参考文献/References:
[1] 郑俊杰, 包德勇, 龚彦峰, 等.铁路隧道下穿既有高速公路隧道施工控制技术研究[J]. 铁道工程学报,2006,23(8):80-84.
ZHENG Junjie, BAO Deyong, GONG Yanfeng,et al. Study on construction control technology of railway tunnel passing through existing highway tunnel[J]. Journal of Railway Engineering Society, 2006, 23(8):80-84.
[2] 曹成勇, 施成华, 彭立敏, 等.下穿高速公路的浅埋大跨隧道开挖力学行为分析[J]. 现代隧道技术,2017,54(5):122-129,154.
CAO Chengyong, SHI Chenghua, PENG Limin, et al. Analysis of the mechanical behaviors of shallow-Buried large-Span tunnels under expressways[J]. Modern Tunneling Technology, 2017,54(5):122-129,154.
[3] 朱正国,黄松,朱永全.铁路隧道下穿公路引起的路面沉降规律和控制基准研究[J].岩土力学,2012,33(2):558-563,576.
ZHU Zhengguo, HUANG Song, ZHU Yongquan. Study of road surface settlement rule and controlled criterion for railway tunnel undercrossing highway [J]. Rock and Soil Mechanics, 2012,33(2): 558-563,576.
[4] 张鹏,谭忠盛.浅埋隧道下穿公路引起的路面沉降控制基准[J].北京交通大学学报,2008,32(4):137-140.
ZHANG Peng, TAN Zhongsheng. Pavement settlement standard induced by shallow buried tunnel to under-traverse highway[J]. Journal of Beijing Jiao Tong University, 2008,32(4):137-140.
[5] 贾蓬,赵文,周佳俊,等.浅埋铁路隧道下穿高速公路施工方法比选[J].北京工业大学学报,2014,40(8):1256-1262.
JIA Peng, ZHAO Wen, ZHOU Jiajun, et al. Optimal analysis of excavation method of a shallow tunnel beneath expressway[J]. Journal of Beijing University of technology, 2014,40(8):1256-1262.
[6] 王万平,韩常领,李建斐.超浅埋小间距隧道穿越既有公路变形规律模拟研究[J]. 现代隧道技术,2013,50(2):94-101.
WANG Wanping, HAN Changling, LI Jianfei. Simulation study on the deformation law of a shallow-buried tunnel with small spacing that passes under an existing highway[J]. Modern Tunneling Technology, 2013,50(2):94-101.
[7] 胡守云.三明南铁路隧道下穿高速公路施工关键技术及道路安全防控措施[J].施工技术,2016,45(17),118-123.
HU Shouyun. The key construction technology and road safety prevention and control measures for sanming south railway tunnel underneath passing expressway[J]. Construction Technology, 2016,45(17),118-123.
[8] 叶 飞,丁文其,王国波,等.列车移动荷载对下穿公路隧道稳定性影响研究[J].岩土力学,2008,29(2):549-552.
YE Fei, DING Wenqi, WANG Guobo, et al. Influence of moving train load on stability of underlying highway tunnel [J]. Rock and Soil Mechanics,2008, 29(2):549-552.
[9] 吴占瑞,漆泰岳,唐进才.浅埋大断面隧道施工工法优化分析[J]. 工业建筑, 2012,49(8): 102-107.
WU Zhanrui, QI Taiyue, TANG Jincai. Optimization analysis of shallow-buried large section tunnel construction method[J]. Railway Engineering, 2012,49(8): 102-107.
[10]午向阳,蒋宗全,李鹏飞,等.大断面隧道下穿高速公路施工方案优化研究[J].铁道建筑,2010,50(11):40-42.
WU Xiangyang, JIANG Zongquan, LI Pengfei, et al Study on optimization of construction plan for large section tunnel under expressway[J]. Railway Engineering, 2010,50(11):40-42.
[11]唐明明,王芝银,李云鹏.穿越公路偏压小净距隧道施工方法探讨[J].岩土力学,2011,32(4):1163-1168.
TANG Mingming,WANG Zhiyin,LI Yunpeng. Study of construction methods for crossing bias small interval highway tunnel. [J]. Rock and Soil Mechanics, 2011,34(4):1163-1168.
[12]陈林杰,梁波,王国喜.浅埋暗挖超大断面地铁车站隧道开挖方法研究[J].地下空间与工程学报,2013,9(4):928-933.
CHEN Linjie, LIANG Bo, WANG Guoxi. Study of excavation method for shallow-buried subway station tunnels with super-large section [J]. Chinese Journal of Underground Space and Engineering, 2013,9(4):928-933.
[13]张顶立,李鹏飞,候燕娟,等.浅埋大断面软岩隧道施工影响下建筑物安全性控制的试验研究[J].岩石力学与工程学报,2009,28(1):95-102.
ZHANG Dingli, LI Pengfei, HOU Yanjuan, et al. Experimental study on safety control of building during construction of shallow-buried soft rock tunnel with large section. [J].Chinese Journal of Rock Mechanics and Engineering, 2009, 28(1):95-102.
[14]李健,谭忠盛,喻渝,等.下穿高速公路浅埋大跨度黄土隧道施工措施研究[J].岩土力学,2011,32(9):2803-2809.
LI Jian, TAN Zhongsheng, YU Yu, et al.Research on construction procedure for shallow large-span tunnel undercrossing highway [J]. Rock and Soil Mechanics,2011,32(9): 2803- 2809.
[15]杨广武,关龙,刘军,等.盾构法隧道下穿既有结构三维数值模拟分析[J].中国铁道科学,2009,30(6):54-60.
YANG Guangwu, GUAN Long, LIU Jun, et al. Three-dimensional numerical simulation analysis of the shield-driven tunnel crossing under the existing structure[J]. China Railway Science,2009.30(6):54-60.
[16]宋战平,王童,周建军,等. 浅埋偏压大断面隧道施工优化及受力特征分析[J].地下空间与工程学报,2017,13(2):459-468.
SONG Zhanping, WANG Tong, ZHOU Jianjun, et al. Analysis of construction optimization and mechanical characteristic of shallow large section tunnel[J]. Chinese Journal of Underground Space and Engineering, 2017,13(2):459-468.
相似文献/References:
[1]宋战平,刘 京,吴焕通,等.长陡斜井钢纤维喷射混凝土单层衬砌试验研究[J].西安建筑科技大学学报(自然科学版),2013,45(03):348.[doi:10.15986/j.1006-7930.2013.03.008]
SONG Zhan-ping,LIU Jing,WU Huan-Tong,et al.Experimental research on single-layer tunnel lining of steel fiber shotcrete and the application in motenlin deviated well[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2013,45(04):348.[doi:10.15986/j.1006-7930.2013.03.008]
[2]宋战平、,杨腾添,张丹锋,等.溶洞对隧道(洞)稳定性影响的数值试验及现场监测分析[J].西安建筑科技大学学报(自然科学版),2014,46(04):484.[doi:10.15986/j.1006-7930.2014.04.005]
SONG Zhanping YANG TengtianZHANG DanfengLI Ning.Experiments and field monitoring and analysis about the impact of existing cave on the stability of the tunnel[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2014,46(04):484.[doi:10.15986/j.1006-7930.2014.04.005]
[3]张新柳.基于超前预报信息的隧道围岩分级及工程应用研究[J].西安建筑科技大学学报(自然科学版),2016,48(05):648.[doi:10.15986/j.1006-7930.2016.05.006]
ZHANG Xinliu.Study on the classification and application of the tunnel s surrounding rock based on geological information forecast[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2016,48(04):648.[doi:10.15986/j.1006-7930.2016.05.006]
[4]宋战平,李世豪,张学钢,等.基于修正Peck法的隧道施工全地层变形规律研究[J].西安建筑科技大学学报(自然科学版),2018,50(02):190.[doi:10.15986/j.1006-7930.2018.02.006]
SONG ZhanpingLI ShihaoZHANG XuegangWANG JunbaoWANG Tao.Study on strata settlement regular pattern induced by[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2018,50(04):190.[doi:10.15986/j.1006-7930.2018.02.006]
[5]宋战平,张 强,赵克明,等.基于现场监测及数值分析的隧道双导洞超前施工优化研究[J].西安建筑科技大学学报(自然科学版),2018,50(05):654.[doi:10.15986/j.1006-7930.2018.05.006]
SONG Zhanping,ZHANG Qiang,ZHAO Keming,et al.Optimization study of advanced double-drift tunnel construction based on on-site monitoring and numerical analysis[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2018,50(04):654.[doi:10.15986/j.1006-7930.2018.05.006]
[6]王家滨,牛荻涛.硝酸侵蚀喷射混凝土NO-3扩散研究[J].西安建筑科技大学学报(自然科学版),2019,51(01):75.[doi:10.15986/j.1006-7930.2019.01.012]
WANG Jiabin,NIU Ditao.Study on nitrate ion diffusion of lining shotcrete exposed to nitric acid[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(04):75.[doi:10.15986/j.1006-7930.2019.01.012]
[7]黄金,赵淼.基于贝叶斯网络的隧道围岩失稳风险分析[J].西安建筑科技大学学报(自然科学版),2019,51(04):545.[doi:10.15986/j.1006-7930.2019.04.012]
HUANG Jin,ZHAO Miao.Risk analysis of tunnel surrounding rock based on Bayesian network[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(04):545.[doi:10.15986/j.1006-7930.2019.04.012]
[8]牛泽林,刘朝鹏,郑 蕾,等.大断面公路板岩隧道开挖与支护数值模拟研究[J].西安建筑科技大学学报(自然科学版),2020,52(03):376.[doi:10.15986/j.1006-7930.2020.03.010]
NIU ZeLin,LIU Chaopeng,ZHENG Lei,et al.Numerical simulation study on excavation and support of slab tunnel in large section highway[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2020,52(04):376.[doi:10.15986/j.1006-7930.2020.03.010]
[9]刘彦涛.下穿寺庙隧道爆破振动影响的数值模拟与分析[J].西安建筑科技大学学报(自然科学版),2021,53(02):160.[doi:10.15986/j.1006-7930.2021.02.002]
LIU Yantao.Numerical simulation and analysis of the influence of blasting vibration in the tunnel crossing under a temple[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2021,53(04):160.[doi:10.15986/j.1006-7930.2021.02.002]
[10]宋战平,王双院,苏春生,等.黄土地层浅埋小净距非对称断面隧道施工方案优化[J].西安建筑科技大学学报(自然科学版),2022,54(05):646.[doi:10.15986/j.1006-7930.2022.05.002
]
SONG Zhanping,WANG Shuangyuan,et al.Optimization of construction scheme for shallow buried tunnel with small spacing asymmetric section in loess stratum[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2022,54(04):646.[doi:10.15986/j.1006-7930.2022.05.002
]