[1]李松,周岚,黄静宜. 基于ANP的分包商选择研究[J]. 湖北成人教育学院学报,2013,19(5):49-51.LI Song, ZHOU Lan,HUANG Jingyi. Study on subcontractor selection based on ANP[J].Journal of Hubei College of Adult Education, 2013, 19 (5): 49-51.
[2]董雅文,刘文慧.建筑施工分包商选择模型及实证研究[J].建筑经济,2012(9):79- 83.
DONG Yawen, LIU Wenhui. Selection model and empirical study of construction subcontractors[J]. Construction Economy, 2012 (9): 79-83.
[3]FONG P S W, CHOI S K Y. Final contractor selection using analytical hierarchy process[J]. Construction Management Economic, 2000(18): 547-557.
[4]邵军义,宋岩磊,曹雪梅,等.基于TOPSIS改进模型的工程项目承包商选择[J].土木工程与管理学报,2016,33(4):12-17.
SHAO Junyi, SONG Yanlei, CAO Xuemei, et al. Selection of project contractors based on TOPSIS improved model[J]. Journal of Civil Engineering and Management, 2016, 33 (4): 12-17.
[5]HAMIDREZ A. A new approach for subcontractor selection in the construction industry based on portfolio theory[J].Civil Engineering and Management, 2016, 22(3):12-19.
[6]穆静静,王哲,曾又其.并行工程视角下产品绿色设计评估模式构建[J].科技进步与对策,2009,26(6):122-125.
MU Jingjing, WANG Zhe, ZENG Youqi. Construction of green design evaluation model from the perspective of concurrent engineering[J]. Scientific and Technological Progress and Countermeasures, 2009, 26 (6): 122-125.
[7]卢梅,韩小康,孔祥坤,等. 基于BP神经网络和TOC的工程造价预控研究[J]. 西安建筑科技大学学报(自然科学版),2011,43(1):106- 112.
LU Mei, HAN Xiaokang, KONG Xiangkun, et al. Research on project cost pre-control based on BP neural network and TOC[J]. J. of Xi′an Univ. of Arch. & Tech.(Natural Science Edition), 2011, 43 (1): 106-112.
[8]王吉权,王福林,董志贵,等.基于改进BP神经网络的电力负荷预测[J].数学的实践与认识,2017,47(9):276-284.
WANG Jiquan, WANG Fulin, DONG Zhigui, et al. Power load forecasting based on improved BP neural network[J]. Practice and Understanding of Mathematics, 2017,47(9): 276-284.
[9]王德明,王莉,张广明. 基于遗传BP神经网络的短期风速预测模型[J]. 浙江大学学报(工学版),2012,46(5):837- 841.
WANG Deming, WANG Li, ZHANG Guangming. Short-term wind speed prediction model based on genetic BP neural network[J]. Journal of Zhejiang University (Engineering Edition), 2012, 46 (5): 837-841.
[10]李帅,魏虹,倪细炉,等. 基于层次分析法和熵权法的宁夏城市人居环境质量评价[J]. 应用生态学报,2014,25(9):2700-2708.
LI Shuai, WEI Hong, NI Xilu, et al. Urban human settlement environmental quality assessment in ningxia based on analytic hierarchy process and entropy weight method[J]. Journal of Applied Ecology, 2014, 25 (9): 2700-2708.
[11]尹鹏,杨仁树,丁日佳,等. 基于熵权法的房地产项目建筑质量评价[J]. 技术经济与管理研究,2013(3):3-7.
YIN Peng, YANG Renshu, DING Rijia, et al. Evaluation of building quality of real estate project based on entropy weight method[J]. Research on Technology, Economy and Management, 2013 (3): 3-7.
[12]薄煜. 基于建筑供应链的工程建设分包商选择评价研究[D].重庆:重庆大学,2015.
BO Yu. Research on selection and evaluation of construction subcontractors based on construction supply chain[D]. Chongqing: Chongqing University, 2015.
[13]江新,朱沛文,杨轶雯,等. 设计院总承包模式下施工分包商选择研究[J]. 工程管理学报,2014,28(5):37-41.
JIANG Xin, ZHU Peiwen, YANG Yiwen, et al. Study on the selection of construction subcontractors under the general contracting mode of design institute[J]. Journal of Engineering Management, 2014, 28 (5): 37-41.
[14]CAO Wang. Contractor-subcontractor relationships with the implementation of emerging interorganizational technologies: roles of cross-project learning and pre-contractual opportunism[J]. International Journal of Construction Education and Research, 2014, 10 (4):28-35.
[15]MICHAELA Schaffhauser-Linzatti. Construction management: subcontractor scopes of work[J]. Construction Management and Economics, 2012, 30(9):46-55.
[16]SERDAR Ulubeyli, Aynur Kazaz. Fuzzy multi-criteria decision making model for subcontractor selection in international construction projects[J]. Technological and Economic Development of Economy, 2016, 22(2):37-42.
[17]YU Feng. Study on the selection of subcontractors based on fuzzy comprehensive evaluation[J].Advanced Materials Research, 2012, 2091 (594):32-38.
[18]HAMIDREZ A Abbasianjahromi, HOSSEIN Rajaie. A new decision making model for subcontractor selection and its order allocation[J]. Project Management Journal, 2014, 45(1):21-26.
[19]张浩.EPC合同模式下分包商的选择及评估“过程”管理[J]. 北京石油管理干部学院学报,2015,22(4):26-31.
ZHANG Hao.Selection and evaluation of subcontractors under EPC contract model[J].Journal of Beijing Petroleum Management Cadre College, 2015,22(4): 26-31.
[20]罗党.基于正负靶心的多目标灰靶决策模型[J].控制与决策,2013,28(2):241-246.
LUO Dang. Multi-objective grey target decision-making model based on positive and negative target centers[J]. Control and decision-making, 2013, 28 (2): 241-246.