[1]卫守峰.黄土地区地铁竖井转横通暗挖施工稳定性分析[J].西安建筑科技大学学报(自然科学版),2020,52(03):366-375.[doi:10.15986/j.1006-7930.2020.03.009]
 WEI Shoufeng.Optimization analysis of tunnel construction methods through cross aisle from subway shaft based on numerical test analysis in loess stratum[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2020,52(03):366-375.[doi:10.15986/j.1006-7930.2020.03.009]
点击复制

黄土地区地铁竖井转横通暗挖施工稳定性分析()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
52
期数:
2020年03期
页码:
366-375
栏目:
出版日期:
2020-06-30

文章信息/Info

Title:
Optimization analysis of tunnel construction methods through cross aisle from subway shaft based on numerical test analysis in loess stratum
文章编号:
1006-7930(2020)03-0366-10
作者:
卫守峰12
(1.中国铁建大桥工程局集团有限公司,天津 300300; 2.西安建筑科技大学 陕西省岩土与地下空间工程重点实验室,陕西 西安 710055)
Author(s):
WEI Shoufeng12
(1.Chinese Railway Bridge Engineering Bureau Group Co.Ltd., Tianjin 300300, China; 2.Key Laboratory of Geotechnical and Underground Space Engineering of Shaanxi Province, Xi’an Univ. of Arch. & Tech., Xi’an 710055, China )
关键词:
地铁工程 竖井转横通道 施工方法 黄土地层 数值模拟
Keywords:
subway engineering cross aisle from subway shaft construction method loess strata numerical simulation
分类号:
TU 443
DOI:
10.15986/j.1006-7930.2020.03.009
文献标志码:
A
摘要:
针对地铁暗挖采用的竖井转横通道施工中采用的先竖井封底,再通过井内临时搭设的施工平台进行竖井转横通道施工的“先竖井后横通”施工方案存在的施工周期长、安全隐患大的问题,依托在建的西安地铁五号线区间黄土隧道工程的施工,进行了竖井转横通道施工方案的数值试验研究,分析了黄土地层中“先竖井后横通”施工和竖井施工到横通道高程后先转入横通道施工,在横通道具备作业空间后进行竖井下部开挖的“竖井-横通并行”施工时竖井-横通道结构及地层的变形、受力特点,对比研究两种施工方案引起的地表沉降及围岩塑性区的变化.数值分析表明,“竖井-横通并行”施工时,马头门横向收敛位移和竖井靠近马头门一侧井壁的支护结构应力较“先竖井后横通”施工方案小约14%以上,因此对稳定性较好的黄土地层,建议采用“竖井-横通并行”施工方案.
Abstract:
The safety control of excavation through cross aisle from subway shaft is the key technology in building urban metro.The old method applied is to excavate the shaft to design elevation position and then to excavate the cross aisle.Owing to the long excavating time and too much space taken,the paper takes finite element analysis software to analyze a new method,i.e. to excavate the shaft to the temporary inverted arch elevation position in superior step of the cross aisle and then to excavate the shaft based on successfully using the last method in the construction through cross aisle from subway shaft of Xian rail traffic line 5 in the first phase.The paper analyzes the consolidation safety in two different ways by large finite element analysis Software.Results show that the surface and construction about the cross aisle show the same results after the whole excavation in loess stratum.And the new way can get a better result,about 30%, at controlling the crosswise strain of the horsehead and the mechanical conditions of sidewall, so that the tunnels were more stable.Comparative analysis of field monitoring results prove economic, security and feasibility of “cross-channel parallel shaft construction” program.

参考文献/References:

[1] 宋战平,张丹锋,曲建生,等. 承压富水砂土地层桩洞法施工变形控制研究[J]. 西安建筑科技大学学报(自然科学版),2015,47(1):33-38.
SONG Zhanping, ZHANG Danfeng, QU Jiansheng, et al. Study on the deformation control of PBA construction method in pressure water sand stratum[J]. J. of Xi’an Univ. of Arch. & Tech.(Natural Science Edition), 2015, 47(1): 33-38.
[2]王东元,曲慧红,李文波. 既有线下邻近大断面地铁双隧道暗挖施工对地表形变的影响[J]. 岩石力学与工程学报,2014,33(S2):4075-4085.
WANG Dongyuan, QU Huihong, LI Wenbo. Issues affecting ground subsidence induced by covered excavation for large cross-sectional twin tunnel under existing structures[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(S2): 4075-4085.
[3]刘涛,张瑾,闫 楠. 岩石地区浅埋暗挖地铁车站支护结构设计初步研究[J]. 岩土工程学报,2010,33(S2):347-350.
LIU Tao, ZHANG Jin, YAN Nan. Retaining structure design of subway station of under cutting with shallow over burden in rock strata[J]. Chinese Journal of Geotechnical Engineering,2010, 33(S2): 347-350.
[4]罗富荣,国 斌. 北京地铁天安门西站“暗挖逆筑法”施工技术[J]. 岩土工程学报,2001,23(1):75-78.
LUO Furong, GUO Bin. Construction technology of “tunneling and top-down method” at west Tian’ an men station in metro of Beijing[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(1): 75-78.
[5]王林琳,杨修. 暗挖地铁车站开挖引起临近古建筑物沉降的研究[J]. 铁道建筑技术,2014,31(4):17-20.
WANG Linlin, YANG Xiu. Research on the Subsidence of Adjacent Ancient Building Close to the Underground Excavation of Subway Station[J]. Railway Construction Technology, 2014, 31(4): 17-20.
[6]台启民,张顶立,房倩,等. 暗挖重叠地铁隧道地表变形特性分析[J]. 岩石力学与工程学报,2014,33(12):2472-2480.
TAI Qimin, ZHANG Dingli, FANG Qian, et al. Analysis of ground surface deformation induce by excavation of crossing metro tunnels in urban under ground[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(12): 2472-2480.
[7]李静. 竖井横通道转正洞施工方案比选[J]. 隧道建设,2008,28(4):476-478.
LI Jing. Comparison of construction Scheme for conversion from Horizontal and shaft to main tunnel[J]. Tunnel Construction, 2008, 28(4): 476-478.
[8]邵晶. 城市地铁施工的数值模拟与参数反分析[D]. 大连:大连交通大学,2011.
SHAO Jing. The construction Numerical simulation and back analysis Parameters of urban subway[D]. Dalian: Dalian Jiaotong University, 2011.
[9]俞琳. 软岩隧道开挖与支护数值分析[D]. 大连:大连理工大学,2005.
YU Lin. Numerical analysis on tunnel excavation and support in soft rock[D]. Dalian: Dalian University of Technology, 2005.
[10]王清标,蒋金泉,路林海,等. 不同开挖方式对近距离交叠隧道影响模拟研究[J]. 岩石力学与工程学报,2013,32(10):2079-2087.
WANG Qingbiao, JIANG Jinquan, LU Linhai, et al. Numerical simulation for influence law of different excavation methods on adjacent over lapping tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2013, 32(10): 2079-2087.
[11]杨福麟,刘永林,胡斌. 武汉地铁隧道开挖引起地表沉降的数值模拟研究[J]. 工程地质学报,2013,21(1):85-91.
YANG Fulin, LIU Yong-lin, HU Bin. Numerical simulation of ground subsidence to tunnel excavation for wuhan subway [J]. Journal of Engineering Geology, 2013, 21(1): 85-91.
[12]王福恩,张付林. 地铁竖井横通道破马头门施工技术研究[J]. 安徽建筑,2009,166(3):54-55,77.
WANG Fuen, ZHANG Fulin. Study on the Opening Technology of Horsehead between Subway Shaft and Cross Aisle[J]. Anhui Architecture, 2009, 166(3): 54-55,77.
[13]贺长俊,蒋中庸,崔志杰,等. 城市地下工程施工中的马头门开挖技术[J]. 市政技术,2012,3(3):17-21.
HE Changjun, JIANG Zhongyong, CUI Zhijie, et al. Ingate Excavation Technology of Urban Underground Engineering Construction[J]. Municipal Engineering Technology, 2012, 3(3): 17-21.
[14]白铭海,吉小明. 地铁小竖井转横通道施工大跨隧道数值模拟分析[J]. 地下空间与工程学报,2015,11(4):469-476.
BAI Minghai, JI Xiaoming. Numerical Simulation Analysis of Large-Span Tunnel Construction through Cross Aisle from Subway Small Shaft[J]. Chinese Journal of Underground Space and Engineering, 2015, 11(4): 469-476.
[15]蒋青青,黄晓阳,周恺,等. 复杂条件下地铁隧道马头门施工技术与监测分析[J]. 岩石力学与工程学报,2010,29(S1):2858-2865.
JIANG Qingqing, HUANG Xiaoyang, ZHOU Kai, et al. Construction technology and monitoring analysis of subway tunnel ingate under complex condition[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(S1): 2858-2865.

相似文献/References:

[1]张学钢,张丹锋,刘 可,等.隧道临近既有铁路桥桩基施工扰动影响的数值分析研究[J].西安建筑科技大学学报(自然科学版),2015,47(02):217.[doi:10.15986/j.1006-7930.2015.02.012]
 ZHANG Xuegang,ZHANG Danfeng,LIU Ke,et al.Influence of the metro undercut excavation tunnel construction on existing railway bridge pile foundation[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2015,47(03):217.[doi:10.15986/j.1006-7930.2015.02.012]

备注/Memo

备注/Memo:
收稿日期:2019-10-23 修改稿日期:2020-05-11
基金项目:国家自然科学基金资助项目(51578447); 陕西省建设厅科技发展计划项目(2019-k39)
第一作者:卫守峰(1976-),男,硕士,高级工程师,主要从事隧道与地下工程施工管理方面的工作.E-mail:214452111@qq.com
更新日期/Last Update: 2020-07-30