参考文献/References:
[1] 胡 振,刘 华,金维兴.PPP项目范式选择与风险分配的关系研究[J].土木工程学报,2011,44(9):139-146.
HU Z,LIU H,JIN W X.Study of the relationship between PPP project mode and risk allocation[J].China Civil Engineering journal,2011,44(9):139-146.
[2] 日本PFI/PPP协会.PFI年鉴[M].东京:日本PFI/PPP协会,2010.
Japan PFI/PPP institute.Japan PFI yearbook[M].Tokyo:Japan PFI/PPP institute,2010.
[3] 长 杪,林 挺.我国城市污水处理厂BOT项目建设现状分析[J],给水排水,2006(2):101-106.
CHANG M,LIN T.The analysis of the status Quo of the urban sewage treatment plant BOT project construction[J].Water & Wastewater Engineering,2006(2):101-106.
[4] 陈炳泉,侯祥朝,许叶林,等.PPP污水处理项目关键风险因素探讨———泉州某污水处理项目实践[J].建筑经济,2009(4):40-43.
CHEN B Q,HOU X C,XU Y L,et al.Analysis of critical risk factors for PPP sewage treatment projects based on a sewage treatment project in Quanzhou[J].Construction Economy,2009(4):40-43.
[5] 大西正光,坂东弘,小林潔司.PFI项目形态选择的理论研究[C].第27届土木计划学研究发表会.2003.
ONISHI M,BANDO H,KOBAYASHI K.Theoretical analysis of the ownership structure in PFI Projects[C].27th Civil Engineering Plan Subject Research and Conference,2003.
[6] 亓霞,柯永建,王守清.基于案例的中国PPP项目的主要风险因素分析[J].中国软科学,2009(5):107-113.
QI X,KE Y J,WANG S Q.Analysis on critical risk factors causing the failures of Chinas PPP project[J].China Soft Science Magazine,2009(5):107-113
[7] LI B,AKINTOYE A,EDWARDS P J,HARDCASTLE C.Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK[J].Construction and Architectural
Management,2005,12(2):125-148;
[8] SALMAN A F M,SKIBIEWSKI M J,BASHA I.BOT viability model for large-Scale infrastructure projects[J].Journal of Construction Engineering and Management,2007,1:50-64;
[9] 胡 振.公私合作项目范式选择研究——以日本案例为研究对象[J].公共管理学报,2010,7(3):113-121.
HU Z.Study of mode selection of public-private partnerships(PPP)projects——a case study of Japan[J].Journal of Public Management,2010,7(3):113-121.
相似文献/References:
[1]胡 振.公共项目公私合作(PPP)控制权配置的决策模型[J].西安建筑科技大学学报:自然科学版,2012,44(01):90.[doi:10.15986/j.1006-7930.2012.01.015]
HU Zhen.The decision model of the allocation of control rights in public-private partnerships projects[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2012,44(04):90.[doi:10.15986/j.1006-7930.2012.01.015]