参考文献/References:
[1]高颖,傅学怡,杨想兵,等.杭州奥体博览城网球中心结构设计研究综述[J].建筑结构学报,2017,38(1):1-11.
GAO Ying, FU Xueyi, YANG Xiangbing, et al. Research on structural design of the Hangzhou Olympic Tennis Center[J].Journal of Building Structures, 2020, 50(S2):168 -173.
[2]傅学怡,杨想兵,高颖,等.杭州奥体博览城网球中心钢结构移动屋盖设计关键技术[J].建筑结构学报,2017,38(1):12-20.
FU Xueyi, YANG Xiangbing, GAO Ying, et al. Key design points on movable steel structure roof of the Hangzhou Olympic Tennis Center[J].Journal of Building Structures, 2017,38(1):12-20.
[3]王雷,董全利,张月月,等.杭州奥体中心室内网球馆结构设计[J].建筑结构,2020,50(S2):168-173.
WANG Lei, DONG Quanli, ZHANG Yueyue, et al. Structural design of indoor tennis hall of Hangzhou Olympic Sports Center[J]. Building Structures, 2020, 50(S2):168-173.
[4]游桂模,谢董恩,周观根,等.杭州奥体中心亚运三馆体育游泳馆施工过程分析[J].钢结构(中英文),2020,35(10):9-14.
YOU Guimo, XIE,Dongen ZHOU Guangen, et al. Analysis of Construction Process for Gymnasium and Natatorium of Hangzhou Olympic Sports Cente[J]. Steel Construction. 2020,35(10):9-14.
[5]何伟,谢董恩,郭振华,等.杭州奥体中心综合训练馆钢结构施工关键技术[J].钢结构(中英文),2020,35(10):15-21.
HE Wei, XIE Dongen, GUO Zhenhua, et al. Key technology of steel structure construction of comprehensive training hall of Hangzhou Olympic Sports Center[J]. Steel Construction. 2020,35(10):15-21.
[6]周观根,张珈铭,刘坚,等.杭州奥体博览中心主体育场钢结构施工模拟分析[J].施工技术,2014,43(8):1-5.
ZHOU Guangen, ZHANG Jiaming, LIU Jian, et al. Construction simulation analysis on steel structure for main stadium of Hangzhou Olympic and International Expo Center[J]. Construction Technology. 2014, 43(8):1-5.
[7]周观根,游桂模,沈晓飞,等.杭州奥体网球中心开合屋盖施工关键技术[J].空间结构,2021,27(2):65-69.
ZHOU Guangen, YOU Guimo, SHEN Xiaofei, et al. Key construction technology of retractable roof structure of Hangzhou Olympic Tennis Center[J]. Spatial Structrures, 2021,27(2):65-69.
[8]周观根,万敬新,游桂模,等.杭州奥体网球中心开合屋盖施工过程分析[J].空间结构,2021,27(2):70-76.
ZHOU Guangen, WAN Jinxin, YOU Guimo, et al. Analysis of construction process of retractable roof structure of Hangzhou Olympic Tennis Center[J]. Spatial Structrures, 2021,27(2):70-76.
[9]王哲,白光波,陈彬磊,等.国家速滑馆钢结构设计[J].建筑结构,2018,48(20):5-11.
WANG Zhe, BAI Guangbo, CHEN Binlei, et al. Steel structural design of National Speed Skating Oval[J]. Building Structures, 2020, 50(S2): 168-173.
[10]奚琦. 国家速滑馆屋盖结构选型和施工方案模拟分析研究[D].北京:北京建筑大学,2020.
QI.Xi Roof structure selection and simulation analysis of construction scheme for the National Speed Skating Oval[D]. Beijing:Beijing University of Civil Engineering and Architecture, 2020.
[11]白光波,王哲,陈彬磊,等.国家速滑馆索网结构形态分析关键问题研究[J].钢结构(中英文),2020,35(7):54-61.
BAI Guangbo, WANG,Zhe CHEN Binlei, et al. Key issues in cable net form-finding of the National Speed Skating Oval[J]. Steel Construction,2020,35(7):54-61.
[12]王哲,朱忠义,王玮,等.国家速滑馆施工误差对索结构预应力偏差的影响研究[J].建筑结构,2021,51(19):111-115.
WANG Zhe, ZHU Zhongyi, WANG Wei, et al. Research on the influence of construction error for prestress deviation in cable structure of National Speed Skating Oval[J]. Building Structures,2021,51(19):111-115.
[13]闫国军,刘青云,赵启元,等.国家速滑馆比赛大厅建筑声学设计与实测分析[J].建筑科学,2022,38(4):259-264
YAN Guojun, LIU Qingyun, ZHAO Qiyuan, et al. Architectural acoustic design and measurement of the competition hall of the National Speed Skating Oval[J]. Building Science, 2022,38(4):259-264
[14]刘洁.国家速滑馆智慧场馆设计探讨[J].建筑电气,2022,41(2):3-10.
LIU Jie. Discussion on intelligent venue design of National Speed Skating Oval[J]. Building Electricity,2022, 41(2): 3-10.
[15]张英坤. 基于WSN的西安奥体中心体育场健康监测系统研究及应用[D].西安:西安建筑科技大学,2020.
ZHANG Yingkun. Research and Application of health monitoring system of Xi'an Olympic Sports Center Stadium based on WSN[D]. Xi'an:Xi'an Univ. of Arch. & Tech.,2020.
[16]隋庆海,张亚伟.西安奥体中心体育馆结构设计及若干技术介绍[J].建筑钢结构进展,2020,22(6):136-142.
SUI Qinghai, ZHAGN Yawei. Structrual design and technology introduction of the stadium of Xi'an Olympic Sports Center[J].Progress in Steel Building Structures, 2020, 22(6):136-142.
相似文献/References:
[1]田黎敏,郝际平,郑 江,等.大跨度复杂钢结构施工力学模拟的研究与应用[J].西安建筑科技大学学报(自然科学版),2012,44(03):324.[doi:10.15986/j.1006-7930.2012.03.004]
TIAN Li-min,HAO Ji-ping,ZHENG Jiang,et al.Study and application of mechanical simulation of large-span complex steel structure in construction process[J].J. Xi'an Univ. of Arch. & Tech.(Natural Science Edition),2012,44(04):324.[doi:10.15986/j.1006-7930.2012.03.004]
[2]丁大益,郑 岩,马冬霞,等.合肥新桥国际机场航站楼结构设计[J].西安建筑科技大学学报(自然科学版),2013,45(01):18.[doi:10.15986/j.1006-7930.2013.01.004]
[3]计康生,谢 坚,王明花,等.天长全民健身中心体育场钢屋盖结构铸钢节点施工阶段力学性能分析[J].西安建筑科技大学学报(自然科学版),2024,56(04):571.[doi:10.15986/j.1006-7930.2024.04.011]
JI Kangsheng,XIE Jian,WANG Minghua,et al.Mechanical properties analysis of cast steel joints in the construction stage of the steel roof structure of Tianchang national fitness center stadium[J].J. Xi'an Univ. of Arch. & Tech.(Natural Science Edition),2024,56(04):571.[doi:10.15986/j.1006-7930.2024.04.011]