参考文献/References:
[1] 王 燕.钢结构半刚性梁柱节点连接的杠杆力分析与计算[J],工业建筑,2004,34(7):70-72.
WANG Yan,Analysis on prying force of semi-rigid beam-column connections of steel structure[J].Industrial Construction,2004,34(7):70-72.
[2] 王 燕,侯兆欣,郑 杰.高强螺栓连接考虑杠杆力作用的设计方法[J].建筑钢结构进展,2007,9(2):27-33.
WANG Yan,HOU Zhao-xin,ZHENG Jie,Design method for high-strength bolt connection considering prying action[J].Progress in Steel Building Structures,2007,9(2):27-33.
[3] 王 燕,郑 杰.高强螺栓端板连接的撬力分析与研究[J].工业建筑,2008,38(9):99-103.
WANG Yan,ZHENG Jie.Study on the prying force of high strength bolt in extended end-plate connection[J].Industrial Construction,2008,38(9):99-103.
[4] 王 燕.钢结构半刚性连接设计理论及其工程应用[M].北京:中国建筑工业出版社,2011.
WANG Yan,Design theory and engineering application of semi-rigid connections in steel structure[M].Beijing:China Architecture and Building Press,2011.
[5] WANG Xian-tie,HAO Jiping,SUN Tong.Study on the seismic behaviour of through-bol-t end plate moment connections for concrete-filled steel tube column[J].J.Xi′an Univ.of Arch.&Tech.:Natur al Science Edition,2007,39(4):512-519.
[6] European Committee for Standardisation(CEN).Eurocode 3,Design of Steel Structures,Part 1.8:Design of Joints[S].Brussels:prEN 1993-1-8,2008.
[7] American Institute of Steel Construction.Manual of Steel Construction LRFD(Second Edition),VolumnⅡ[S].Chicago:American Institute of Steel Construction,2003.
[8] 中华人民共和国建设部,GB50017-2003钢结构设计规范[S].北京:中国计划出版社.2003.
The ministry of construction of the peoples republic of China,GB50017-2003Code for design of steel structures[S].Beijing:China Planning Press,2003.
[9] 陈绍蕃.钢结构设计原理[M].北京:科学出版社,2001.
CHEN Shao-fan.Design Principles of Steel Structure[M].Beijing:Science Press,2001.
[10] 中国建筑金属结构协会建筑钢结构委员会,中国建筑标准设计研究院.CECS 102:2002门式刚架轻型房屋钢结构技术规程[S].北京:中国计划出版社.2003.
Construction steel structure committee of China Construction Metal Structure Association,China Institute Of Building Standard Design And Research.CECS 102:2002Technical specification for steel structure of light-weight buildings with gabled frames[S].Beijing:China Planning Press,2003.
[11] 中华人民共和国住房和城乡建设部,JGJ82-2011钢结构高强度螺栓连接技术规程[S].北京:中国计划出版社,2011.
Ministry of Housing and Urban-Rural Development of the People’s Republic of China,JGJ82-2011Technical specification for high strength bolt connections of steel structures[S].Beijing:China Planning Press,2011.
[12] AGERSKOV H.High-strength bolted connections subject to prying[J].Journal of the Structural Division,ASCE,1976,102(1):161-175.
[13] AGERSKOV H.Analysis of bolted connections subject to prying[J].Journal of the Structural Division,ASCE,1977,103(11):2145-2163.
[14] 王 萌,王 燕,柴 昶,等.欧洲规范EC3高强螺栓等效T形件的有效长度及承载力研究[J].建筑钢结构进展,2009,11(3):58-62.
WANG Meng,WANG Yan,CHAI Chang,et al.Effective length of an equivalent T-stub for high-strength bolted connections in EC3and study on the resistance[J].Progress in Steel Building Structures,2009,11(3):58-62.
[15] STRUIK J H A,DE BACK J.Tests on bolted T-stubs with respect to bolted beam-to-column connections[R].The Netherlands:Report6-69-13,Stevin Laboratory,Delft University of Technology,Delft,1969.
相似文献/References:
[1]焦晋峰,刘展翔,刘 丹,等.预紧力缺失对8.8级M24高强度螺栓常幅疲劳性能影响分析[J].西安建筑科技大学学报:自然科学版,2022,54(01):35.[doi:10.15986/j.1006-7930.2022.01.005
]
JIAO Jinfeng,LIU Zhanxiang,LIU Dan,et al.Analysis of the influence of the pre-tension loss on the constant-amplitude fatigue performance of grade 8.8 M24 high-strength bolts[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2022,54(01):35.[doi:10.15986/j.1006-7930.2022.01.005
]