参考文献/References:
References
[ 1] Bennett J , Po thecar y E , Robinso G .Desig ning and Building a Wo rld-Class I ndustry .Center for Str ategic Studie s in
Constructio n[ R] .Reading , UK, 1996 .
[ 2] Bea rd J , Lo ulakis M , Wundram EC .Desig n-Build :Planning thr ough Development[ R] .Mcg raw-Hill , 2001 .
[ 3] Pinnacleo ne Pulse .Public Ow ner s Use Alte rnative Deliv ery Methods Co nstr uctio n Bulletin[ R] .Reed Business I n-
fo rmatio n, US , Divisio n o f Reed Elsev ier I nc , 2005.
[ 4] Lædre O, Austeng K , Haugen TI , Klakeg g OJ .Procurement Ro utes in Public Building and Constructio n Pro jects
[ J] .Jour nal of Constructio n Engineering and Management , ASCE , 2006 , 132(7):689-696 .
[ 5] Eaves WM , Laubach PB.Managing Ho spital De sig n and Construction Pro g rams[ R] .The Foundatio n of the American
Co llege o f Healthca re Executives , Chicag o , 1987:73-81 .
[ 6] Go rdon CM .Choo sing Appro priate Constructio n Contr acting Method[ J] .Journal of Constructio n Enginee ring and
Ma nag ement , ASCE , 1994, 120(1):196-210 .
[ 7] Uhlik FT , Elle r MD.Alternative Deliver y Appro aches fo r Milita ry Medical Co nst ruc tion Pro jects[ J] .Jour nal o f
Ar chitec ture Engineering , 1999 , 5(4):149-155.
[ 8] H ashim M , Chan M YL , Ng CY , et al.Facto rs Influe ncing the Selectio n o f Pro curement Sy stems by Clients[ C] ∥
I nter national Conference o n Co nstr uction Industry , Padang , Indonesia , 2006.
[ 9] Ratna sabapa thy S , Rameezdeen R, Lebbe NA .Ex plor atory S tudy of Ex ternal Envir onmental Factor s Influencing
the Pr ocurement Selectio n in Co nstructio n[ J] .Journal of Co nstruction Engineering and M anag eme nt , ASCE, 2004,
130(1):153-155.
[ 10] Lo T Y, Fung IWH , Tung KCF .Co nstruction Delay s in Hong Kong Civil Eng ineering Pro jects[ J] .Jour nal o f
Constructio n Engineering and Ma nag eme nt , ASCE , 2006, 132(6):636-649 .
[ 11] Okpala DC , Aniekwu AN .Causes of High Co sts of Construction in Nig eria[ J] .Jour nal o f Constructio n Eng ineering
and Manag ement , ASCE, 1988 , 114(2):233-244 .
[ 12] 《中国建筑业改革与发展研究报告》编写组.中国建筑业改革与发展研究报告(2008)[ M] .北京:中国建筑工业出
版社, 2008 .
The com piling gr oup.Re po rt of Chine se Co nstruction Industry Refo rm and Dev elo pment (2008)[ M] .Beijing :
China Building Industry Pre ss , 2008.
相似文献/References:
[1]张勇,刘杰,李慧民,等.EPC总承包模式下各因素对项目绩效的影响程度评价[J].西安建筑科技大学学报:自然科学版,2015,47(01):77.[doi:10.15986/j.1006-7930.2015.01.015]
ZHANG Yong,LIU Jie,LI Huimin.Influence degree evaluation of various factors on the project performance based on EPC model[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(02):77.[doi:10.15986/j.1006-7930.2015.01.015]
[2]刘 迅,王卓甫.基于FOWGA 算子的建设工程交易模式决策研究[J].西安建筑科技大学学报:自然科学版,2014,46(01):56.[doi:10.15986/j.1006-7930.2014.01.011]
LIU Xun,WANG Zhuofu.Research on project delivery systems decision method based on FOWGA operator[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2014,46(02):56.[doi:10.15986/j.1006-7930.2014.01.011]