[1]毛雪松,徐 旺,臧芝树,等.中法公路涵洞水文设计方法对比[J].西安建筑科技大学学报(自然科学版),2019,51(05):654-659.[doi:10.15986/j.1006-7930.2019.010.007]
 MAO Xuesong,XU Wang,ZANG Zhishu,et al.Comparison of hydrological design method for highway culvert between China and France[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(05):654-659.[doi:10.15986/j.1006-7930.2019.010.007]
点击复制

中法公路涵洞水文设计方法对比()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
51
期数:
2019年05期
页码:
654-659
栏目:
出版日期:
2019-12-05

文章信息/Info

Title:
Comparison of hydrological design method for highway culvert between China and France
文章编号:
1006-7930(2019)05-0654-06
作者:
毛雪松1徐 旺1臧芝树2唐 可1汤鑫磊1
(1.长安大学 公路学院 陕西 西安 710064; 2.中国公路工程咨询集团有限公司 北京 100097)
Author(s):
MAO Xuesong1 XU Wang1 ZANG Zhishu2TANG Ke1TANG Xinlei1
(1.School of Highway, Chang’an University, Xi’an 710064, China; 2.China Highway Engineering Consultants Corporation, Beijing 100097,China.)
关键词:
水文设计 中法规范对比 公路涵洞 设计流量 水力验算
Keywords:
hydrological design highway culvert comparison of Chinese and French standard hydrological design design flow hydraulic verification
分类号:
TU411
DOI:
10.15986/j.1006-7930.2019.010.007
文献标志码:
A
摘要:
为了分析公路涵洞水文设计方法在中国与非洲法语区国家的差异性,将中法规范公路涵洞设计方法进行了对比,结果表明:在涵洞形式选择上,中国规范需考虑设计流量、材料供给、土性及地形差异及填土高度等因素,而法国规范只需考虑设计流量和填土高度; 中国规范设计流量计算方法有半理论半经验法(暴雨推理法、径流形成法)、经验法(形态调查法、直接类比法),所涉及计算参数较多; 而法国规范设计流量计算方法只有半经验半理论法,各方法之间有一定的联系并且所用计算参数较少; 中法规范公路涵洞水力验算内容基本上相同,包括涵洞内流速、水深、涵前雍水,但是评价标准、验算公式有一定的差异性.以具体涵洞为工程实例,采用中法规范计算了涵洞的设计流量并进行了水力验算,结果表明应用中国规范计算的涵洞设计流量大于法国规范.
Abstract:
In order to compare the differences in road culvert hydrological design methods and between China African French-speaking countries, the methods of calculating design flow and the hydraulic verification methods are compared. Results indicated that in the choice of culvert form, the Chinese standard needs to consider factors such as design flow, material supply, soil and topographical differences, and fill height while the French standard only need to consider design flow and fill height. Chinese standard flow calculation method has semi-theoretical and semi-empirical method(rainstorm reasoning method, runoff formation method)and empirical method(morphological investigation method, direct analogy method), and more calculation parameters are involved. However, the French standard design flow calculation method has only semi-empirical and semi-theoretical methods, and there is a certain relationship between each method and the calculation parameters used are less. The contents of verification calculation for highway culvert in the Chinese and French standard are basically the same and the flow velocity, water depth and swill water in the culvert need to be checked, but the evaluation criteria and the calculation formulas have certain differences. Taking the concrete culvert as an engineering example, the design flow of the culvert was calculated by the Chinese-French specification and the hydraulic check was carried out. The results show that the culvert design flow calculated by Chinese standard is larger than the French norm.

参考文献/References:

[1] 丁小军,王佐.法中公路设计标准、规范的差异比较[J].公路,2008(9):7-14.DING Xiaojun,WANG Zuo. Comparison of differences in design standards and specifications between French and Chinese highways[J].Highway, 2008(9): 7-14.
[2] 郭喜,王弘一.中法公路施工部分规范的区别简析[J].工程技术,2016(16):63-66.GUO Xi, WANG Hongyi. A brief analysis of the differences between Chinese and French highway construction specifications[J]. Engineering Technology, 2016(16): 63-66.
[3] 张青宇. 中、法岩土规范岩土体分类对比分析[J].水电站设计,2016,32(3):65-69.ZHANG Qingyu. Comparative analysis of classification of rock and soil in Chinese and French rocks[J]. Design of Hydropower Station, 2016, 32(3): 65-69.
[4] 江涛. 阿尔及利亚贝贾亚高速公路可压缩土的地基处理设计[J].中外公路,2017,3(1):10-14.JIANG Tao.Foundation treatment design of compressible soil for Algeria’s Bejaia highway [J]. Journal of China & Foreign Highway, 2017, 3(1): 10-14.
[5] 齐元新. 中国与法国规范下土方填料分类及使用条件对比[J].铁道建筑技术,2013(3):39-43.QI Yuanxin. Comparison of classification and use conditions of earthwork fillers under Chinese and French regulations[J]. Railway Construction Technology, 2013(3): 39-43.
[6] JIA Z, TANG S, LUO W, et al. Estimation of design floods in ungauged catchments using a regional index flood method[J]. Journal of Environmental Management, 2014, 67: 4-11.
[7] 刘毅,何山清.阿尔及利亚东西高速公路桥涵水文设计方法及其应用[J].交通科技,2009(6):33-35.LIU Yi, HE Shanqing. Hydrological design method of bridge and culvert of the east-west expressway in Algeria and its application[J]. Traffic Technology, 2009(6): 33-35.
[8] HU Yiming, LIANG Zhongmin, LIU Xinsheng, et al. Uncertainty assessment of estimation of hydrological design values[J]. Springer Journal, 2015, 29:501-511.
[9] 华鹏年,雷伟,刘新生.小流域公路桥涵设计流量计算方法研究[J].公路,2014(4):4-7.HUA Pengnian, LEI Wei, LIU Xinsheng. Study on calculation method of design flow of bridge and culvert in small watershed[J].Highway, 2014(4): 4-7.
[10]李长秋,隋秀良,陈长俊. 绥建公路24 km涵洞水文计算及涵洞施工体会[J].黑龙江交通科技,2001(1):48-50.LI Changqiu, SUI Xiuliang, CHEN Changjun. Hydrological calculation and culvert construction experience of 24 km culvert in Suijian Highway[J], Heilongjiang Transportation Technology, 2001(1): 48-50.
[11]杨磊磊.阿尔及利亚东西高速公路涵洞水文水力及洞口防冲刷计算[J].四川建材,2014,40(1):137-140.YANG Leilei.Hydrological hydraulics and anti-scour calculation of culverts in the east-west expressway of Algeria[J]. Sichuan Building Materials, 2014, 40(1): 137-140.
[12]French Highway and highway Technology Institute. System facilities of highway drainage[S].French Repubic: Ministry of Transport, Housing, Tourism and Marine Equipment,2006.
[13]French Highway and Highway Technology Institute. Road drainage guide[S].Répulique francaise: Ministére desframsports, dulogememer, du fourisme et deséquipements maritimes,2006.
[14]河北省交通规划设计院. 公路涵洞设计细则: JTG/T D65-04-2007[S]. 北京:人民交通出版社,2007.Heibei Provincial Communications Planning and Design Institute. Guidelines for design highway culvert: JTG/T D65-04-2007:[S]. Beijing: China Communications Publishing, 2007.
[15]张江峰,李隆.西非某国公路升级改造桥涵水文水力设计实践[J].山西建筑,2013,39(20):170-171.ZHANG Jiangfeng, LI Long. Hydrological and hydraulic design practice of upgrading and reconstructing bridges and culverts in a highway in West Africa[J]. Shanxi Architecture,2013, 39(20): 170-171.
[16]中交路桥技术有限公司. 公路排水设计规范,JTG/T D33-2012:[S].北京:人民交通出版社,2012.Zhongjiao Road and Bridge Technology Co.,Ltd. Specifications for drainage design of highway, JTG/T D33-2012:[S]. Beijing: China Communications Publishing, 2012.
[17]美国联邦高速公路局运输处.河流桥梁水力工程[M].西安:中交第一公路勘察设计院有限公司,2006.US Federal Highways Transporation Office.River bridge hydraulic engineering[M]. Xi’an: CCCC First Highway Consultants Co.,LTD, 2006.

备注/Memo

备注/Memo:
收稿日期:2018-10-15 修改稿日期:2019-09-03基金项目:国家自然科学基金项目(211021180363)第一作者:毛雪松(1976-),女,教授,博士生导师,主要从事道路工程教学和研究工作.E-mail:xuesongmao@yahoo.com.cn
更新日期/Last Update: 2019-12-05