[1]李奎.水平层状隧道围岩压力拱理论研究[D].成都:西南交通大学,2010.LI Kui. Theoretical study on pressure arch of surrounding rock in horizontal layered tunnel [D]. Chengdu: Southwest Jiaotong University, 2010.
[2]张敏. 复杂地质条件下大断面隧道“零”进洞工法技术体系及应用研究[D].成都:成都理工大学,2009.
ZHANG Min.Technical system and application of zero entry method for large cross section tunnel under complex geological conditions [D]. Chengdu: Chengdu University of Technology, 2009.
[3]LI Changdong, WANG Xiaoyi,TANG Huiming,et al. A preliminary study on the location of the stabilizing piles for colluvial landslides with interbedding hard and soft bedrocks[J]. Engineering Geology,2017,224
[4]汪宏,蒋超. 浅埋偏压隧道洞口坍方数值分析与处治[J]. 岩土力学,2009(11):3481-3485.
WANG Hong, JIANG Chao. Numerical analysis and treatment of collapse of shallow buried bias tunnel portal[J]. Rock and Soil Mechanics, 2009(11): 3481-3485.
[5]冯秀国. 采用地表注浆方法使隧道穿越坍塌区[J]. 铁道建筑, 1998(2):28-30.
FENG Xiuguo. Using surface grouting method to make tunnels pass through collapsed area [J].Railway Building, 1998 (2): 28-30.
[6]李锦平, 黄武来. 浅埋隧道通顶坍塌整治与思考[J]. 中国铁路, 1996(7):49-51.
LI Jinping, HUANG Wulai. Renovation and consideration of roof collapse in shallow tunnels[J]. China Railway, 1996 (7): 49-51.
[7]DAY M J. Karstic problems in the construction of Milwaukee’s deep tunnels[J]. Environmental Geology, 2004, 45(6):859-863.
[8]刘小军, 张永兴. 浅埋偏压隧道洞口段合理开挖工序及受力特征分析[J]. 岩石力学与工程学报, 2011(S1):3066-3073.
LIU Xiaojun, ZHANG Yongxing. Reasonable excavation procedure and stress characteristics of shallow buried bias tunnel portal section [J]. Chinese Journal of Rock Mechanics and Engineering, 2011 (S1): 3066-3073.
[9]SCHUMACHER Forrest P,EUNHYE Kim. Modeling the pipe umbrella roof support system in a Western US underground coal mine[J].International Journal of Rock Mechanics and Mining Sciences,2013,60:114-224.
[10]段海澎, 徐干成, 刘保国. 富溪偏压连拱隧道围岩与支护结构变形和受力特征分析[J]. 岩石力学与工程学报, 2006, 25(S2):3763-3768.
DUAN Haipeng,XU Gancheng,LIU Baoguo. Analysis of deformation and stress characteristics of surrounding rock and supporting structure of Fuxi multi arch tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2006, 25(S2):3763-3768.
[11]LIU W, LIU B, WANG W. Pipe shield effect analysis of double-arched tunnel under unsymmetrical pressures[J]. Chinese Journal of Rock Mechanics & Engineering, 2007, 26:3704-3710.
[12]赵乐之, 刘晓峰, 乔宁. 偏压隧道设计的数值分析[J]. 建筑结构, 2010(S1):409-411.
ZHAO Lezhi, LIU Xiaofeng,QIAO Ning. Numerical analysis of the design of bias tunnel [J]. Journal of Architectural Structure, 2010 (S1): 409-411.
[13]熊良宵, 李天斌, 刘勇. 隧道地震响应数值模拟研究[J]. 地质力学学报, 2007, 13(3):255-260.
XIONG Liangxiao, LI Tianbin,LIU Yong. Numerical simulation of tunnel seismic response [J]. Chinese Journal of Geomechanics, 2007, 13 (3): 255-260.
[14]江学良, 陈江, 杨慧,等. 基于大型振动台试验的偏压隧道地震响应特性研究[J]. 自然灾害学报, 2016, 25(5):158-166.
JIANG Xueliang, CHEN Jiang, YANG Hui, et al. Study on seismic response characteristics of bias tunnel based on large-scale shaking table test [J]. Journal of Natural Disasters, 2016, 25 (5): 158-166.
[15]KAMATA Mashimo. Centrifuge model test of tunnel face reinforcement by bolting [J].Tunnelling and Underground Space Technology,2003,18(2/3):205-212.