参考文献/References:
[1]薛伟辰, 胡翔. 预制混凝土剪力墙结构体系研究进展[J]. 建筑结构学报, 2019, 40(2):44-55.
XUE Weichen, HU Xiang. State of the art of studies on precast concrete shear wall structures[J]. Journal of Building Structures, 2019, 40(2):44-55.
[2]中华人民共和国住房和城乡建设部.装配式混凝土建筑技术标准: GB/T 51231—2016[S]. 北京: 中国建筑工业出版社,2016.
Minsty of HURD of China. Technical standard for assembled buildings with concrete structure: GB/T 51231—2016[S].Beijing: China Architecture & Building Press,2016.
[3]刘硕,胡翔,周鑫,薛伟辰.直径10mm和14mm钢筋约束搭接连接力学性能试验研究[J]. 施工技术, 2017, 46(4):13-17.
LIU Shuo, HU Xiang, ZHOU Xin, et al. Test of mechanical properties of constraint lap connection of steel bars[J]. Construction Technology, 2017, 46(4):13-17.
[4]JIANG J, LUO J, XUE W, et al. Seismic performance of precast concrete double skin shear walls with different vertical connection types[J]. Engineering Structures, 2021, 245: 112911. 1-13.
[5]JIANG J, XUE W, LUO J, et al. Hysteresis behavior of precast concrete composite shear walls with improved vertical connections[J]. Structures, 2022, 36: 533-548.
[6]EINEA A, YEHIA S, TADROS M K. Lap splices in confined concrete[J]. ACI-Structural Journal, 1999, 96(6): 947-955.
[7]马军卫,尹万云,刘守城,等. 钢筋约束浆锚搭接连接的试验研究[J]. 建筑结构, 2015,2:32-35,79.
MA Junwei, YIN Wanyun, LIU Shoucheng, et al. Experimental study on constraint grout-filled lap connection of steel bar[J]. Building Structure, 2015,2:32-35,79.
[8]张海顺. 预制混凝土结构插入式预留孔灌浆钢筋锚固搭接试验研究[D].哈尔滨:哈尔滨工业大学, 2009.
ZHANG Haishun. Experimental study of plug-in filling hole for lap-joint of steel bar of PC concrete structure[D]. Harbin: Harbin Institute of Technology, 2009.
[9]赵培. 约束浆锚钢筋搭接连接试验研究[D]. 哈尔滨:哈尔滨工业大学, 2011.
ZHAO Pei. Experimental research on restraint grouting-anchoring overlap-joint of steel bar[D]. Harbin: Harbin Institute of Technology, 2011.
[10]倪英华. 约束浆锚连接极限搭接长度试验研究[D]. 哈尔滨:哈尔滨工业大学,2014.
NI Huaying. Experimental research on the ultimate lap length of the restraint grouting-anchoring overlap-joint of steel bar[D]. Harbin: Harbin Institute of Technology, 2014.
[11]江佳斐, 隋凯, 马川峰; 等. 预制装配式混凝土螺旋箍筋约束浆锚钢筋搭接性能研究现状[J], 施工技术, 2018(12): 44-47.
JIANG Jiafei, SUI Kai, MA Chuanfeng, et al. Review of grout-filled rebar splicing confined by spiral stirrups for precast concrete[J]. Construction Technology, 2018(12): 44-47.
[12]American Concrete Institute(ACI). Bond and development of straight reinforcing bars in tension: ACI 408R-03[S]. MI:Farmington Hills, 2003.
[13]北京市规划委员会. 装配式剪力墙结构设计规程: DB11/1003—2013[S]. 北京:中国建筑工业出版社,2014.
Beijing Planning Commission. Design specification for precast concrete shear wall structure: DB11/1003—2013[S]. Beijing: China Architecture and Building Press, 2014.
[14]黑龙江省住房和城乡建设厅. 预制装配整体式房屋混凝土剪力墙结构技术规范: DB23/T1813—2016[S]. 哈尔滨:哈尔滨工业大学出版社, 2016.
Heilongjiang Provincial Department of Housing and Urban-Rural Development. Technical specification for concrete shear wall structure assembled with precast components: DB23/T1813—2016[S]. Harbin: Harbin Institute of Technology Press, 2016.
[15]SAGAN V, GERGELYE P, WHITE R N. Behavior and design of noncontact lap splices subjected to repeated inelastic tensile loading[R]. Report No. 858-5. Ithaca:Department of Structural Engineering Research, Cornell University, 1988.
[16]徐有邻, 沈文都. 钢筋砼粘结锚固性能的试验研究[J]. 建筑结构学报, 1994, 15(3): 26-37.
XU Youlin, SHEN Wendu. Experimental study on bond anchorage performance of reinforced concrete[J]. Journal of Building Structures, 1994, 15(3): 26-37.
[17]高丹盈, 陈刚, Hadi Muhammad Najib Sadraddin,等. 钢筋与钢纤维混凝土的黏结-滑移性能及其关系模型[J]. 建筑结构学报, 2015, 36(7):132-139.
GAO Danying, CHEN Gang, Hadi Muhammad Najib Sadraddin, et al. Bond-slip behavior and constitutive model between rebar and steel fiber reinforced concrete[J]. Journal of Building Structures, 2015, 36(7):132-139.