[1]田黎敏,郝际平,郑 江,等.大跨度复杂钢结构施工力学模拟的研究与应用[J].西安建筑科技大学学报:自然科学版,2012,44(03):324-330.[doi:10.15986/j.1006-7930.2012.03.004]
 TIAN Li-min,HAO Ji-ping,ZHENG Jiang,et al.Study and application of mechanical simulation of large-span complex steel structure in construction process[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2012,44(03):324-330.[doi:10.15986/j.1006-7930.2012.03.004]
点击复制

大跨度复杂钢结构施工力学模拟的研究与应用()
分享到:

西安建筑科技大学学报:自然科学版[ISSN:1006-7930/CN:61-1295/TU]

卷:
44
期数:
2012年03期
页码:
324-330
栏目:
出版日期:
2012-06-30

文章信息/Info

Title:
Study and application of mechanical simulation of large-span complex steel structure in construction process
文章编号:
1006-7930(2012)03-0324-07
作者:
田黎敏12郝际平12郑 江1王先铁1钟炜辉1
(1.西安建筑科技大学土木工程学院,陕西 西安 710055;2.西部建筑科技国家重点实验室 筹 ,陕西 西安 710055)
Author(s):
TIAN Li-min12 HAO Ji-ping12 ZHENG Jiang1 WANG Xian-tie1 ZHONG Wei-hui1
(1.School of Civil Engineering, Xian Univ. of Arch. & Tech., Xian 710055,China; 2.State Key Laboratory of Architecture Science and Technology in West China(XAUAT), Xian 710055, China)
关键词:
大跨度钢结构施工力学力学模拟有限单元法
Keywords:
large-span steel structure construction mechanics mechanics simulation finite element method
分类号:
TU393.3
DOI:
10.15986/j.1006-7930.2012.03.004
文献标志码:
A
摘要:
随着我国经济的发展,大跨度空间钢结构的形式也日趋复杂,施工过程对结构的影响不能忽略.结构施工过程中的力学问题属于施工力学的范畴,是耦合了时间与空间的四维分析.采用施工力学方法对三个大跨度复杂钢结构工程进行施工过程跟踪模拟分析,同时将有限元计算结果同实际监测结果进行对比.研究表明:进行施工过程模拟分析不仅可以优化施工方案,而且可以保证施工过程中结构的安全并使成型结构的内力和变形满足设计要求.在此基础上,给出一些关于大跨度复杂钢结构施工的建议和意见,为施工力学学科的研究和发展提供了参考
Abstract:
Following the economic development, the large-span spatial structure tends to become more and more complex. The impact of construction process cannot be neglected. The construction mechanic combined with structure mechanic and construction technology. It is necessary to analyze the internal force and deformation of three large-span complex steel structures in the construction process by using the method of construction mechanics. The result from theory and practice were compared. The analytical results show that construction mechanic can be used in selecting and guiding the construction to guarantee the construction safety. On this basis, the paper also gives some suggestions and comments about construction of the large-span complex structure. These results provide a reasonable basis for the further development of construction mechanics and engineering application

参考文献/References:

[1] 王光远.论时变结构力学[J].土木工程学报,2000,33(6):105-108.
WANG Guang-yuan.On Mechanics of time-varying structure[J].China Civil Engineering Journal,2000,33(6):105-108.
[2] 曹志远.土木工程分析的施工力学与时变力学基础[J].土木工程学报,2001,34(3):41-45.
CAO Zhi-yuan.Construction mechanics and time-varying mechanics in civil engineering[J].China Civil Engineering Journal,2001,34(3):41-45.
[3] CHOI C K,KIM E D.Multistory frames under sequential gravity loads[J].Journal of Structural Engineering,ASCE,1985,111(11):2373-2384.
[4] CHOI C K,CHUNG H K,LEE D G,et al.Simplified building analysis with sequential dead loads-CFM[J].Journal of Structural Engineering,ASCE,1992,188(4):944-954.
[5] 范 重,刘先明,胡天兵,等.国家体育场钢结构施工过程模拟分析[J].建筑结构学报,2007,28(4):134-143.
FANG Zhong,LIU Xian-ming,Hu Tian-bing,et al.Simulation analysis on steel structure erection procedure of the National Stadium[J].Journal of Building Structures,2007,28(4):134-143.
[6] 崔晓强,郭彦林,叶可明.大跨度钢结构施工过程的结构分析方法研究[J].工程力学,2006,23(5):83-88.
CUI Xiao-qiang,GUO Yan-lin,YE Ke-ming.Research on the construction mechanics method of long-span steel structure[J].Engineering Mechanics,2006,23(5):83-88.
[7] 刘学武,郭彦林,张庆林,等.CCTV新台址主楼施工过程结构内力和变形分析[J].工业建筑,2007,37(9):22-29.
LIU Xue-wu,GUO Yan-lin,ZHANG Qing-lin,et al.Analysis of internal force and deformation for the new CCTV headquarters during the construction process[J].Industrial Construction,2007,37(9):22-29.
[8] 郭彦林,崔晓强.大跨度复杂钢结构施工过程中的若干技术问题及探讨[J].工业建筑,2004,34(12):1-5.
GUO Yan-lin,CUI Xiao-qiang.Key mechanical problems and their discussion in construction process of larger-span steel structures[J].Industrial Construction,2004,34(12):1-5.
[9] 郭彦林,刘学武.钢结构施工力学状态非线性分析方法[J].工程力学,2008,25(10):19-24.
GUO Yan-lin,LIU Xue-wu.State nonlinear finite element method for construction mechanics analysis of steel structure[J].Engineering Mechanics,2008,25(10):19-24.
[10] 郝际平,郑 江,王先铁,等.大运会主体育场施工过程力学模拟与分析[J].西安建筑科技大学学报:自然科学版,2010,42(4):457-463.
HAO Ji-ping,ZHENG Jiang,WANG Xian-tie,et al.Mechanic simulation and analysis of the main palaestra of the world university games during the construction process[J].J.Xi′an Univ.of Arch.& Tech.:Natural Science Edition,2010,42(4):457-463.
[11] 田黎敏,郝际平,陈 韬,等.世界大学生运动会主体育场施工过程模拟分析[J].建筑结构学报,2011,32(5):70-77.
TIAN Li-min,HAO Ji-ping,CHEN Tao,et al.Simulation analysis on erection procedure of main stadium for the Universidad Sports Centre[J].Journal of Building Structures,2011,32(5):70-77.
[12] 田黎敏,郝际平,戴立先,等.深圳湾体育中心结构施工过程模拟分析[J].建筑结构,2011,41(12):118-121.
TIAN Li-min,HAO Ji-ping,DAI Li-xian,et al.Simulation analysis on erection procedure of Shenzhen bay sports center[J].Building Structures,2011,41(12):118-121.

相似文献/References:

[1]丁大益,郑 岩,马冬霞,等.合肥新桥国际机场航站楼结构设计[J].西安建筑科技大学学报:自然科学版,2013,45(01):18.[doi:10.15986/j.1006-7930.2013.01.004]
[2]钱 刚,计康生,谢 坚,等.天长全民健身中心体育场钢结构屋盖施工过程分析[J].西安建筑科技大学学报:自然科学版,2022,54(04):617.[doi:10.15986/j.1006-7930.2022.04.017]
 QIAN Gang,JI Kangsheng,XIE Jian,et al.Analysis on construction process of steel structure roof of Tianchang national fitness center stadium[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2022,54(03):617.[doi:10.15986/j.1006-7930.2022.04.017]

备注/Memo

备注/Memo:
收稿日期:2011-09-22 修改稿日期:2012-05-14
基金项目:国家自然科学基金资助项目(51178381);高等学校博士学科点专项科研基金(20096120110004)
作者简介:田黎敏(1983-),男,山西太原人,博士研究生,从事结构工程方面的研究.
更新日期/Last Update: 2015-09-01