[1]刘彦涛.下穿寺庙隧道爆破振动影响的数值模拟与分析[J].西安建筑科技大学学报(自然科学版),2021,53(02):160-166.[doi:10.15986/j.1006-7930.2021.02.002]
 LIU Yantao.Numerical simulation and analysis of the influence of blasting vibration in the tunnel crossing under a temple[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2021,53(02):160-166.[doi:10.15986/j.1006-7930.2021.02.002]
点击复制

下穿寺庙隧道爆破振动影响的数值模拟与分析()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
53
期数:
2021年02期
页码:
160-166
栏目:
出版日期:
2021-04-28

文章信息/Info

Title:
Numerical simulation and analysis of the influence of blasting vibration in the tunnel crossing under a temple
文章编号:
1006-7930(2021)02-0160-07
作者:
刘彦涛12
(1.中国铁建大桥工程局集团有限公司,天津 300300; 2.陕西省岩土与地下空间工程重点实验室,西安建筑科技大学,陕西 西安 710055)
Author(s):
LIU Yantao12
(1. China Railway Construction Bridge Engineering Bureau Group Co. Ltd, Tianjin 300300,China; 2.Shaanxi Key Laboratory of Geotechnical and Underground Space Engineering, Xi’an Univ. of Arch. & Tech.,Xi’an 710055, China)
关键词:
隧道工程 下穿施工 爆破控制 数值模拟 现场监测
Keywords:
tunnel engineering underground construction blast control numerical simulation: on-site monitoring
分类号:
U455.6
DOI:
10.15986/j.1006-7930.2021.02.002
文献标志码:
A
摘要:
合理的爆破设计方案是邻近既有建(构)筑物隧道钻爆施工振动危害控制的关键.新建商合杭铁路新大力寺隧道下穿既有寺庙,隧道下穿段爆破振动速度要求不大于2.0 cm/s; 针对新大力寺隧道下穿段钻爆施工特点,结合萨道夫斯基地震波衰减公式提出了台阶分区爆破方案; 通过数值模拟方法对拟定方案的振动影响进行评价,判断下穿段爆破方案的合理、可行性; 跟踪施工进行的爆破振动监测及与数值模拟结果的对比分析可知,模拟监测点振动时程曲线变化规律与实测振动影响规律基本一致,其振动波波峰和波谷出现的位置、时间和出现次数与实测情况相一致; 基于数值模拟分析推荐的台阶法分区爆破方案引起的邻近寺庙的振动速度实测值为1.95 cm/s,小于2.0 cm/s的控制标准.采用数值模拟方法在设计阶段能有效指导控制爆破方案的设计及评价,提高钻爆施工的效率,为隧道爆破施工方案确定提供了技术支持.
Abstract:
Reasonable blasting design plan is the key to control vibration hazard in tunnel drilling and blasting construction adjacent to existing buildings(structures). Aiming at the drilling and blasting construction characteristics of the Xindali Si large-section tunnel underneath the temple section of the Shanghehang Railway, a blasting plan for the upper steps, combined with the Sadowski seismic wave attenuation empirical formula, is proposed. The vibration impact of the proposed plan is evaluated by numerical simulation method, and the rationality and feasibility of the blasting plan of the under-crossing section are judged. Tracking the blasting vibration monitoring during construction and the comparative analysis with the numerical simulation results show that the vertical vibration velocity time history curve of the simulated monitoring point is basically consistent with the measured vibration influence law, and the location, time and appearance of the vibration wave crests and troughs. The frequency is consistent with the actual measurement; the measured value of the vibration velocity of the neighboring temple caused by the step method zone blasting scheme recommended by the numerical simulation analysis is 1.95 cm/s, which is less than the required 2.0 cm/s control standard, so the numerical simulation method used in the design stage can effectively guide the design and evaluation of the controlled blasting plan, reduce the number of blasting tests, improve the efficiency of drilling and blasting, and ensure the safe construction of the Xindalisi large-section tunnel underneath the temple and the safety of adjacent buildings. It is the technical support that was provided for tunnel blasting construction plan.

参考文献/References:

[1]陈正林,蒲文明,陈钒,等. 张家岩隧道水平层状泥岩段爆破优化研究[J].西安建筑科技大学学报(自然科学版),2019,51(6):865-872.
CHEN Zhenglin, PU Wenming, CHEN Fan, et al. Research on optimization of blasting for horizontal layered mudstone section of Zhangjiayan tunnel[J].Journal of Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(6):865-872.
[2]毛建超. 隧道掘进爆破设计与荷载计算系统的研究与应用[D].西安:西安建筑科技大学,2020.
MAO Jianchao. Research and Application of Blasting Design and Load Calculation System in Tunneling[D]. Xi’an:Xi’an Univ.of Arch.& Tech.,2020.
[3]宋战平,杨腾添,张丹锋,等. 溶洞对隧道(洞)稳定性影响的数值试验及现场监测分析[J].西安建筑科技大学学报(自然科学版),2014,46(4):484-491.
SONG Zhanping, YANG Tengtian, ZHANG Danfeng, et al. Numerical experiment and field monitoring analysis of the influence of karst cave on the stability of tunnel(cavity)[J].Journal of Xi’an Univ. of Arch. & Tech.(Natural Science Edition), 2014, 46(4):484-491.
[4]卢文波,杨建华,陈明,等. 深埋隧洞岩体开挖瞬态卸荷机制及等效数值模拟[J].岩石力学与工程学报,2011,30(6):1089-1096.
LU Wenbo,YANG Jianhua, CHEN Ming, et al. Mechanism and equivalent numerical simulation of transient release of excavation load for deep tunnel[J].Chinese Journal of Rock Mechanics and Engineering, 2011, 30(6):1089-1096.
[5]张文煊,卢文波. 龙滩水电站地下厂房开挖爆破损伤范围评价[J].工程爆破,2008,14(2):1-7.
ZHANG Wenxuan, LU Wenbo. Evaluation of blast-induced damage zone in excavation blasting of longtan underground workshop[J].Engineering Blasting, 2008, 14(2):1-7.
[6]SONG Zhanping,LI Shihao,WANG Junbao,et al. Determination of equivalent blasting load considering millisecond delay effect[J].Geomechanics and Engineering,2018,15(2): 745-754.
[7]陈庆,王宏图,胡国忠,等. 隧道开挖施工的爆破振动监测与控制技术[J].岩土力学,2005,26(6):964-967.
CHEN Qing, WANG Hongtu, HU Guozhong, et al. Monitoring and control technology for blasting vibration induced by tunnel excavation[J].Rock and Soil Mechanics, 2005, 26(6): 964-967.
[8]高文学,颜鹏程,李志星,等. 浅埋隧道爆破开挖及其振动效应研究[J].岩石力学与工程学报,2011,30(S2):415 3-4157.
GAO Wenxue, YAN Pengcheng, LI Zhixing, et al. Blasting excavation and vibration effects of shallow tunnel excavation[J].Chinese Journal of Rock Mechanics and Engineering, 2011, 30(S2): 4153-4157.
[9]王明年,潘晓马,张成满,等. 邻近隧道爆破振动响应研究[J].岩土力学,2004,25(3):412-414.
WANG Mingnian, PAN Xiaoma, ZHANG Chengman, et al. Study of blasting vibration influence on close-spaced tunnel[J].Rock and Soil Mechanics, 2004,25(3):412-414.
[10]ALI Fakhimi, MARK Lanari. DEM-SPH simulation of rock blasting[J].Computers and Geotechnics, 2014, 55: 158-164.
[11]周冠南,付军恩,杨腾添.隧道下穿新大力寺水库施工稳定性分析[J].铁道建筑技术,2019,36(3):14-18.
ZHOU Guannan, FU Junen, YANG Tengtian.Analysis on construction stability of tunnel underpassing the new dalisi reservoir[J].Railway Construction Technology,2019,36(3):14-18.
[12]杜莎芳. 复杂环境条件下大断面客专隧道下穿施工关键技术研究[D].西安:西安建筑科技大学,2017.
DU Shafang. Key technology research on undercutting construction of large section passenger tunnel under complicated environmental conditions[D].Xi’an:Xi’an Univ. of Arch. & Tech., 2017.
[13]JONG HoShin,HOON GiMoon,SUNG EunChae. Effect of blastinduced vibration on existing tunnels in soft rocks[J].Tunnelling and Underground Space Technology, 2011, 26(1): 51-61.
[14]LI Jianchun, LI H B, MA G W, et al. Assessment of underground tunnel stability to adjacent tunnel explosion[J].Tunnelling and Underground Space Technology, 2013, 35(35): 227-234.
[15]杨珊,陈建宏,郭宏斌,等. 基于回归分析的隧道爆破振动传播规律研究[J].中国安全科学学报,2011(10):71-75.
YANG Shan, CHEN Jianhong, GUO Hongbin, et al. Application of regressive analysis in the research on propagation law of tunnel blasting vibration[J].China Safety Science Journal, 2011(10): 71-75.
[16]SONG Zhanping, MAO Jianchao, TIAN Xiaoxu, et al. Optimization analysis of controlled blasting for passing through houses at close range in super-large section tunnels[J].Shock and Vibration,2019(8):1-12.
[17]TIAN Xiaoxu, SONG Zhanping, WANG Junbao. Study on the propagation law of tunnel blasting vibration in stratum and blasting vibration reduction technology[J].Soil Dynamics and Earthquake Engineering, 2019,126:1-12.
[18]贾磊,解咏平,李慎奎.爆破振动对邻近隧道衬砌安全的数值模拟分析[J].振动与冲击,2015,34(11):173-177,211.
JIA Lei,XIE Yongping,LI Shenkui. Numerical simulation for impact of blasting vibration on nearby tunnel lining safety[J].Vibration and Shock,2015,34(11):173-177,211.
(编辑 桂智刚)

相似文献/References:

[1]宋战平,刘 京,吴焕通,等.长陡斜井钢纤维喷射混凝土单层衬砌试验研究[J].西安建筑科技大学学报(自然科学版),2013,45(03):348.[doi:10.15986/j.1006-7930.2013.03.008]
 SONG Zhan-ping,LIU Jing,WU Huan-Tong,et al.Experimental research on single-layer tunnel lining of steel fiber shotcrete and the application in motenlin deviated well[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2013,45(02):348.[doi:10.15986/j.1006-7930.2013.03.008]
[2]宋战平、,杨腾添,张丹锋,等.溶洞对隧道(洞)稳定性影响的数值试验及现场监测分析[J].西安建筑科技大学学报(自然科学版),2014,46(04):484.[doi:10.15986/j.1006-7930.2014.04.005]
 SONG Zhanping YANG TengtianZHANG DanfengLI Ning.Experiments and field monitoring and analysis about the impact of existing cave on the stability of the tunnel[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2014,46(02):484.[doi:10.15986/j.1006-7930.2014.04.005]
[3]张新柳.基于超前预报信息的隧道围岩分级及工程应用研究[J].西安建筑科技大学学报(自然科学版),2016,48(05):648.[doi:10.15986/j.1006-7930.2016.05.006]
 ZHANG Xinliu.Study on the classification and application of the tunnel s surrounding rock based on geological information forecast[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2016,48(02):648.[doi:10.15986/j.1006-7930.2016.05.006]
[4]宋战平,李世豪,张学钢,等.基于修正Peck法的隧道施工全地层变形规律研究[J].西安建筑科技大学学报(自然科学版),2018,50(02):190.[doi:10.15986/j.1006-7930.2018.02.006]
 SONG ZhanpingLI ShihaoZHANG XuegangWANG JunbaoWANG Tao.Study on strata settlement regular pattern induced by[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2018,50(02):190.[doi:10.15986/j.1006-7930.2018.02.006]
[5]宋战平,张 强,赵克明,等.基于现场监测及数值分析的隧道双导洞超前施工优化研究[J].西安建筑科技大学学报(自然科学版),2018,50(05):654.[doi:10.15986/j.1006-7930.2018.05.006]
 SONG Zhanping,ZHANG Qiang,ZHAO Keming,et al.Optimization study of advanced double-drift tunnel construction based on on-site monitoring and numerical analysis[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2018,50(02):654.[doi:10.15986/j.1006-7930.2018.05.006]
[6]王家滨,牛荻涛.硝酸侵蚀喷射混凝土NO-3扩散研究[J].西安建筑科技大学学报(自然科学版),2019,51(01):75.[doi:10.15986/j.1006-7930.2019.01.012]
 WANG Jiabin,NIU Ditao.Study on nitrate ion diffusion of lining shotcrete exposed to nitric acid[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(02):75.[doi:10.15986/j.1006-7930.2019.01.012]
[7]黄金,赵淼.基于贝叶斯网络的隧道围岩失稳风险分析[J].西安建筑科技大学学报(自然科学版),2019,51(04):545.[doi:10.15986/j.1006-7930.2019.04.012]
 HUANG Jin,ZHAO Miao.Risk analysis of tunnel surrounding rock based on Bayesian network[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(02):545.[doi:10.15986/j.1006-7930.2019.04.012]
[8]牛泽林,刘朝鹏,郑 蕾,等.大断面公路板岩隧道开挖与支护数值模拟研究[J].西安建筑科技大学学报(自然科学版),2020,52(03):376.[doi:10.15986/j.1006-7930.2020.03.010]
 NIU ZeLin,LIU Chaopeng,ZHENG Lei,et al.Numerical simulation study on excavation and support of slab tunnel in large section highway[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2020,52(02):376.[doi:10.15986/j.1006-7930.2020.03.010]
[9]周 文.下穿既有运营公路大断面浅埋隧道方案优选及监测分析[J].西安建筑科技大学学报(自然科学版),2020,52(04):520.[doi:10.15986-j.1006-7930.2020.04.008]
 ZHOU Wen.Scheme optimization and monitoring analysis of large section shallow buried tunnel on existing highway[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2020,52(02):520.[doi:10.15986-j.1006-7930.2020.04.008]
[10]宋战平,王双院,苏春生,等.黄土地层浅埋小净距非对称断面隧道施工方案优化[J].西安建筑科技大学学报(自然科学版),2022,54(05):646.[doi:10.15986/j.1006-7930.2022.05.002 ]
 SONG Zhanping,WANG Shuangyuan,et al.Optimization of construction scheme for shallow buried tunnel with small spacing asymmetric section in loess stratum[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2022,54(02):646.[doi:10.15986/j.1006-7930.2022.05.002 ]

备注/Memo

备注/Memo:
收稿日期:2020-11-17 修改稿日期:2021-03-20
基金项目:陕西省创新能力支撑计划-创新团队项目(2020TD-005)
第一作者:刘彦涛(1972-),男,高级工程师,主要从事土木工程施工管理工作.E-mail:2357773202@qq.com