[1] SAATY T L.Modeling unstructured decision problems-the theory of analytical hierarchies[J].Math.Comput.Simulation,1978,20(1):147-158.
[2] 左 军.层次分析法中判断矩阵的间接给出法[J].系统工程,1988,10(6):56-63.
ZUO Jun.Indirect method for constructing judgment matrix in AHP[J].Chinese Journal of Systems Engineering,1988,10(6):56-63.
[3] 徐泽水.层次分析新标度法[J].系统工程理论与实践,1998,18(10):74-77.
XU Ze-shui.A new scale method in AHP[J].Chinese Journal of Systems Engineering-Theory and Practice,1998,18(10):74-77.
[4] 舒 康,梁镇伟.AHP中的指数标度[J].系统工程理论与实践,1990,10(1):6-8.
SHU Kang.LIANG Zhen-wei.Index number scale in AHP[J].Chinese Journal of Systems Engineering-Theory and Practice,1990,10(1):6-8.
[5] 汪 浩,马 达.层次分析法标度评价与新标度方法[J].系统工程理论与实践,1993,13(5):24-26.
WANG Hao.MA Da.Scale evaluation and new scale methods[J].Chinese Journal of Systems Engineering-Theory and Practice,1993,13(5):24-26.
[6] 侯岳衡.沈德家.指数标度及其与几种标度的比较[J].系统工程理论与实践,1995,15(10):43-46.
HOU Yue-heng. SHEN De-jia. Index number scale and comparison with other scales[J]. Chinese Journal of Systems Engineering-Theory and Practice,1995,15(10): 43-46.
[7] 杨 帆.铁路桥梁地震灾害损失评估技术研究[D].石家庄:石家庄铁道大学,2010:68-91.
YANG Fan. Study on the assessment technology of the earthquake loss of railway bridge[D]. Shijiazhuang: Shijiazhuang Railway University,2010:68-91.
[8] 张吉军.模糊层次分析法(FAHP)[J].模糊系统与数学,2000,14(2):80-88.
ZHANG Ji-jun. Fuzzy analytical hierarchy process[J]. Fuzzy Systems and Mathematics, 2000, 14(2): 80-88
[9] 骆正清.杨善林.层次分析法中几种标度的比较[J].系统工程理论与实践,2004,9(10): 51-60.
LUO Zheng-qing. YANG Shan-lin. Comparative Study on Several Scales in AHP[J].Chinese Journal of Systems Engineering-Theory and Practice,2004,9(10):51-60.