参考文献/References:
[1] 胡永宏, 贺思辉. 综合评价方法[M]. 北京: 科技出版社,2000.
HU Yong-hong, HE Si-hui.Methodofcomprehensiveassessment[M].Beijing:Science Press, 2000.
[2] 章 穗, 张 梅, 迟国泰. 基于熵权法的科学技术评价模型及其实证研究[J]. 管理学报,2010,7(1):34-42.
ZHANG Hui, ZHANG Mei, CHI Guo-tai.Thescience andtechnologyevaluation model based on entropy weightandempirical duringthe10thfive-yearof China[J].ChineseJournal of Management, 2010,7(1):34-42.
[3] 王爱领, 孙少楠. 基于熵度量法的代建制项目风险评价研究[J] . 中国管理信息化,2009,12(9):108-111.
WANG Ai-ling, SUN Shao-nan.The research of rish evaluation of agent construction project based on entropyweight[J].Chinese ManagementInformationization, 2009,12(9):108-111.
[4] 林 挺, 常 杪. 污水处理厂 BOT 项目风险识别 ? 分配与变化分析[J] . 中国给水排水,2006,22(18):72-76.
LIN Ting, CHANG Miao.Analysisonriskidentification, allocationandchangeinbotprojectsof wastewatertreat-ment plant[J].China Water & Wastewater, 2006,22(18):72-76.
[5] 高 幸, 韩佩宏. 改进层次分析法在 ABS 高速公路风险评估中的应用 [J]. 公路工程,2007,32(5):64-69.
GAO Xing, HAN Pei-hong.Applicationofimprovedahp methodinriskassessmentofabs highway[J].HighwayEngineering, 2007,32(5):64-69.
[6] 罗军刚, 解建仓, 阮本清. 基于熵权的水资源短 缺风险模糊综合评价模型及应用 [J]. 水 利 学 报,2008,39(9):1092-1097.
LUOJun-gang, XIEJian-cang, RUAN Ben-qing.Fuzzycomprehensiveassessment modelfor watershaortageriskbased onentropy weight[J].Journal of Hydraulic Engineering, 2008,39(9):1092-1097.
[7] 张 薇.ABS 项目融资风险管理[D] . 北京: 北京化工大学,2008.
ZHANG Wei.Risk managementofabs projectfinancing[D].Beijing: Beijing Universityof Chemical Technology,2008.
[8] CHEN Wei, HAO Xiao-hong.An optimal combination weights method considering both subjective and objectiveweightinformationin powerqualityevaluation [J].Lecture Notesin Electrical Engineering, 2011,87(2):97-105.
[9] BERTOLINI M, BRAGLIA M, CARMIGNANI G.Application ofthe ahp methodologyin making a proposalforpublic workcontract [J].InternationalJournal of Project Management, 2006,24(5):422-430.
[10] YEJ.Multicriteriafuzzy decision making method using entropy weights based correlationcoefficients ofintervalvaluedintuitionisticfuzzysets [J].Applied Mathermatical Modelling, 2010,34(12):3864-3870.
[11] WANG T H, LEE H D.Developingafuzzy TOPSISapproach based onsubjective weights and objective weights[J].Expert Systems with Application, 2009,36(5):8980-8985.
[12] DZAALI S,ZOLAIT A.Assessment ofinformation security maturity: an exploration study of Malaysian publicserviceorganization[J].Journal of Systems andInformation Technology, 2012,14(1):23-57.