参考文献/References:
References
[1]朱占波,金志刚.海外EPC总承包项目工期影响因素分析及对策建议[J].项目管理技术,2017(9):73-77.
ZHU Zhanbo, JIN Zhigang. Analysis of factors influencing the construction period of overseas EPC general contract project and suggestions [J]. Project Management Techniques, 2017(09): 73-77.
[2]方成.浅谈国内企业在海外IPP模式下的项目风险控制[J].中国集体经济,2017(22):41-42.
FANG Cheng. Discussion of the project risk control of domestic enterprises under overseas IPP model [J]. China Collective Economy, 2017(22): 41-42.
[3]李永海.考虑关系关联的项目风险应对的案例决策分析方法[J].系统工程,2016(6):136-143.
LI Yonghai. The method of case decision analysis for project risk response with relation and correlation [J]. System Engineering, 2016(6): 136-143.
[4]FAN M, LIN N P ,SHEU C. Choosing a project risk handling strategy: An analytical model [J]. International Journal of Production Economics , 2016 ,112(2):700-713.
[5]HWANG B U,ZHAO X,TOH L P. Risk management in small construction projects in Singapore: Status , barriers and impact [J]. International Journal of Project Management , 2014 ,32(1): 116-124.
[6]MARCELINO-SADABA S. Project risk management methodology for small firms [J]. International Journal of Project Management,2014, 32(2): 327-40.
[7]李蒙,张云波.基于贝叶斯网络的复杂工程项目进度风险Monte-Carlo模拟[J].郑州轻工业学院学报(自然科学版),2012(3):98-101.
LI Meng, ZHANG Yunbo. Monte-Carlo simulation of progress risk for complex engineering projects based on bayesian networks [J]. Journal of Zhengzhou Institute of Light Industry (Natural Science Edition), 2012(03):98-101.
[8]ACKOFF R L. Systems organisation and interdisciplinary research[M]. London:Penguin, 2014.
[9]BERTALANFFY L. General system theory: foundations, development, applications[M]. New York:George Braziller Inc ,2014.
[10]RODRIGUES A,BOWERS J. The role of system dynamics in project management[J]. International Journal of Project Management, 2016, 14(4): 213-220.
[11]詹姆斯,戴维.模拟与风险分析[M].上海:上海人民出版社,2006:85-110.
JAMES D. Simulation and risk analysis [M] Shanghai: Shanghai People’s Publishing House, 2006: 85-110.
[12]李小玉,薛有志,牛建波.企业战略转型研究述评与基本框架构建[J].外国经济与管理,2015(12):3-15.
LI Xiaoyu, XUE Youzhi, NIU Jianbo. A review on the research of enterprise strategic transformation and its basic framework construction [J]. Foreign Economics & Management, 2015(12): 3-15.
[13]英豪,林艺馨.我国承包商的国际建筑市场选择模式研究[J].价值工程,2016(8):91-95.
YING Hao, LIN Yixin. Study on the selection model in the international construction market for Chinese contractors [J]. Value Engineering, 2016(8): 91-95.
[14]高腾安.建筑工程海外项目合同管理风险分析[J].重庆与世界(学术版),2016(21):30-34.
GAO Teng’an. Risk analysis of contract management for overseas construction project [J]. Chongqing and the Word (Academic Edition), 2016(21): 30-34.
[15]侯学良,刘凯,刘金珠.大型建筑工程施工进度多因素耦合问题分析及其决策[J].建筑经济,2016(5):98-101.
相似文献/References:
[1]常金贵.基于系统动力学的建设项目工期控制模型研究[J].西安建筑科技大学学报(自然科学版),2015,47(01):147.[doi:10.15986/j.1006-7930.2015.01.027]
CHANG Jingui.Research on the schedule control model of construction project based on system dynamics[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2015,47(04):147.[doi:10.15986/j.1006-7930.2015.01.027]
[2]赵 平,马宏飞,王 冲,等.建筑工程主体施工阶段二氧化碳排放研究[J].西安建筑科技大学学报(自然科学版),2014,46(06):800.[doi:10.15986/j.1006-7930.2014.06.006]
ZHAO Ping,MA Hongfei,WANG Chong,et al.Research on carbon dioxide emissions of the main building at construction stage[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2014,46(04):800.[doi:10.15986/j.1006-7930.2014.06.006]
[3]蒋卫平,张 谦,乐 云,等.工程项目中信任的产生与影响——基于承包商方视角[J].西安建筑科技大学学报(自然科学版),2012,44(01):97.[doi:10.15986/j.1006-7930.2012.01.016]
JIANG Wei-ping,ZHANG Qian,LE Yun,et al.Occurrence and function of trust in construction projects from the view of the contractor[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2012,44(04):97.[doi:10.15986/j.1006-7930.2012.01.016]
[4]史玉芳,李慧民,陆宁.工程项目施工系统可靠性及计算方法研究[J].西安建筑科技大学学报(自然科学版),2011,43(01):125.[doi:DOI:10.15986/j.1006-7930.2011.01.001]
SHI Yu-fang,LI Hui-min,LU Ning.Research on construction system reliability of construction projectand its calculation method[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2011,43(04):125.[doi:DOI:10.15986/j.1006-7930.2011.01.001]
[5]史玉芳,王秀芬,康 珅.基于模糊的工程项目施工可靠性评价研究[J].西安建筑科技大学学报(自然科学版),2015,47(05):740.[doi:DOI:10.15986/j.1006-7930.2015.05.023]
SHI Yufang,WANG Xiufen,KANG Shen.Study on evaluation of construction reliability for engineering project[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2015,47(04):740.[doi:DOI:10.15986/j.1006-7930.2015.05.023]
[6]祁神军,佘洁卿,张云波.基于SD 的公共建筑全寿命周期碳排放特性及敏感性仿真——以夏热冬暖地区为实证[J].西安建筑科技大学学报(自然科学版),2016,48(01):101.[doi:10.15986/j.1006-7930.2016.01.017]
QI Shenjun,SHE Jieqing,ZHANG Yunbo. Research on life cycle carbon emission and its reduction sensitivity of public building on the basal of system dynamics: a case study in hot summer and warm winter area[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2016,48(04):101.[doi:10.15986/j.1006-7930.2016.01.017]
[7]胡金荣,周恩毅.基于系统动力学的老年住宅需求仿真研究[J].西安建筑科技大学学报(自然科学版),2016,48(05):760.[doi:10.15986/j.1006-7930.2016.05.024]
HU Jinrong,ZHOU Enyi.Simulation research on the housing demand of aged based on the system d ynamics[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2016,48(04):760.[doi:10.15986/j.1006-7930.2016.05.024]
[8]罗福周,王冠楠.综合管廊PPP项目使用者付费与财政补贴联动调整研究[J].西安建筑科技大学学报(自然科学版),2019,51(06):917.[doi:10.15986/j.1006-7930.2019.06.021]
LUO Fuzhou,WANG Guannan.Research on the linkage adjustment of user payment and financial subsidies for PPP project of utility tunnel[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(04):917.[doi:10.15986/j.1006-7930.2019.06.021]
[9]卢 梅,刘 洋,金 婷,等.基于SD及模糊控制的工程项目目标管理[J].西安建筑科技大学学报(自然科学版),2012,44(03):400.[doi:10.15986/j.1006-7930.2012.03.016]
LU Mei,LIU Yang,JIN Ting,et al.Objective management in the project based on the SD and fuzzy control[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2012,44(04):400.[doi:10.15986/j.1006-7930.2012.03.016]