参考文献/References:
References
[1]连民杰. 矿山灾害治理与应急处置技术[M]. 北京:气象出版社, 2012.
LIAN Minjie. Mine disaster management and emergency disposal technology [M]. Beijing: Meteorological Press, 2012 .
[2]孙玉科. 中国露天矿边坡稳定性研究[M]. 北京: 中国科学技术出版社, 1999.
SUN Yuke. China open -pit mine slope stability study[M].Beijing: China Science and Technology Press, 1999.
[3]陈祖煜,弥宏亮,汪小刚. 边坡稳定三维分析的极限平衡方法[J]. 岩土工程学报, 2001, 23(5): 525-529.
CHEN Zuyu, MEI Hongliang, WANG Xiaogang. The limit equilibrium method for three -dimensional analysis of slope stability [J]. Journal of Geotechnical Engineering, 2001, 23(5): 525 -529.
[4]李俊平,范才兵,李占科,等. 露天矿最终边坡角的数值模拟研究[J]. 安全与环境学报,2011(5): 175-179.
LI Junping, FAN Caibing, LI Zhanke, et al. Numerical simulation model for determining the final sloping angle of the open -cast molybdenum mine [J]. Journal of Safety and Environment , 2011(5): 175 -179
[5]范才兵,李占科,王学明. 露天矿最终边坡角的简易数值模拟方法[J]. 金属矿山,2012(7): 59-63.
FAN Caibing, LI Zhanke, WANG Xueming. Numerical simulation on the final sloping angle of the open -cast mine [J]. Metal Mine, 2012(7): 59 -63.
[6]梁元贵,刘关锋. 易门铜厂铜矿露天开采最终边坡角分析[J]. 采矿技术,2010(1): 31-32.
LIANG Yuangui, LIU Guanfeng. The Yimen copper mine copper open -pit mining final slope angle analysis [J]. Mining Technology, 2010(1): 31 -32.
[7]任强,刘伟韬. 覆岩采动裂隙带发育规律的数值模拟分析[J]. 安全与环境学报,2006(S1): 75-78.
REN Qiang, LIU Weitao. Numerical simulation analysis of overburden crack belt developing disciplinary [J]. Journal of Safety and Environment, 2006(S1): 75-78.
[8]冯锦艳,王金安,蔡美峰. 露天高陡边坡角优化设计及稳定性分析[J]. 中国矿业,2005(4): 45-48.
FENG Jinyan, WANG Jin′an, CAI Meifeng. Optimization design and stability of high steep open pit slope angle [J]. China Mining Magazine, 2005(4): 45 -48.
[9]孙书伟,林杭,任连伟. FLAC3D 在岩土工程中的应用[M]. 北京:中国水利水电出版社,2011: 119-120.
SUN Shuwei, LIN Hang, REN Lianwei. Application of FLAC3D in geotechnical engineering [M]. Beijing: China Water & Power Press, 2011: 119 -120.
[10]李俊平,程贤根,李鹏伟,等. 露天矿最终边坡角的快速拉格朗日有限差分法研究[J]. 安全与环境学报,2015(2): 77-82.
LI Junping, CHENG Xiangen, LI Pengwei, et al. Research on the final sloping angle of open -pit mine by fast Lagrange finite difference method [J]. Journal of Safety and Environment, 2015(2): 77 -82.
[11]李俊平,张浩,李鹏伟. 毕机沟露天矿岩体力学参数折减系数的数值模拟确定[J]. 安全与环境学报,2016(5): 140-145.
LI Junping, ZHANG Hao, LI Pengwei. On the determination approach to the numerical simulation for the rock mass parameters′ reduction factor application in Bijigou open -pit mine [J]. Journal of Safety and Environment, 2016(05): 140 -145.
[12]中华人民共和国住房和城乡建设部. 非煤露天矿边坡工程技术规范:GB51016-2014[S]. 北京:中国计划出版社,2014.
Ministry of Housing and Urban-Rural Construction of the People′s Republic of China. Technical code for non -coal open-pit mine slope engineering:GB51016-2014[S]. Beijing: China Planning Press, 2014.
[13]李俊平,连民杰. 矿山岩石力学[M]. 北京:冶金工业出版社, 2011.
LI Junping, LIAN Minjie. Mine rock mechanics [M]. Beijing: Metallurgical Industry Press, 2011 .
[14]彭文斌. FLAC3D 实用教程[M]. 北京:机械工业出版,2007: 304-315.
相似文献/References:
[1]郝建斌,张焕,李龙,等.稻草加筋土边坡稳定性模型试验[J].西安建筑科技大学学报(自然科学版),2024,56(02):176.[doi:10.15986/j.1006-7930.2024.02.003]
HAO Jianbin,ZHANG Huan,LI Long,et al.Model test on stability of straw reinforced soil slope[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2024,56(04):176.[doi:10.15986/j.1006-7930.2024.02.003]