZHANG Xing, SUN Jianping, LI Sheng. Fuzzy comprehensive evaluation of BOT project risk[J]. Shanghai Economic Review, 2004(10): 69-73.
[5]段世霞,刘红叶. PPP项目的利益分配两阶段模型[J]. 财会月刊, 2015(28): 7-10.
DUAN Shixia, LIU Hongye. Two stage model of benefit distribution in PPP project[J]. Finance and Accounting Monthly, 2015(28): 7-10.
[6]何天翔,张云宁, 施陆燕,等. 基于利益相关者满意的PPP项目利益相关者分配研究[J]. 土木工程与管理学报, 2015,32(3): 66-71.
HE Tianxiang, ZHANG Yunning, SHI Luyan, et al. Allocation research of stakeholders based on stakeholder satisfaction with the PPP project benefits[J]. Journal of Civil Engineering and Management 2015, 32(3): 66-71.
[7]胡丽,张卫国,叶晓甦. 基于SHAPELY修正的PPP项目利益分配模型研究[J]. 管理工程学报, 2011,25(2): 149-154.
HU Li, ZHANG Weiguo, YE Xiaosu. Profit allocation of PPP model based on the revised SHAPELY[J]. Journal of Industrial Engineering/Engineering Management, 2011,25(2): 149-154.
[8]叶晓甦,吴书霞,单雪芹. 我国PPP项目合作中的利益关系及分配方式研究[J]. 科技进步与对策, 2010,27(19): 36-39.
YE Xiaosu, WU Shuxia, SHAN Xueqin. Research on the interest relationship and distribution mode of PPP project cooperation in China[J]. Science & Technology Progress and Policy, 2010,27(19): 36-39.
[9]王林秀,刘登,马强. PPP项目核心利益相关者的利益分配策略研究[J]. 商业时代, 2011(11): 99-100.
WANG Linxiu, LIU Deng, MA Qiang. Research on the benefit allocation strategy of core stakeholders in PPP project[J]. Journal of Commercial Economics, 2011(11): 99-100.
[10]徐霞,郑志林. 公私合作制(PPP)模式下的利益分配问题探讨[J]. 城市发展研究, 2009,16(3): 104-106.
XU Xia, ZHENG Zhilin. Benefit assignment in PPP[J]. Urban Studies, 2009,16(3): 104-106.
[11]武乾,王冲,郑德志,等. 基于主成分分析的西安旧工业建筑再利用风险因素研究[J]. 工业建筑, 2014,44(10): 61-63, 90.
WU Qian, WANG Chong, ZHENG Dezhi, et al. Research on risk factors of reuse of old industrial buildings in Xi′an based on principal component analysis[J]. Industrial Construction, 2014,44(10): 61-63, 90.
[12]武乾,宗一帆. 旧工业建筑改造为创意产业园后的潜在危机及应对策略[J]. 工业安全与环保, 2016,42(8): 48-50, 83.
WU Qian, ZONG Yifan. The potential crisis and coping strategies of the old industrial building transform into creative industrial park[J]. Industrial Safety and Environmental Protection, 2016,42(8): 48-50,83.
[13]陈宏辉. 企业利益相关者的利益要求:理论与实证研究[M]. 北京:经济管理出版社, 2004.
CHEN Honghui. The interests of the stakeholders: theoretical and empirical study[M]. Beijing: Economic Management Press, 2004.
[14]邓汉慧,张子刚. 企业核心利益相关者共同治理模式[J]. 科研管理, 2006(1): 85-90.
DENG Hanhui, ZHANG Zigang The model on the core stakeholder corporate governance[J]. Science Research Management, 2006(1): 85-90.