[1]王昆伟,刘江平.深厚淤泥地区基桩低应变检测若干问题探析[J].西安建筑科技大学学报:自然科学版,2013,45(03):408-415.[doi:10.15986/j.1006-7930.2013.03.018]
 WANG Kun-wei,LIU Jiang-ping.Probes into problems with pile low strain detection in deep silt zone[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2013,45(03):408-415.[doi:10.15986/j.1006-7930.2013.03.018]
点击复制

深厚淤泥地区基桩低应变检测若干问题探析()
分享到:

西安建筑科技大学学报:自然科学版[ISSN:1006-7930/CN:61-1295/TU]

卷:
45
期数:
2013年03期
页码:
408-415
栏目:
出版日期:
2013-06-30

文章信息/Info

Title:
Probes into problems with pile low strain detection in deep silt zone
文章编号:
1006-7930(2013)03-0408-08
作者:
王昆伟12刘江平1
(1.中国地质大学,湖北 武汉 430074;2.广东省珠海市金湾区建设工程质量监督检测站,广东 珠海 519045)
Author(s):
WANG Kun-wei LIU Jiang-ping
(1.China University of Geosciences, Wuhan 430074, China; 2.Construction Quality Supervision Station of Jinwan District Zhuhai City, Zhuhai 519045, China)
关键词:
深厚淤泥预应力管桩极浅部缺陷桩身缺陷低应变测试
Keywords:
deep silt prestressed concrete pipe pile defect in pile shaft bored concrete pile defect low-strain test
分类号:
TU471.8
DOI:
10.15986/j.1006-7930.2013.03.018
文献标志码:
A
摘要:
对桩身极浅部缺陷判断和灌注桩缺陷判断的低应变测试热点和难点,结合深厚淤泥的地区特点和施工状况,采用低应变法、钻芯法和开挖验证,对大量的实测曲线和详实资料分析研究,得出:频率匹配好坏决定了低应变测试效果的好坏,以及对于超长桩和大直径灌注桩采用低应变法检测意义不大等结论
Abstract:
In view of the hot spot and difficult point about the estimate of the superficial part defect and bored concrete pile defect, and combined with the regional characteristics of deep mud and construction conditions, this article used the low strain method and drilling core method and the excavation on researching a large number of measured curve and detailed data analysis, The conclusion arrived at states that the frequency matching, determines the low strain test result. Large diameter and super-long pile piles with low strain gauge makes little sense to test results, etc. It also introduced some of our own experience

参考文献/References:

[1] 王昆伟. 岩土基础工程中工程物探效果分析[J]. 岩土工程学报,1998(5):44-49.
WANG Kun-wei.Applications ofthe geophysical prospecting method on geotechnicalfoundationengineering.Chi-neseJournal of Geotechnical Engineering, 1998(5):44-49.
[2] 管延淮, 王昆伟. 深厚淤泥地区基桩质量事故初析[J]. 工程质量专刊 ,2007(6):38-42.
GUAN Yan-huai, WANG Kun-wei.Preliminaryanalysisofdeepsiltfoundationpilequalityaccident[J].specialis-sueof “engineering quality”,2007(6):38-42.
[3] BOTTIAU Maurice.Recentevolutionsin deepfoundationtechnologies[C] ∥Proceedings of10thInternational DFIConference, Amsterdam, 2006: 46-83.
[4] POULOS Harry G.Ground movements-Ahiddensourceofloadingondeepfoundation[C]∥Proceedingsof10thIn-ternational D FI Conference, Amsterdam, 2006: 2-19.
[5] KATZENBACH Rolf, BACHMANN Gregor, GUTBERLET Christian, etal.Present developmentsinthe designofdeepfoundations[C]∥Proceedings of10thInternational DFI Conference, Amstedam, 2006:32-43.
[6] HOLEYMAN Alain E.Pile monitoring, testing, anddataprocessing: Newdevelopmentsandremainingissues[C]∥Proceedings of10thInternational DFI Conference, Amsterdam, 2006: 86-100.
[7] FINNO RJ, GASMANS L.Impulseevaluationofdrilledshafts[J].Journalof Geotechnicaland GeoenvironmentalEngineering, 1998, 124(10): 965-975.
[8] HEARNE T M, STOKOE K H, REESE L C.Drilled-shaftintegrity by wave propagation method[J].Journal ofGeotechnical Engineering, 1981, 107(10): 1327-1344.
[9] 中华人民共和国建设部.JGJ106-2003 建筑基桩检测技术规范[S]. 北京: 中国建筑工业出版社,2003.
The ministryofconstructionofthe Peoples Republic of China.JGJ106-2003Technicalcodefortesting of buildingfoundation piles[S].Beijing:China Architecture & Building Press, 2003.
[10] 广东省建设厅.DBJ15-60-2008 建筑地基基础检测规范[S]. 北京: 中国建筑工业出版社,2008.
Guangdong Provincial Departmentof Construction.DBJ15-60-2008Codefor Testing of Building Foundation[S].Beijing: China Architecture & Building Press, 2008.

备注/Memo

备注/Memo:
收稿日期:2012-12-06 修改稿日期:2013-05-05
作者简介:王昆伟(1965-),男,云南个旧人,博士研究生,高级工程师,主要从事地基和基础处理、基桩检测、结构检测等方面研究.
更新日期/Last Update: 2015-10-05