[1]牛泽林,刘朝鹏,郑 蕾,等.大断面公路板岩隧道开挖与支护数值模拟研究[J].西安建筑科技大学学报(自然科学版),2020,52(03):376-383,403.[doi:10.15986/j.1006-7930.2020.03.010]
 NIU ZeLin,LIU Chaopeng,ZHENG Lei,et al.Numerical simulation study on excavation and support of slab tunnel in large section highway[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2020,52(03):376-383,403.[doi:10.15986/j.1006-7930.2020.03.010]
点击复制

大断面公路板岩隧道开挖与支护数值模拟研究()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
52
期数:
2020年03期
页码:
376-383,403
栏目:
出版日期:
2020-06-30

文章信息/Info

Title:
Numerical simulation study on excavation and support of slab tunnel in large section highway
文章编号:
1006-7930(2020)03-0376-08
作者:
牛泽林12刘朝鹏3郑 蕾3吴辉辉3胡文乐12臧鹏飞12刘 华12
(1.西安建筑科技大学 土木工程学院,陕西 西安 710055; 2.陕西省岩土与地下空间工程重点实验室,陕西 西安 710055; 3.中铁北京工程局集团第一工程有限公司,陕西 西安 710100)
Author(s):
NIU ZeLin12 LIU Chaopeng3 ZHENG Lei3 WU Huihui3 HU Wenle12 ZANG Pengfei12 LIU Hua12
(1.School of Civil Engineering, Xi’an Univ.of Arch.& Tech., Xi’an 710055, China; 2.Shaanxi Key Laboratory of Geotechnical and Underground Space Engineering, Xi’an 710055, China; 3.China Railway Beijing Engineering Bureau Group First Engineering Co., Ltd., Xi’an 710100, China)
关键词:
隧道工程 板岩 大断面 数值模拟
Keywords:
tunnel engineering slate large section numerical simulation
分类号:
TU455.4
DOI:
10.15986/j.1006-7930.2020.03.010
文献标志码:
A
摘要:
为了研究上下台阶法和CD法等不同施工工法及不同开挖步距下对大断面板岩隧道开挖围岩受力及变形的影响规律,基于有限元基本原理对各 隧道的施工工况进行模拟分析,得到了隧道开挖过程中软弱围岩的应力场和位移场,并对隧道围岩稳定性进行了探讨.研究结果表明:采用两台阶法模拟隧道开挖过程中整个施工过程中应力最大值为3.550 MPa,洞室周边的应力影响范围为5~20 m,在隧洞跨径的1.5倍以内; 采用CD法模拟隧道施工时洞周发生的位移较小,拱顶下沉和水平收敛的位移量与两台阶法施工的位移量相比分别减少了27.8%和34.0%; 模拟不同开挖步距下隧道拱顶沉降和水平收敛的位移变形大致表现出二次多项式的函数关系,为隧道施工期的安全稳定及控制技术提供数据支撑及理论依据.
Abstract:
In order to study the influence of different construction methods such as full upper and lower step method and CD method on the stress and deformation of surrounding rock in large fault face rock tunnel excavation under different excavation steps, the construction of each tunnel is analyzed on the basic principle of finite element The simulation analysis shows the stress field and displacement field of the weak surrounding rock during the tunnel excavation process, and discusses the stability of the tunnel surrounding rock was discussed.Results show that the maximum stress during the tunnel excavation process is 3.550 MPa, and the stress around the cavern is 5-20 m, which is within 1.5 times of the span of the tunnel.The CD method is used for simulation,and the displacement of the tunnel is small when the tunnel is constructed.The displacement of the dome sinking and horizontal convergence is reduced by 27.8% and 34.0%, compared with the displacement of the two-step construction.The tunnel vault is simulated under different excavation steps.The displacement deformation of settlement and horizontal convergence generally shows the function relationship of quadratic polynomial, which provides data support and theoretical basis for the safety and stability and control technology of tunnel construction period.

参考文献/References:

[1] 中国公路学报编辑部. 中国隧道工程学术研究综述?2015[J]. 中国公路学报, 2015, 28(5):1-65.
Editorial Department of China Highway Journal. A summary of academic research on China tunnel engineering.2015 [J]. China Journal of Highway and Transport, 2015, 28(5): 1-65.
[2]张弥, 刘维宁, 秦淞君. 铁路隧道工程的现状和发展[J]. 土木工程学报, 2000, 33(2):1-7.
ZHANG Mi, LIU Weining, QIN Songjun. Current status and development of railway tunnel engineering [J]. China Civil Engineering Journal, 2000, 33(2): 1-7.
[3]何振宁. 铁路隧道疑难工程地质问题分析——以30多座典型隧道工程为例[J]. 隧道建设(中英文), 2016, 36(6):636-665.
HE Zhenning. Analysis of difficult engineering geological problems in railway tunnels:Taking more than 30 typical tunnel projects as an example [J]. Tunnel Construction(Chinese and English), 2016, 36(6): 636-665.
[4]黄润秋, 王贤能, 唐胜传, 等. 深埋长隧道工程开挖的主要地质灾害问题研究[J]. 地质灾害与环境保护, 1997(1):50-68.
HUANG Runqiu, WANG Xianneng, TANG Shengchuan, et al. Research on the main geological hazards in the excavation of deep-buried long tunnels [J]. Geological Hazards and Environmental Protection, 1997(1): 50-68.
[5]张广泽, 冯君, 崔建宏. 高速铁路隧道岩溶灾害及防治关键技术研究[J]. 铁道标准设计, 2018, 62(11):112-117.
ZHANG Guangze, FENG Jun, CUI Jianhong. Research on Key Technologies of Karst Disaster and Prevention in High-speed Railway Tunnels [J]. Railway Standard Design, 2018.
[6]朱泽奇, 盛谦, 梅松华, 等. 改进的遍布节理模型及其在层状岩体地下工程中的应用[J]. 岩土力学, 2009, 30(10):3115-3121.
ZHU Zeqi, SHENG Qian, MEI Songhua, et al. Improved spreading joint model and its application in layered rock mass underground engineering [J]. Rock and Soil Mechanics, 2009, 30(10): 3115-3121.
[7]赵少强, 林安宁, 闫小军. 哈达铺隧道直立板岩大变形分析及控制施工技术[J]. 现代隧道技术, 2011, 48(2):73-77.
ZHAO Shaoqiang, LIN Anning, YAN Xiaojun. Large deformation analysis and control construction technology of upright slate in Hadapu tunnel [J]. Modern Tunnelling Technology, 2011, 48(2): 73-77.
[8]徐平, 甘军, 丁秀丽. 三峡工程船闸高边坡岩体长期变形及稳定性有限元分析[J]. 长江科学院院报, 1999, 16(2):31-34.
XU Ping, GAN Jun, DING Xiuli. Finite element analysis of long-term deformation and stability of rock mass in the high slope of ship lock of Three Gorges project [J]. Journal of Yangtze River Academy of Sciences, 1999, 16(2): 31-34.
[9]PASSARIS E K S, RAN J Q, MOTTATHED P. Stability of the jointed roof in stratified rock[J]. International Journal of Rock Mechanices and Mining Science & Geomechanics Abstracts,1993,30(7):857-860.
[10]TONON F, AMADEI B. Effect of elastic anisotropy of tunnel wall displacements behind a tunnel faee[J]. International Journal of Rock Mechanices and Rock Engneering, 2002,35(3):141-160.
[11]张农, 侯朝炯, 王培荣.深井三软煤巷锚杆支护技术研究[J].岩石力学与工程学报,1999(4):69-72.
ZHANG Nong, HOU Chaojiong, WANG Peirong. Research on bolt support technology for deep soft coal roadway [J].Chinese Journal of Rock Mechanics and Engineering, 1999(4): 69-72.
[12]安红刚, 冯夏庭.大型洞室群稳定性与优化的进化有限元方法研究[J].岩土力学,2001(4):373-377.
AN Honggang, FENG Xiating. Study on evolutionary finite element method for stability and optimization of large cavern groups [J].Rock and Soil Mechanics, 2001(4): 373-377.
[13]肖明, 龚玉锋, 俞裕泰.西龙池抽水蓄能电站地下厂房围岩稳定三维非线性分析[J].岩石力学与工程学报,2000(5):557-561.
XIAO Ming, GONG Yufeng, YU Yutai. Three-dimensional nonlinear analysis of surrounding rock stability of underground powerhouse of Xilongchi pumped storage power station [J]. Journal of Rock Mechanics and Engineering, 2000(5): 557-561.
[14]肖明, 王阳雪. 陡倾角层状岩体中地下厂房洞室围岩稳定性分析[J]. 岩石力学与工程学报, 2002, 21(B06):2057-2060.
XIAO Ming, WANG Yangxue. Stability analysis of surrounding rock of underground powerhouse caverns in steep dip layered rock mass [J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(B06): 2057-2060.
[15]杨会军, 王梦恕. 隧道围岩变形影响因素分析[J]. 铁道学报, 2006, 28(3):92-96.
YANG Huijun, WANG Mengshu. Analysis of factors affecting tunnel surrounding rock deformation [J]. Journal of the China Railway Society, 2006, 28(3): 92-96.

相似文献/References:

[1]宋战平,刘 京,吴焕通,等.长陡斜井钢纤维喷射混凝土单层衬砌试验研究[J].西安建筑科技大学学报(自然科学版),2013,45(03):348.[doi:10.15986/j.1006-7930.2013.03.008]
 SONG Zhan-ping,LIU Jing,WU Huan-Tong,et al.Experimental research on single-layer tunnel lining of steel fiber shotcrete and the application in motenlin deviated well[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2013,45(03):348.[doi:10.15986/j.1006-7930.2013.03.008]
[2]宋战平、,杨腾添,张丹锋,等.溶洞对隧道(洞)稳定性影响的数值试验及现场监测分析[J].西安建筑科技大学学报(自然科学版),2014,46(04):484.[doi:10.15986/j.1006-7930.2014.04.005]
 SONG Zhanping YANG TengtianZHANG DanfengLI Ning.Experiments and field monitoring and analysis about the impact of existing cave on the stability of the tunnel[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2014,46(03):484.[doi:10.15986/j.1006-7930.2014.04.005]
[3]张新柳.基于超前预报信息的隧道围岩分级及工程应用研究[J].西安建筑科技大学学报(自然科学版),2016,48(05):648.[doi:10.15986/j.1006-7930.2016.05.006]
 ZHANG Xinliu.Study on the classification and application of the tunnel s surrounding rock based on geological information forecast[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2016,48(03):648.[doi:10.15986/j.1006-7930.2016.05.006]
[4]宋战平,李世豪,张学钢,等.基于修正Peck法的隧道施工全地层变形规律研究[J].西安建筑科技大学学报(自然科学版),2018,50(02):190.[doi:10.15986/j.1006-7930.2018.02.006]
 SONG ZhanpingLI ShihaoZHANG XuegangWANG JunbaoWANG Tao.Study on strata settlement regular pattern induced by[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2018,50(03):190.[doi:10.15986/j.1006-7930.2018.02.006]
[5]宋战平,张 强,赵克明,等.基于现场监测及数值分析的隧道双导洞超前施工优化研究[J].西安建筑科技大学学报(自然科学版),2018,50(05):654.[doi:10.15986/j.1006-7930.2018.05.006]
 SONG Zhanping,ZHANG Qiang,ZHAO Keming,et al.Optimization study of advanced double-drift tunnel construction based on on-site monitoring and numerical analysis[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2018,50(03):654.[doi:10.15986/j.1006-7930.2018.05.006]
[6]王家滨,牛荻涛.硝酸侵蚀喷射混凝土NO-3扩散研究[J].西安建筑科技大学学报(自然科学版),2019,51(01):75.[doi:10.15986/j.1006-7930.2019.01.012]
 WANG Jiabin,NIU Ditao.Study on nitrate ion diffusion of lining shotcrete exposed to nitric acid[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(03):75.[doi:10.15986/j.1006-7930.2019.01.012]
[7]黄金,赵淼.基于贝叶斯网络的隧道围岩失稳风险分析[J].西安建筑科技大学学报(自然科学版),2019,51(04):545.[doi:10.15986/j.1006-7930.2019.04.012]
 HUANG Jin,ZHAO Miao.Risk analysis of tunnel surrounding rock based on Bayesian network[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(03):545.[doi:10.15986/j.1006-7930.2019.04.012]
[8]周 文.下穿既有运营公路大断面浅埋隧道方案优选及监测分析[J].西安建筑科技大学学报(自然科学版),2020,52(04):520.[doi:10.15986-j.1006-7930.2020.04.008]
 ZHOU Wen.Scheme optimization and monitoring analysis of large section shallow buried tunnel on existing highway[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2020,52(03):520.[doi:10.15986-j.1006-7930.2020.04.008]
[9]刘彦涛.下穿寺庙隧道爆破振动影响的数值模拟与分析[J].西安建筑科技大学学报(自然科学版),2021,53(02):160.[doi:10.15986/j.1006-7930.2021.02.002]
 LIU Yantao.Numerical simulation and analysis of the influence of blasting vibration in the tunnel crossing under a temple[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2021,53(03):160.[doi:10.15986/j.1006-7930.2021.02.002]
[10]宋战平,王双院,苏春生,等.黄土地层浅埋小净距非对称断面隧道施工方案优化[J].西安建筑科技大学学报(自然科学版),2022,54(05):646.[doi:10.15986/j.1006-7930.2022.05.002 ]
 SONG Zhanping,WANG Shuangyuan,et al.Optimization of construction scheme for shallow buried tunnel with small spacing asymmetric section in loess stratum[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2022,54(03):646.[doi:10.15986/j.1006-7930.2022.05.002 ]

备注/Memo

备注/Memo:
收稿日期:2019-12-06 修改稿日期:2020-05-13
基金项目:国家自然科学基金项目(51608436); 陕西省自然科学基础研究计划(2018JQ5003); 陕西省教育厅专项科研项目(18JK0478)
第一作者:牛泽林(1978-),男,博士,讲师,主要从事岩土隧道与地下结构工程可靠性分析、设计和安全预警等教学服务工作.E-mail:niuzldq@xauat.edu.cn
更新日期/Last Update: 2020-07-30